175MM Iron Clamp 1000x80x8 MM,175MM P.V.C Top Cap,150 MM P.V.C End Cap,175x150 P.V.C Reducer,175MM
N/a
GHAZIABAD, UTTAR PRADESH
Bid Publish Date
31-Aug-2025, 12:32 pm
Bid End Date
22-Sep-2025, 1:00 pm
Value
₹6,87,000
Location
Progress
Quantity
651
Category
150 MM PVC END CAP
Bid Type
Two Packet Bid
N/a invites bids for 150 MM PVC END CAP, 150 MM PVC CENTRALIZER, 175 MM PVC TOP CAP, 175X150MM PVC RIDUCER, 175MM IRON CLAMP, 175 MM PVC CENTRALIZER, 200 MM PVC TOP CAP, 200X150MM PVC RIDUCER, 200 MM IRON CLAMP, 200 MM PVC CENTRALIZER in Firozabad, UTTAR PRADESH. Quantity: 651. Submission Deadline: 22-09-2025 13: 00: 00. Submit your proposal before the deadline.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
GHAZIABAD, UTTAR PRADESH
N/a
Firozabad, UTTAR PRADESH
N/a
AGRA, UTTAR PRADESH
N/a
AGRA, UTTAR PRADESH
N/a
SAHARANPUR, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 150 MM PVC END CAP | 150 MM PVC END CAP | 94 | pieces | ae-mi.ay | 90 |
| 2 | 150 MM PVC CENTRALIZER | 150 MM PVC CENTRALIZER | 97 | pieces | ae-mi.ay | 90 |
| 3 | 175 MM PVC TOP CAP | 175 MM PVC TOP CAP | 71 | pieces | ae-mi.ay | 90 |
| 4 | 175X150MM PVC RIDUCER | 175X150MM PVC RIDUCER | 68 | pieces | ae-mi.ay | 90 |
| 5 | 175MM IRON CLAMP | 175MM IRON CLAMP | 76 | pieces | ae-mi.ay | 90 |
| 6 | 175 MM PVC CENTRALIZER | 175 MM PVC CENTRALIZER | 160 | pieces | ae-mi.ay | 90 |
| 7 | 200 MM PVC TOP CAP | 200 MM PVC TOP CAP | 17 | pieces | ae-mi.ay | 90 |
| 8 | 200X150MM PVC RIDUCER | 200X150MM PVC RIDUCER | 17 | pieces | ae-mi.ay | 90 |
| 9 | 200 MM IRON CLAMP | 200 MM IRON CLAMP | 17 | pieces | ae-mi.ay | 90 |
| 10 | 200 MM PVC CENTRALIZER | 200 MM PVC CENTRALIZER | 34 | pieces | ae-mi.ay | 90 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
22-Sep-2025, 1:00 pm
Opening Date
22-Sep-2025, 1:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS