TenderDekho Logo
GEM

Mishra Dhatu Nigam Limited tension and compression testing equipment tender 2027-2029 Mishra Dhatu Nigam Limited in Defence Production 2027

Bid Publish Date

09-Jul-2026, 11:27 am

Bid End Date

30-Jul-2026, 11:00 am

Progress

Issue09-Jul-2026, 11:27 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

36

Category

Capacity 100kN Model-1195, Mode- Tension for the Year 2027

Bid Type

Single Packet Bid

Categories 43

Tender Overview

Mishra Dhatu Nigam Limited invites bids for a range of tension and compression test equipment, including multiple capacity models such as 100kN Model-1195, 200kN Model-4507, and additional small-capacity units (5kN, 1kN, 0.2kN) for the years 2027, 2028, and 2029. The procurement covers diverse modes: tension, compression, and combined tension-compression. The estimated value and exact quantities are not disclosed, but the scope spans a broad spectrum of load capacities to support defence material testing. The buyer imposes flexible quantity options up to 50% during contract award and currency, with delivery timelines calibrated from the last delivery date. This tender requires strict compliance with eligibility and financial stability criteria as part of the technical bid.

Technical Specifications & Requirements

  • No explicit product specifications listed in the tender; bidders should align with standard force testing equipment capable of delivering up to 300kN in tension/compression modes as inferred from the itemized capacities.
  • Potentially required capabilities include multi-mode operation (tension, compression, and combined) across multiple year-specific delivery windows (2027–2029).
  • Minimum documentation includes corporate registrations and evidence of financial solvency; technical bids must reflect adherence to statutory registrations and bank-backed solvency.
  • Key indicators suggest a focus on robust, defence-grade testing equipment suitable for high-reliability applications.
  • Emphasis on supplier experience and OEM authorization for credible capability demonstration.

Terms, Conditions & Eligibility

  • PAN/GST/ESI/EPF registrations required with copies attached; unconditional acceptance of all commercial terms.
  • Positive net worth in each of the last three financial years or a solvency certificate of Rs. 33,80 issued within 6 months.
  • Bidders must provide audited accounts (2024-25, 2023-24, 2022-23) or Chartered Accountant certificate detailing net worth with official seal and membership numbers.
  • Purchase terms include a flexible quantity option up to 50% and delivery extensions computed as per the option clause, with minimum 30 days extension.

Key Specifications

  • Product/service names: tension/compression test machinery with multiple capacity models

  • Capacities inferred: 100kN, 200kN, 300kN, 5kN, 1kN, 0.2kN

  • Modes: tension, compression, and tension-compression

  • Delivery timeline: multiple year windows (2027-2029) with option to extend

  • Standards/certifications: not explicitly stated; bidders to demonstrate compliance via OEM certifications and quality controls

Terms & Conditions

  • 50% quantity variation right during contract/permissible extension

  • Delivery period linked to original/extended delivery orders with minimum 30 days

  • Mandatory PAN/GST/ESI/EPF registrations and positive net worth or solvency certificate

Important Clauses

Payment Terms

Not explicitly stated; bidders should expect standard GOV/DEFENCE terms with milestone payments aligned to delivery and acceptance.

Delivery Schedule

Delivery begins from the last date of the original delivery order; option clause may extend delivery with calculated time based on (Increased quantity/Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Not specified; bidders should assume standard LDs as per DEFENCE procurement norms.

Bidder Eligibility

  • PAN, GST, ESI, EPF registrations verified

  • Positive net worth in each of last three financial years or bank solvency certificate

  • Unconditional acceptance of all commercial terms

  • Technical capability evidenced by Annexure I and relevant experience

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Capacity 100kN Model-1195, Mode- Tension for the Year 2027 , Capacity 100kN Model-1195, Mode- Tension for the Year 2028 , Capacity 100kN Model-1195, Mode- Tension for the Year 2029 , Capacity 200kN Model-4507 Mode - Tension for the Year 2027 , Capacity 200kN Model-4507 Mode - Tension for the Year 2028 , Capacity 200kN Model-4507 Mode - Tension for the Year 2029 , Mode- Tension and Compression for the year 2027 , Mode- Tension and Compression for the year 2028 , Mode- Tension and Compression for the year 2029 , Capacity 100kN Mode- Tension and Compression for the year 2027 , Capacity 100kN Mode-Tension and Compression for the year 2028 , Capacity 100kN Mode-Tension and Compression for the year 2029 , Capacity 100kN Mode- Tension and Compression for the year 2027 , Capacity 100kN Mode- Tension and Compression for the year 2028 , Capacity 100kN Mode- Tension and Compression for the year 2029 , Capacity 300kN Mode- Tension and Compression for the year 2027 , Capacity 300kN Mode- Tension and Compression for the year 2028 , Capacity 300kN Mode- Tension and Compression for the year 2029 , Capacity 5kN Mode- Tension and Compression for the year 2027 , Capacity 5kN Mode- Tension and Compression for the year 2028 , Capacity 5kN Mode- Tension and Compression for the year 2029 , Capacity 1kN Mode - Tension and Compression for the year 2027 , Capacity 1kN Mode - Tension and Compression for the year 2028 , Capacity 1kN Mode - Tension and Compression for the year 2029 , Capacity 0.2kN Mode - Tension and Compression for the year 2027 , Capacity 0.2kN Mode - Tension and Compression for the year 2028 , Capacity 0.2kN Mode - Tension and Compression for the year 2029 , Capacity 100kN Mode - Tension and Compression for the year 2027 , Capacity 100kN Mode - Tension and Compression for the year 2028 , Capacity 100kN Mode - Tension and Compression for the year 2029

Advisory Bank

HDFC Bank

ePBG Percentage

5%

ePBG Duration (Months)

38

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

1095

Delivery Locations

1

Delivery Cities

Hyderabad

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-HyderabadHyderabad--21095-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9579931.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 33 Items Sign in for GEM prices

#1

Capacity 100kN Model-1195, Mode- Tension for the Year 2027

Load cell Calibration of Instron UTM

2 year Delivery: 1,095 days
#2

Capacity 100kN Model-1195, Mode- Tension for the Year 2028

Load cell Calibration of Instron UTM

2 year Delivery: 1,095 days
#3

Capacity 100kN Model-1195, Mode- Tension for the Year 2029

Load cell Calibration of Instron UTM

2 year Delivery: 1,095 days
#4

Capacity 200kN Model-4507 Mode - Tension for the Year 2027

Load cell Calibration of Instron UTM

1 year Delivery: 1,095 days
#5

Capacity 200kN Model-4507 Mode - Tension for the Year 2028

Load cell Calibration of Instron UTM

1 year Delivery: 1,095 days
#6

Capacity 200kN Model-4507 Mode - Tension for the Year 2029

Load cell Calibration of Instron UTM

1 year Delivery: 1,095 days
#7

Mode- Tension and Compression for the year 2027

Load cell Calibration of Instron UTM Capacity 250kN Model-1196

1 year Delivery: 1,095 days
#8

Mode- Tension and Compression for the year 2028

Load cell Calibration of Instron UTM Model-1196

1 year Delivery: 1,095 days
#9

Mode- Tension and Compression for the year 2029

Load cell Calibration of Instron UTM Model-1196

1 year Delivery: 1,095 days
#10

Capacity 100kN Mode-Tension and Compression for the year 2027

Load cell Calibration of BISS UTM

1 year Delivery: 1,095 days
#11

Capacity 100kN Mode-Tension and Compression for the year 2028

Load cell Calibration of BISS UTM

1 year Delivery: 1,095 days
#12

Capacity 100kN Mode-Tension and Compression for the year 2029

Load cell Calibration of BISS UTM

1 year Delivery: 1,095 days
#13

Capacity 100kN Mode- Tension and Compression for the year 2027

Load cell Calibration of Walter + Bai UTM

1 year Delivery: 1,095 days
#14

Capacity 100kN Mode- Tension and Compression for the year 2028

Load cell Calibration of Walter + Bai UTM

1 year Delivery: 1,095 days
#15

Capacity 100kN Mode- Tension and Compression for the year 2029

Load cell Calibration of Walter + Bai UTM

1 year Delivery: 1,095 days
#16

Capacity 300kN Mode- Tension and Compression for the year 2027

Load cell Calibration of Walter + Bai UTM

1 year Delivery: 1,095 days
#17

Capacity 300kN Mode- Tension and Compression for the year 2028

Load cell Calibration of Walter + Bai UTM

1 year Delivery: 1,095 days
#18

Capacity 300kN Mode- Tension and Compression for the year 2029

Load cell Calibration of Walter + Bai UTM

1 year Delivery: 1,095 days
#19

Capacity 5kN Mode- Tension and Compression for the year 2027

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#20

Capacity 5kN Mode- Tension and Compression for the year 2028

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#21

Capacity 5kN Mode- Tension and Compression for the year 2029

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#22

Capacity 1kN Mode - Tension and Compression for the year 2027

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#23

Capacity 1kN Mode - Tension and Compression for the year 2028

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#24

Capacity 1kN Mode - Tension and Compression for the year 2029

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#25

Capacity 0.2kN Mode - Tension and Compression for the year 2027

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#26

Capacity 0.2kN Mode - Tension and Compression for the year 2028

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#27

Capacity 0.2kN Mode - Tension and Compression for the year 2029

Load cell Calibration of DAK-T UTM

1 year Delivery: 1,095 days
#28

Capacity 100kN Mode - Tension and Compression for the year 2027

Load cell Calibration of Zwick 1 Model- KAPPA100SS-CF UTM

1 year Delivery: 1,095 days
#29

Capacity 100kN Mode - Tension and Compression for the year 2028

Load cell Calibration of Zwick 1 Model- KAPPA100SS-CF UTM

1 year Delivery: 1,095 days
#30

Capacity 100kN Mode - Tension and Compression for the year 2029

Load cell Calibration of Zwick 1 Model- KAPPA100SS-CF UTM

1 year Delivery: 1,095 days
#31

Capacity 100kN Mode - Tension and Compression for the year 2027

Load cell Calibration of Zwick 2 Model- KAPPA100SS-CF UTM

1 year Delivery: 1,095 days
#32

Capacity 100kN Mode - Tension and Compression for the year 2028

Load cell Calibration of Zwick 2 Model- KAPPA100SS-CF UTM

1 year Delivery: 1,095 days
#33

Capacity 100kN Mode - Tension and Compression for the year 2029

Load cell Calibration of Zwick 2 Model- KAPPA100SS-CF UTM

1 year Delivery: 1,095 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN card

2

GST registration certificate

3

ESI/EPF registrations

4

Audited financial statements for 2024-25, 2023-24, 2022-23

5

Solvency certificate from bank or CA certificate with seal

6

Experience certificates as per Annexure I

7

OEM authorization or manufacturer authorization

8

Unconditional acceptance of terms

9

Technical bid documents

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for tension and compression testing equipment tender in defence production?

Bidders must submit PAN, GST, ESI/EPF registrations, and audited financial statements for three years, plus solvency certificates if required. The technical bid should reflect capacity models (100kN, 200kN, 300kN), multi-mode operation, and OEM authorizations. Ensure unconditional acceptance of all terms and demonstrate independent financial capacity.

What documents are required for the Mishra Dhatu Nigam Limited tender in 2027?

Submit PAN, GST, ESI/EPF registrations, three-year audited financial statements, solvency certificate (Rs. 33,80 or bank certificate), Annexure I technical experience details, OEM authorization, and evidence of unconditional acceptance of terms. Include technical bid and commercial bid as separate envelopes.

What are the key eligibility criteria for defence testing equipment bids 2027–2029?

Eligibility requires PAN/GST/ESI/EPF registrations, positive net worth for three years or a solvency certificate from a bank, and demonstrated technical experience per Annexure I. Unconditional acceptance of all commercial terms is mandatory to qualify for the technical evaluation.

What delivery terms apply to the option quantity in this tender?

The purchaser may increase order quantity up to 50% and extend delivery time during currency, calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Delivery starts after the last date of the original order.

Which capacity models are referenced for the tension/compression equipment tender?

The tender references multiple models including 100kN Model-1195, 200kN Model-4507, 300kN, and smaller capacities (5kN, 1kN, 0.2kN) across 2027–2029, with tension, compression, and combined modes as applicable.

What is the expected documentation for financial solvency in the bid?

Provide either audited accounts for 2024-25, 2023-24, 2022-23; or a CA certificate showing three-year net worth; or a solvency certificate from a nationalized/scheduled bank; all must bear official seal and registration numbers.

Are OEM authorizations required for this defence equipment tender?

Yes, bidders should submit OEM authorization or manufacturer authorization demonstrating capability to supply tension/compression testing equipment and compliance with required standards; this strengthens credibility during technical evaluation.

What standards or certifications are expected for high-capacity testing machines?

While not explicitly stated, bidders should demonstrate ISI/ISO quality controls, OEM conformity, and robust defect-free performance across 100kN–300kN ranges; provide certificates and test reports matching defence procurement expectations.