TenderDekho Logo
Closed GEM

Procurement Opportunity: Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al in BARMER, RAJASTHAN

Bid Publish Date

06-Nov-2025, 1:24 pm

Bid End Date

17-Nov-2025, 2:00 pm

Progress

Issue06-Nov-2025, 1:24 pm
Technical14-11-2025 19:25:12
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

4625

Category

Labour for disconnecting existing HT LT supply from defective transformer disconnection complete all as directed by engr-in-charge

Bid Type

Two Packet Bid

Categories 104

A tender has been published for Indian Army Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al in BARMER, RAJASTHAN. Quantity: 4625 by. Submission Deadline: 17-11-2025 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8529343.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 31 Items Sign in for GEM prices

#1

Labour for disconnecting existing HT LT supply from defective transformer disconnection complete all as directed by engr-in-charge

Labour for disconnecting existing HT/LT supply from defective transformer, opening transformer cover, meggering of defectivfe transformer. All elect connection of the trolly mounted transofrmer at the site. After repair connection of reapaired transformer and disconnection of trolly mounted transformer

1 each job Delivery: 30 days
#2

Labour for crane for lifting transofrmer in the veh and transportation complete all as directed by engr-in-charge

Labour for crane for lifting transofrmer in the veh and transportation to the auth wksp and return back the same after repair

1 each job Delivery: 30 days
#3

S and F HV side windings with suitable size of copper conductor complete all as directed by engr-in-charge

S&F HV side windings with suitable size of copper conductor

190 kg Delivery: 30 days
#4

S and F LV side windings with suitable size of copper conductor complete all as directed by engr-in-charge

S&F LV side windings with suitable size of copper conductor

90 kg Delivery: 30 days
#5

Labour for oven charging for transformer windings complete all as directed by engr-in-charge

Labour for oven charging for transformer windings complete all as directed by engr-in-charge

1 each job Delivery: 30 days
#6

S and F new transformer oil, low viscosity of dielectric strength complete all as directed by engr-in-charge

S & F new transformer oil, low viscosity of dielectric strength not less than 50 KV in to the conservator tank/body tank of the transformer

275 ltr Delivery: 30 days
#7

S and F tape, paper insulating strings etc gently and carefully, washing of the dust, complete all as directed by engr-in-charge

S&F tape, paper insulating strings etc gently and carefully, washing of the dust, rust and idr from all parts including taking oiut HT/LT leg coil core tank and cooling tubes

1 each job Delivery: 30 days
#8

Painting of the inner and outer side of the transformer with zinc chromate complete all as directed by engr-in-charge

Painting of the inner and outer side of the transformer with zinc chromate paint and outer side by synthetic enameled paint over a coat of primer (grey colour)

1 each job Delivery: 30 days
#9

Supply and fix HT porecelain bushing complete with brass tinned complete all as directed by engr-in-charge

Supply and fix HT porecelain bushing complete with brass/tinned copper rod with nuts and gasket set complete

3 each Delivery: 30 days
#10

Supply and fix LT porecelain bushing complete with brass tinned copper rod complete all as directed by engr-in-charge

Supply and fix LT porecelain bushing complete with brass/tinned copper rod with nuts and gasket set complete

4 each Delivery: 30 days
#11

Supply and fix tap cahnger switch 11 KV complete with rod and gasket complete complete all as directed by engr-in-charge

Supply and fix tap cahnger switch 11 KV complete with rod and gasket complete

1 each Delivery: 30 days
#12

Supply and fix breather assy with new silica gel complete all as directed by engr-in-charge

Supply and fix breather assy with new silica gel

1 each Delivery: 30 days
#13

Testing of the transformer after repair as directed by Engr-in-Charge

Testing of the transformer after repair as directed by Engr-in-Charge

1 each job Delivery: 30 days
#14

Labour for shifting of trolly mounted transformer 315 KVA from AGE EM sub divn to the proposed site and same will be return back after completion of wk complete all as directed by engr-in-charge

Labour for shifting of trolly mounted transformer 315 KVA from AGE EM sub divn to the proposed site and same will be return back after completion of wk

1 each job Delivery: 30 days
#15

Labour for disconnecting existing HT supply from transformer and opening the complete all as directed by engr-in-charge

Labour for disconnecting existing HT supply from transformer and opening the transformer for changing the defective part and re-assemble the same after repair

9 each job Delivery: 30 days
#16

S and F Gaskets of suitable size sealing washers o rings and other consumbels such as tape, paper insulating strings etc all as reqd at site complete all as directed by engr-in-charge

S&F Gaskets of suitable size, sealing washers, o rings and other consumbels such as tape, paper insulating strings etc all as reqd at site

9 each job Delivery: 30 days
#17

Supply and fix new silica gel of blue colour complete all as directed by engr-in-charge

Supply and fix new silica gel of blue colour

8 kg Delivery: 30 days
#18

Dehydration filtaration of old transformer oil at site with protable complete all as directed by engr-in-charge

Dehydration/filtaration of old transformer oil at site with protable plant to improve the dielectric strength 45 to 60 KV

3,495 ltr Delivery: 30 days
#19

S and F new transformer oil, low viscosity of dielectric strength not less than 50 KVcomplete all as directed by engr-in-charge

S&F new transformer oil, low viscosity of dielectric strength not less than 50 KV into the conservator tank/body tank of the transformer

315 ltr Delivery: 30 days
#20

M and L for dismantling motors upto 2.20 KW capacity complete all as directed by engr-in-charge

M&L for dismantling motors upto 2.20 KW capacity, taking down and carry to workshop, complete all as directed by Engineer-in-Charge

3 each job Delivery: 30 days
#21

Material and labour for repairing servicing the 3 phase 415V electric induction motor complete all as directed by engr-in-charge

Material and labour for repairing servicing the 3 phase 415V electric induction motor by carefully disconnecting the connection cables and earthings

5 each job Delivery: 30 days
#22

M and L for testing of alignment of door tracks rails both sides by complete all as directed by engr-in-charge

M&L for testing of alignment of door tracks (rails) both sides by putting/adding additional material (filling) by gas cutting & welding the same and making them smooth by grinding for smooth functioning of door complete all as specified and directed.

2 each job Delivery: 30 days
#23

Taking down old unsv gears, pinion, warm gear etc and supply and fixing new gears, complete all as directed by engr-in-charge

Taking down old unsv gears, pinion, warm gear etc and supply and fixing new gears, pinion, warm gear, oil seals, packings etc including all other accessories, fixtures, nut bolts & washers as required for fixing gears, gear oil (Gear oil 320)

2 each job Delivery: 30 days
#24

S and F Iron cable carrier Rollers complete all as directed by engr-in-charge

S & F Iron cable carrier (Rollers)

55 each job Delivery: 30 days
#25

Supply in replacement of wheel bearing complete all as directed by engr-in-charge

Supply in replacement of wheel bearing

5 each Delivery: 30 days
#26

S and F in replacement of PVC sheathed multistranded flexible copper cable of 3 core 4.0 Sqmm 1100 volt grade complete all as directed by engr-in-charge

S & F in replacement of PVC sheathed multistranded flexible copper cable of 3 core 4.0 Sqmm 1100 volt grade

110 rm Delivery: 30 days
#27

Decarburizing cleaning complete control panel of by cleaning bus bar chamber complete all as directed by engr-in-charge

Decarburizing/cleaning complete control panel of by cleaning bus bar chamber iwht suitable chemical and ensure proper decarburizing, internal wiring and replacing the damged wires of existing size, refixing the same after applying suitable solution to the bus bar insulator & checking all the connections, tightening the nuts, bolts & thimbles of in-coming out-going system complete incl replacmenet of defective rusted bolts & nuts, repairing to door/shutter hinges and locking arrangements

2 each job Delivery: 30 days
#28

Supply in filling of gear oil SP 320 for top up upto to required level or in replacement of unserviceable oil complete all as directed by engr-in-charge

Supply in filling of gear oil SP 320 for top up upto to required level or in replacement of U/s oil

20 ltr Delivery: 30 days
#29

Supply in refilling of grease including cleaning of old grease complete all as directed by engr-in-charge

Supply in refilling of grease including cleaning of old grease

10 kg Delivery: 30 days
#30

S and F in replacement of single phase preventor as per existing make and model complete all as directed by engr-in-charge

S & F in replacement of single phase preventor as per existing make and model

2 each Delivery: 30 days
#31

S and F in replacment of power contactor of capacity 40 amp, 3 pole suitable complete all as directed by engr-in-charge

S&F in replacment of power contactor of capacity 40 amp, 3 pole suitable

2 each Delivery: 30 days

Technical Results

S.No Seller Item Date Status
1
GODARA CORPORATION   Under PMA
-14-11-2025 19:25:12
2
HI TECH SOLUTIONS   Under PMA
-14-11-2025 19:00:12
3
K K ENTERPRISES   Under PMA
-17-11-2025 06:39:53
4
SATI JASNATH ENTERPRISES   Under PMA
-14-11-2025 19:13:27

Financial Results

Rank Seller Price Item
L1
GODARA CORPORATION(MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al
L2
K K ENTERPRISES (MSE,MII)( MSE Social Category:SC )    Under PMA
Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al
L3
SATI JASNATH ENTERPRISES (MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al
L4
HI TECH SOLUTIONS (MII)   Under PMA
Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al