Bid Publish Date
20-Oct-2026, 1:55 pm
Bid End Date
03-Nov-2026, 2:00 pm
Value
₹19,470
Location
Progress
The Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for substation clamps and connectors under the Q3 category, located in Gautam Buddha Nagar, Uttar Pradesh. Estimated value is ₹19,470.00. Details on technical specs are not provided, but the tender includes an option clause allowing ±25% quantity variations and contract delivery time adjustments based on the original delivery period. The scope focuses on electrical substation hardware components and requires bidders to align with the option-based delivery framework. This procurement emphasizes flexible quantity handling and adherence to contracted rates during extended delivery windows.
Substation clamps / connectors (Q3) should be evaluated for compatibility with standard substation hardware
Estimated contract value around ₹19,470 with a ±25% quantity change provision
Delivery terms hinge on original delivery period and calculated extensions (minimum 30 days)
ATC document exists; no explicit standards or safety certifications listed in the data
No BOQ items published; bidders must rely on ATC guidance and contracted rates
Option clause allows ±25% quantity variation and delivery-time extension at contracted rates
Delivery period linked to the last date of the original order with calculated extra time
EMD and detailed documentation requirements are not disclosed in the provided data
Not specified in the data; bid should reference ATC for payment specifics
Delivery starts after the original order; extension time = (extra quantity / original quantity) × original delivery period, minimum 30 days
Not specified in the data; refer to ATC for LD provisions
Must accept option-based quantity adjustments up to 25%
Must comply with delivery-time extension rules tied to original delivery period
Provide necessary bid documents as per ATC and statutory requirements
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
50 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Substation Clamps / Connectors (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Gautam Buddha Nagar
Delivery Pincodes
201301
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Praveen Dubey | 201301,ELECTRICITY TRANSMISSION DIVISION-I , 220 KV SUB STATION SECTOR- 20 NOIDA | Gautam Buddha Nagar | Uttar Pradesh | 201301 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
03-Nov-2026, 8:30 am
Opening Date
04-Nov-2026, 8:30 am
Extended Deadline
31-Oct-2026, 8:30 am
Opening Date
01-Nov-2026, 8:30 am
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (relevant to electrical substation hardware if available)
Financial statements or turnover information (if requested in ATC)
EMD/Security deposit documentation (amount not disclosed in data)
Technical bid documents (as per ATC)
OEM authorizations or dealership certificates (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders must review the ATC document, submit GST and PAN, provide experience certificates for electrical hardware, and upload technical bids. The tender allows ±25% quantity adjustments and requires adherence to the original delivery period with minimum 30 days for any extension. Ensure pricing covers contracted rates for adjusted quantities.
Submit GST registration, PAN card, experience certificates in electrical substations, financial statements, EMD documentation, OEM authorizations if applicable, and the ATC-compliant technical bid. The exact list is defined in the ATC; prepare copies and scanned formats for submission.
Delivery terms are based on the last date of the original delivery order. If quantity increases, the extension time is calculated as (extra quantity/original quantity) × original delivery period, with a minimum 30 days. Extended delivery must still be at contracted rates.
The data notes an ATC document but does not specify explicit standards. Bidders should verify IS/IEC or local requirements in the ATC. Ensure submission includes any OEM authorizations and compliance certifications if requested in the ATC.
Estimated value is ₹19,470.00. The EMD amount is not disclosed in the available tender data; bidders should check the ATC for the exact EMD amount and payment method prior to bid submission.
Eligible bidders must accept quantity adjustment provisions and fulfill delivery-extension requirements. Submissions must include GST, PAN, experience proofs, financials, and any OEM authorizations. Verification is through the ATC attached to the tender documentation.
Delivery starts after the original delivery order date. If quantities are revised, the formula applies to extend time. Minimum extension is 30 days, ensuring suppliers align production schedules with the extended timeline.