TenderDekho Logo
Active GEM

Bokaro Steel Plant VRLA Battery Bank Tender 220V 100Ah Exide Equivalent 36 Months Warranty 2026

Bid Publish Date

09-Sep-2026, 10:13 am

Bid End Date

22-Sep-2026, 1:00 pm

Location

WEST SINGHBHUM , JHARKHAND

Progress

Issue09-Sep-2026, 10:13 am
AwardPending

Tender Overview

The Bokaro Steel Plant, part of Steel Authority of India Limited, invites bids for a Sealed Maintenance Free VRLA Battery Bank with a capacity of 100 Ah per bank, built from 110 cells of 2V each, totaling 220V DC. The incumbent supplier must supply, install, test, and commission the battery bank, including stand and accessories, with an estimated scope of complete battery bank provisioning. The procurement uses the option clause allowing up to 25% quantity variation and requires delivery aligned to original/extended periods. A distinctive feature is the buyback offer for old VRNM 54 P AMCO SAFT batteries (1.2V per cell, 170 units) and a 36-month warranty post-installation.

The project emphasizes on-site installation within 30 days of material receipt, with payment post-installation and commissioning as per SAIL P1. The vendor must provide special installation tools, arrange local conveyance, and handle unskilled labor via MIOM. Accommodation at the Company Guest House is chargeable, subject to availability, and the bidder must manage the entire lifecycle from supply to commissioning.

This tender targets suppliers capable of delivering VRLA banks meeting exact cell voltage, capacity, and wiring standards and demands a robust warranty and post-warranty support framework. Unique clauses include buyback of deprecated battery sets and adherence to the optional quantity expansion at contracted rates.

Technical Specifications & Requirements

  • Product: Sealed Maintenance Free (SMF) VRLA Battery Bank
  • Capacity: 100 Ah per bank
  • Cell configuration: 110 cells × 2 V each
  • Bank voltage: **220 V DC
  • Make/Equivalence: Exide 100 Ah or equivalent
  • Stand & accessories: Included
  • Delivery/Installation timeline: within 30 days from material receipt
  • Warranty: 36 months from installation date
  • Payment terms: post-supply, installation, commissioning as per SAIL P1
  • Buyback: old batteries (VRNM 54 P AMCO SAFT, 1.2 V per cell) 170 units
  • Tools & labour: supplier to provide installation tools; MIOM to supply unskilled labour
  • Accommodation & travel: Guest House stay on chargeable basis; local conveyance by bidder
  • Option clause: quantity may increase/decrease by up to 25% during/after contract

Terms, Conditions & Eligibility

  • EMD: not specified in data; bidders should verify at call
  • Delivery terms: as per original and extended delivery periods under option clause
  • Acceptance: successful installation and commissioning required before payment
  • Documentation: submit OEM authorizations, installation methodology, and warranty commitments
  • Warranty/Service: 36 months; repair/charge at bidder facility during warranty
  • Penalties: LD terms not specified in data; ensure compliance with P1 terms
  • Worksite conditions: accommodation and local conveyance as described; unskilled labour provision by MIOM
  • Validity: quote validity is implied by contract terms; confirm during bid submission

Key Specifications

    • Product: Sealed Maintenance Free (SMF) VRLA Battery Bank
    • Capacity: 100 Ah per bank
    • Cell configuration: 110 × 2 V cells
    • Bank voltage: 220 V DC
    • Make/Equivalence: Exide 100 Ah or equivalent
    • Stand & accessories: Included
    • Delivery timeline: 30 days from material receipt
    • Warranty: 36 months from installation
    • Buyback: VRNM 54 P AMCO SAFT, 170 nos, 1.2 V per cell
    • Payment: After successful installation/commissioning per SAIL P1
    • Option clause: ±25% quantity adjustments

Terms & Conditions

  • Key Term 1: Up to 25% quantity variation at contract and during currency

  • Key Term 2: 30-day installation window from material receipt

  • Key Term 3: 36-month warranty from installation date

Important Clauses

Payment Terms

Payment released after successful supply, installation, and commissioning; terms align with SAIL P1

Delivery Schedule

Delivery and installation must occur within 30 days of material receipt; option for extended periods applies per contract formula

Penalties/Liquidated Damages

Specific LD terms not detailed; adherence to P1 terms governs penalties and remedies

Bidder Eligibility

  • Experience in supplying and installing VRLA battery banks (sealed maintenance free)

  • Ability to provide OEM authorization or equivalence for Exide-compatible cells

  • Financial capability to support 170-unit buyback and post-installation service

Tender Data

Bid Details

Quantity

220

Bid Type

Two Packet Bid

Bid Validity

100 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3)

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

West Singhbhum

Delivery Pincodes

833223

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pravin Kumar833223,JHARKHAND GROUP OF ORE MINES, SAIL/JHARKHAND GROUP OF MINES, AT+POST: MEGHATABURU, DISTRICT: WEST SINGHBHUM, STATE: JHARKHAND, PIN: 833223., West Singhbhum, 833223West SinghbhumJharkhand83322322060-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITEDBOKARO STEEL PLANT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9621193.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bokaro Steel Plant

Office Name

Bslp61

Grievance Contact

[email protected]

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration

2

PAN card

3

Experience certificates for VRLA battery banks supply/installation

4

Financial statements

5

EMD/Security deposit documentation (if applicable)

6

Technical bid documents (compliance to VRLA, capacity, voltage)

7

OEM authorization for Exide-equivalent battery banks

8

Installation methodology and commissioning plan

9

Warranty commitments and service support details

Frequently Asked Questions

How to bid on Bokaro VRLA battery tender in 2026 for 220V banks?

Bidders must submit GST, PAN, experience certificates, financials, and OEM authorizations; provide installation methodology and adherence to 36-month warranty. The bid requires Exide-equivalent 100 Ah VRLA banks, 110 cells, and 220 V DC configuration, with post-installation payment per SAIL P1. Include buyback plan for old batteries.

What are the essential documents for SAIL Bokaro battery tender submission?

Essential documents include GST registration, PAN card, experience certificates, financial statements, EMD (if applicable), OEM authorization, technical compliance, installation plan, and warranty commitments. Ensure compliance with Exide-equivalent VRLA bank specs and 36-month warranty terms.

What are the technical specs for the VRLA battery bank in Bokaro tender?

The bank must be SMF VRLA with 100 Ah capacity, 110 cells of 2 V each, totaling 220 V DC. Stand and accessories included; delivery within 30 days of material receipt; warranty for 36 months from installation; buyback of 170 units of VRNM 54 P AMCO SAFT.

What is the procurement buyback requirement for old batteries?

Bidders must offer a buyback for old VRNM 54 P AMCO SAFT batteries, 170 units, rated at 1.2 V per cell. The buyback value and process should align with contract terms and be reflected in the bid. Ensure proper handling and disposal as per regulations.

What are the delivery and payment terms for Bokaro VRLA battery tender?

Delivery must occur within 30 days post-material receipt. Payment is released after successful supply, installation, and commissioning, as per SAIL P1 terms. The option clause allows ±25% quantity variation, with adjusted delivery times calculated per contract formula.

Which standards and OEM requirements apply to bid submission?

Bids must reference Exide equivalent 100 Ah VRLA banks; provide OEM authorization or credible equivalence. Ensure VRLA compliance and report conformity to IS 15549-related expectations, with a 36-month warranty and post-installation service readiness.

How will quantity fluctuation impact the Bokaro battery contract?

The purchaser may increase or decrease quantity by up to 25% at contract placement and during currency. Additional delivery time is proportionate to the extra quantity, with a minimum of 30 days; planning should account for supply chain variability.

What installation support is required from the supplier?

Supplier must provide installation tools and tackles, arrange local conveyance, and manage unskilled labour via MIOM. Accommodation and guest house charges apply; ensure site readiness, safety, and commissioning support within the 30-day window.

Explore More Opportunities

Quick Access