TenderDekho Logo
Active GEM

UPPCL Substation Clamps / Connectors Tender Gautam Buddha Nagar Uttar Pradesh 2026 - Q3 Category

Bid Publish Date

20-Oct-2026, 1:55 pm

Bid End Date

03-Nov-2026, 2:00 pm

Value

₹19,470

Generate Docs

Progress

Issue20-Oct-2026, 1:55 pm
Corrigendum31-Oct-2026
AwardPending

Tender Overview

The Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for substation clamps and connectors under the Q3 category, located in Gautam Buddha Nagar, Uttar Pradesh. Estimated value is ₹19,470.00. Details on technical specs are not provided, but the tender includes an option clause allowing ±25% quantity variations and contract delivery time adjustments based on the original delivery period. The scope focuses on electrical substation hardware components and requires bidders to align with the option-based delivery framework. This procurement emphasizes flexible quantity handling and adherence to contracted rates during extended delivery windows.

Technical Specifications & Requirements

  • Product category: Substation clamps / connectors (Q3)
  • Location: Gautam Buddha Nagar, Uttar Pradesh
  • Estimated value: ₹19,470.00
  • Specifications: No explicit technical specs published; BOQ shows zero items
  • Key terms: Option clause permits quantity adjustments up to ±25% and extension of delivery time proportional to extra quantity, minimum 30 days
  • Delivery: Delivery period computed from the last date of the original delivery order; extension mechanics described in the terms
  • Compliance: Bidders must comply with the purchaser’s option clause and provide pricing at contracted rates for adjusted quantities
  • Documentation: Only ATC/BOQ presence noted; no standard certifications listed

Terms, Conditions & Eligibility

  • EMD: Not disclosed in the tender data
  • Quantity: Option to increase/decrease up to 25% during contract
  • Delivery: Original delivery period; additional time formula provided; minimum 30 days
  • Payment terms: Not specified in the available data
  • Warranty/AMC: Not specified
  • Documents: Relevant bid-specific ATC file referenced; no explicit list of required documents in the excerpt
  • Eligibility: Suppliers must accept option-based delivery adjustments and comply with attached ATC terms

Key Specifications

  • Substation clamps / connectors (Q3) should be evaluated for compatibility with standard substation hardware

  • Estimated contract value around ₹19,470 with a ±25% quantity change provision

  • Delivery terms hinge on original delivery period and calculated extensions (minimum 30 days)

  • ATC document exists; no explicit standards or safety certifications listed in the data

  • No BOQ items published; bidders must rely on ATC guidance and contracted rates

Terms & Conditions

  • Option clause allows ±25% quantity variation and delivery-time extension at contracted rates

  • Delivery period linked to the last date of the original order with calculated extra time

  • EMD and detailed documentation requirements are not disclosed in the provided data

Important Clauses

Payment Terms

Not specified in the data; bid should reference ATC for payment specifics

Delivery Schedule

Delivery starts after the original order; extension time = (extra quantity / original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in the data; refer to ATC for LD provisions

Bidder Eligibility

  • Must accept option-based quantity adjustments up to 25%

  • Must comply with delivery-time extension rules tied to original delivery period

  • Provide necessary bid documents as per ATC and statutory requirements

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

1

Past Performance

50 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Substation Clamps / Connectors (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Gautam Buddha Nagar

Delivery Pincodes

201301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Praveen Dubey201301,ELECTRICITY TRANSMISSION DIVISION-I , 220 KV SUB STATION SECTOR- 20 NOIDAGautam Buddha NagarUttar Pradesh201301115-

Authority Records

ENERGY DEPARTMENTUTTAR PRADESH POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10055452.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Electricity Civil Transmission Circle 132 Kv S/s Martinpurwa Lucknow

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

31-Oct-2026

Extended Deadline

03-Nov-2026, 8:30 am

Opening Date

04-Nov-2026, 8:30 am

#2

Update

28-Oct-2026

Extended Deadline

31-Oct-2026, 8:30 am

Opening Date

01-Nov-2026, 8:30 am

Advertisement

Categories 6

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (relevant to electrical substation hardware if available)

4

Financial statements or turnover information (if requested in ATC)

5

EMD/Security deposit documentation (amount not disclosed in data)

6

Technical bid documents (as per ATC)

7

OEM authorizations or dealership certificates (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for substation clamps tender in Gautam Buddha Nagar 2026

Bidders must review the ATC document, submit GST and PAN, provide experience certificates for electrical hardware, and upload technical bids. The tender allows ±25% quantity adjustments and requires adherence to the original delivery period with minimum 30 days for any extension. Ensure pricing covers contracted rates for adjusted quantities.

What documents are required for UP electricity hardware tender 2026

Submit GST registration, PAN card, experience certificates in electrical substations, financial statements, EMD documentation, OEM authorizations if applicable, and the ATC-compliant technical bid. The exact list is defined in the ATC; prepare copies and scanned formats for submission.

What are the delivery terms for UPPCL clamps tender

Delivery terms are based on the last date of the original delivery order. If quantity increases, the extension time is calculated as (extra quantity/original quantity) × original delivery period, with a minimum 30 days. Extended delivery must still be at contracted rates.

Which standards or certifications are required for UPPCL procurement

The data notes an ATC document but does not specify explicit standards. Bidders should verify IS/IEC or local requirements in the ATC. Ensure submission includes any OEM authorizations and compliance certifications if requested in the ATC.

What is the estimated value and EMD for this UP tender

Estimated value is ₹19,470.00. The EMD amount is not disclosed in the available tender data; bidders should check the ATC for the exact EMD amount and payment method prior to bid submission.

How to determine eligibility for UPPCL substation hardware tender

Eligible bidders must accept quantity adjustment provisions and fulfill delivery-extension requirements. Submissions must include GST, PAN, experience proofs, financials, and any OEM authorizations. Verification is through the ATC attached to the tender documentation.

When is delivery expected after placing order for clamps

Delivery starts after the original delivery order date. If quantities are revised, the formula applies to extend time. Minimum extension is 30 days, ensuring suppliers align production schedules with the extended timeline.

Advertisement