Supply, Install & Commissioning of 1000AH, 600AH & 300AH VRLA battery bank (48V) including Buyback
Railtel Corporation Of India Limited
WEST DELHI, DELHI
Progress
Quantity
3730
Category
Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) announces a tender for Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories, Dismantling of VLRA Power Plant including disconecting power cables with all accessories, Transportation of VLRA battery upto 900AH from BA Stores or any Loaction as per BSNL incharge loading unloading transportaion charges distance per km, Transportation of VLRA Power Plant from BA stores or any location as per BSNL site incharge loading unloading transportation distance per km, Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required, Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required, Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required, Additional charges to shift the VRLA Battery400AH TO 900AHset to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available, Dismantling of old VLRA battery set and Power Plant Battery capacity 200AH to 900AH and PP including disconnecting power cables along with all accessories, Dismantling of old VLRA battery set and PP battery capacity above 900AH and PP including disconnecting power cables along with all accessories, Transportation of Liio BBPP upto 900AH from BA stores or any location as per BSNL site in charge loading unloading transporation distance per km, Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available, Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available in KOLLAM, KERALA. Quantity: 3730. Submission Deadline: 11-10-2025 17: 00: 00. Last date to apply is approaching fast!
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Railtel Corporation Of India Limited
WEST DELHI, DELHI
Bharat Petroleum Corporation Ltd
Powergrid Energy Services Ltd
BHIND, MADHYA PRADESH
Power Grid Corporation Of India Limited
Power Grid Corporation Of India Limited
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories | Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories | 65 | nos | agmklm | 90 |
| 2 | Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories | Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories | 18 | nos | agmklm | 90 |
| 3 | Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories | Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories | 2 | nos | agmklm | 90 |
| 4 | Dismantling of VLRA Power Plant including disconecting power cables with all accessories | Dismantling of VLRA Power Plant including disconecting power cables with all accessories | 22 | nos | agmklm | 90 |
| 5 | Transportation of VLRA battery upto 900AH from BA Stores or any Loaction as per BSNL incharge loading unloading transportaion charges distance per km | Transportation of the VRLA Battery upto 900AH from BA store OR ANY LOCATION to location as per BSNL site IC shifting and Loading of the same BatteryPP set to a suitable vehicle unloading and shifting as per the requirement distance per km rate | 2,050 | km | agmklm | 90 |
| 6 | Transportation of VLRA Power Plant from BA stores or any location as per BSNL site incharge loading unloading transportation distance per km | Transportation of the VRLA Power Plant from BA store OR ANY LOCATION to location as per BSNL site IC shifting and Loading of the same BatteryPP set to a suitable vehicle unloading and shifting as per the requirement distance per km rate | 650 | km | agmklm | 90 |
| 7 | Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required | Installation of VRLA Battery400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required | 78 | nos | agmklm | 90 |
| 8 | Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | 18 | nos | agmklm | 90 |
| 9 | Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required | Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required | 2 | nos | agmklm | 90 |
| 10 | Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required | Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required | 27 | nos | agmklm | 90 |
| 11 | Additional charges to shift the VRLA Battery400AH TO 900AHset to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Battery400AH TO 900AHset to upper floor at siteIn the case of buildings where lift facility is not available | 33 | nos | agmklm | 90 |
| 12 | Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available | 12 | nos | agmklm | 90 |
| 13 | Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available | 16 | nos | agmklm | 90 |
| 14 | Dismantling of old VLRA battery set and Power Plant Battery capacity 200AH to 900AH and PP including disconnecting power cables along with all accessories | Dismantling of old VLRA battery set and Power Plant Battery capacity 200AH to 900AH and PP including disconnecting power cables along with all accessories | 7 | nos | agmklm | 90 |
| 15 | Dismantling of old VLRA battery set and PP battery capacity above 900AH and PP including disconnecting power cables along with all accessories | Dismantling of old VLRA battery set and PP battery capacity above 900AH and PP including disconnecting power cables along with all accessories | 2 | nos | agmklm | 90 |
| 16 | Transportation of Liio BBPP upto 900AH from BA stores or any location as per BSNL site in charge loading unloading transporation distance per km | Transportation of the Liion BBPP up to 900 AH and PP LiIon from BA store or any location to as per BSNL site IC shifting and Loading of the same BatteryPP set to a suitable vehicle unloading and shifting as per the requirement distance Per km rate | 620 | km | agmklm | 90 |
| 17 | Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | 74 | nos | agmklm | 90 |
| 18 | Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | 2 | nos | agmklm | 90 |
| 19 | Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | 30 | nos | agmklm | 90 |
| 20 | Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | 2 | nos | agmklm | 90 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
10-Oct-2025, 11:00 am
Opening Date
10-Oct-2025, 11:30 am
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC