Compacted Earth for Embankment,Compacted Earth for sub grade and earthen Shoulder Soil,Stone Boulde
Border Road Organisation
Bid Publish Date
16-Dec-2024, 8:13 pm
Bid End Date
06-Jan-2025, 9:00 pm
EMD
₹2,28,554
Progress
Quantity
24912
Category
Surface Dressing
Bid Type
Two Packet Bid
Indian Army invites bids for Surface Dressing, Earthwork Excavation, Sub Soil Line 110mm, Sub Soil Line 200mm, Geotextile, Sub Base with Stone Metal, Earthwork Filling, Brickwork, Bermuda Grass, Spreading Manure and Sludge, Dismantling Masonry, Dismantling R. C. C. , Removal of Earth, Goal Post. Quantity: 24912. Submission Deadline: 06-01-2025 21: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Border Road Organisation
Uranium Corporation Of India Limited
EAST SINGHBHUM, JHARKHAND
Hindustan Petroleum Corporation Ltd
CHENNAI, TAMIL NADU
Indian Army
MUMBAI, MAHARASHTRA
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Surface Dressing | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 CM depth and disposal of the rubbish within a lead upto 75 M as directed. | 6,240 | sq m | pokhriya.188k | 15 |
| 2 | Earthwork Excavation | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spills within a lead of 75m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of foundation upto 1500mm. | 1,400 | cu m | pokhriya.188k | 15 |
| 2 | Sub Soil Line 110mm | Construction of sub-surface drain with perforated UPVC agriculture pipes with smooth layer inside and outside wrapped with non-woven fabric of 250 gms, size 110mm dia, OD and 100 mm dia, 6 kg pressure as per direction of EIC | 1,400 | meters | pokhriya.188k | 15 |
| 3 | Sub Soil Line 200mm | Construction of sub-surface drain with non-perforated UPVC agriculture pipes with smooth layer inside and 200 mm dia with 300 mm soil filling above the pipe all complete and as per direction of EIC | 770 | meters | pokhriya.188k | 15 |
| 4 | Geotextile | Supplying, placing and laying of 1 of 2 mtr wide non woven geotextile membrane cloth to restrict the errotion of soil and create a filter media for sub soil drainage line as per requirement of the EIC | 160 | sq m | pokhriya.188k | 15 |
| 5 | Sub Base with Stone Metal | Preparing Sub Base by consolidating stone metal of specific size in hand crust to requisite thickness (measured after compaction) in layer including screening of metals etc as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bandh to protect edge and preparating the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density for construction of sub base by consolidating stone metal (40mm to 6 mm) with stone dust screening 75 mm thick. | 520 | cu m | pokhriya.188k | 15 |
| 6 | Earthwork Filling | Earth work in filling in compound with good earth mixed with required proportion of earth and river sand (graded) and laying in layers not exceeding 150mm including breaking clods mixing at site and consolidating the same by proper watering and rolling with mechanical vibrator roller with earth arrange by agency from outside Fort William area. | 936 | cu m | pokhriya.188k | 15 |
| 7 | Brickwork | 5 inch brickwork for edge protection | 41 | sq m | pokhriya.188k | 15 |
| 8 | Bermuda Grass | Supplying and fixing grasses tiles of Bermuda Grass Healthy & fresh grasses (size one inch by one inch or bigger) including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from wees and fit for mowing excluding supplying good earth as required by Engineer-in-Charge (rate includes supply of labour, tools & plants including materials. | 6,240 | sq m | pokhriya.188k | 15 |
| 9 | Spreading Manure and Sludge | Spreading of sludge dump manure or farm yard manure or animal dung manure and good earth as is when required basis. This includes supply of labour tools and plants excluding materials. | 6,240 | sq m | pokhriya.188k | 15 |
| 10 | Dismantling Masonry | Dismantling all type of masonry excepting cement concrete plain or reinforced stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m in ground floor including roof. | 9 | cu m | pokhriya.188k | 15 |
| 11 | Dismantling R.C.C. | Dismantling R.C.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75m including stacking of steel bars in ground floor including roof. | 5 | cu m | pokhriya.188k | 15 |
| 12 | Removal of Earth | Removal of excavated earth mix soil from existing football ground to approved stacking or damping area in site the campus of Fort William within a lead of 2km. | 950 | cu m | pokhriya.188k | 15 |
| 13 | Goal Post | Providing and fixing customized Football Goal Post with Net | 1 | pair | pokhriya.188k | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
The eligibility requirements include being a registered legal entity with a minimum average annual turnover of 30 Lakhs over the past three years. Bidders must have at least three years of experience in similar constructions, specifically catering to sports fields or facilities.
Bidders must provide various documents, including experience criteria, past performance records, bidder turnover proof, and OEM annual turnover certificates. Additionally, if a bidder seeks exemptions regarding experience or turnover, supporting documents must be submitted.
To register for the tender submission, potential bidders must fulfill the eligibility requirements and prepare the necessary documentation as specified in the bid. Registration is typically done through the designated government portal or platform hosting the tender.
The acceptable document formats for submission are typically PDF and are noted in the tender document. Ensure to consult the main tender document for specific format requirements based on provided guidelines.
Technical specifications require the proper conduct of earthwork excavation, installation of subsoil lines (110mm and 200mm), procurement of geotextiles, and installation of a sub-base with stone metal. Additional materials like Bermuda grass and goalposts are also specified.
The construction must adhere to FIFA standards for sports facilities, ensuring all materials and methods comply with these specifications throughout the project.
Yes, bidders must comply with all specified eligibility criteria, including financial stability, experience in construction projects, and must provide necessary documentation verifying compliance during the evaluation process.
The Earnest Money Deposit (EMD) is 228554, which must be submitted along with the tender bid to ensure commitment to the bidding process.
Performance security requirements are outlined in the tender document, typically involving a percentage of the contract value, ensuring that the bidder fulfills the obligations set forth in the contract.
Payment terms are generally specified to align with project milestones and may require verification of work progress before disbursement. Details are provided within the main tender document.
The price evaluation follows a total value-wise evaluation method, focusing on the lowest-priced technically qualified bidders. This assures that cost-effective yet technically sound solutions are selected for the project.
Notifications of the results will usually be sent to all bidders via the official platform or method outlined in the tender, ensuring transparency throughout the evaluation process.
No specific benefits or exemptions related to experience or turnover are provided for MSEs in this tender, as per current stipulations.
Startups similarly do not receive exemptions regarding years of experience or required turnover. All bidders must meet specified criteria to participate fully.
The tender is oriented towards encouraging local procurement and compliance with 'Make in India' policies by prioritizing domestic bidders and materials unless otherwise stated.
Services must be delivered at the FW Stadium, as outlined in the tender specifications, where the new football ground is to be constructed.