TenderDekho Logo
GEM

Procurement Opportunity: Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al in BARMER, RAJASTHAN

Bid Publish Date

06-Nov-2025, 1:24 pm

Bid End Date

17-Nov-2025, 2:00 pm

Progress

Issue06-Nov-2025, 1:24 pm
Technical14-11-2025 19:25:12
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

4625

Category

Labour for disconnecting existing HT LT supply from defective transformer disconnection complete all as directed by engr-in-charge

Bid Type

Two Packet Bid

Categories 104

A tender has been published for Indian Army Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al in BARMER, RAJASTHAN. Quantity: 4625 by. Submission Deadline: 17-11-2025 14: 00: 00. Check eligibility and apply.

Documents 4

GeM-Bidding-8529343.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 31 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Labour for disconnecting existing HT LT supply from defective transformer disconnection complete all as directed by engr-in-charge Labour for disconnecting existing HT/LT supply from defective transformer, opening transformer cover, meggering of defectivfe transformer. All elect connection of the trolly mounted transofrmer at the site. After repair connection of reapaired transformer and disconnection of trolly mounted transformer 1 each job offgbsoutarlai 30
2 Labour for crane for lifting transofrmer in the veh and transportation complete all as directed by engr-in-charge Labour for crane for lifting transofrmer in the veh and transportation to the auth wksp and return back the same after repair 1 each job offgbsoutarlai 30
3 S and F HV side windings with suitable size of copper conductor complete all as directed by engr-in-charge S&F HV side windings with suitable size of copper conductor 190 kg offgbsoutarlai 30
4 S and F LV side windings with suitable size of copper conductor complete all as directed by engr-in-charge S&F LV side windings with suitable size of copper conductor 90 kg offgbsoutarlai 30
5 Labour for oven charging for transformer windings complete all as directed by engr-in-charge Labour for oven charging for transformer windings complete all as directed by engr-in-charge 1 each job offgbsoutarlai 30
6 S and F new transformer oil, low viscosity of dielectric strength complete all as directed by engr-in-charge S & F new transformer oil, low viscosity of dielectric strength not less than 50 KV in to the conservator tank/body tank of the transformer 275 ltr offgbsoutarlai 30
7 S and F tape, paper insulating strings etc gently and carefully, washing of the dust, complete all as directed by engr-in-charge S&F tape, paper insulating strings etc gently and carefully, washing of the dust, rust and idr from all parts including taking oiut HT/LT leg coil core tank and cooling tubes 1 each job offgbsoutarlai 30
8 Painting of the inner and outer side of the transformer with zinc chromate complete all as directed by engr-in-charge Painting of the inner and outer side of the transformer with zinc chromate paint and outer side by synthetic enameled paint over a coat of primer (grey colour) 1 each job offgbsoutarlai 30
9 Supply and fix HT porecelain bushing complete with brass tinned complete all as directed by engr-in-charge Supply and fix HT porecelain bushing complete with brass/tinned copper rod with nuts and gasket set complete 3 each offgbsoutarlai 30
10 Supply and fix LT porecelain bushing complete with brass tinned copper rod complete all as directed by engr-in-charge Supply and fix LT porecelain bushing complete with brass/tinned copper rod with nuts and gasket set complete 4 each offgbsoutarlai 30
11 Supply and fix tap cahnger switch 11 KV complete with rod and gasket complete complete all as directed by engr-in-charge Supply and fix tap cahnger switch 11 KV complete with rod and gasket complete 1 each offgbsoutarlai 30
12 Supply and fix breather assy with new silica gel complete all as directed by engr-in-charge Supply and fix breather assy with new silica gel 1 each offgbsoutarlai 30
13 Testing of the transformer after repair as directed by Engr-in-Charge Testing of the transformer after repair as directed by Engr-in-Charge 1 each job offgbsoutarlai 30
14 Labour for shifting of trolly mounted transformer 315 KVA from AGE EM sub divn to the proposed site and same will be return back after completion of wk complete all as directed by engr-in-charge Labour for shifting of trolly mounted transformer 315 KVA from AGE EM sub divn to the proposed site and same will be return back after completion of wk 1 each job offgbsoutarlai 30
15 Labour for disconnecting existing HT supply from transformer and opening the complete all as directed by engr-in-charge Labour for disconnecting existing HT supply from transformer and opening the transformer for changing the defective part and re-assemble the same after repair 9 each job offgbsoutarlai 30
16 S and F Gaskets of suitable size sealing washers o rings and other consumbels such as tape, paper insulating strings etc all as reqd at site complete all as directed by engr-in-charge S&F Gaskets of suitable size, sealing washers, o rings and other consumbels such as tape, paper insulating strings etc all as reqd at site 9 each job offgbsoutarlai 30
17 Supply and fix new silica gel of blue colour complete all as directed by engr-in-charge Supply and fix new silica gel of blue colour 8 kg offgbsoutarlai 30
18 Dehydration filtaration of old transformer oil at site with protable complete all as directed by engr-in-charge Dehydration/filtaration of old transformer oil at site with protable plant to improve the dielectric strength 45 to 60 KV 3,495 ltr offgbsoutarlai 30
19 S and F new transformer oil, low viscosity of dielectric strength not less than 50 KVcomplete all as directed by engr-in-charge S&F new transformer oil, low viscosity of dielectric strength not less than 50 KV into the conservator tank/body tank of the transformer 315 ltr offgbsoutarlai 30
20 M and L for dismantling motors upto 2.20 KW capacity complete all as directed by engr-in-charge M&L for dismantling motors upto 2.20 KW capacity, taking down and carry to workshop, complete all as directed by Engineer-in-Charge 3 each job offgbsoutarlai 30
21 Material and labour for repairing servicing the 3 phase 415V electric induction motor complete all as directed by engr-in-charge Material and labour for repairing servicing the 3 phase 415V electric induction motor by carefully disconnecting the connection cables and earthings 5 each job offgbsoutarlai 30
22 M and L for testing of alignment of door tracks rails both sides by complete all as directed by engr-in-charge M&L for testing of alignment of door tracks (rails) both sides by putting/adding additional material (filling) by gas cutting & welding the same and making them smooth by grinding for smooth functioning of door complete all as specified and directed. 2 each job offgbsoutarlai 30
23 Taking down old unsv gears, pinion, warm gear etc and supply and fixing new gears, complete all as directed by engr-in-charge Taking down old unsv gears, pinion, warm gear etc and supply and fixing new gears, pinion, warm gear, oil seals, packings etc including all other accessories, fixtures, nut bolts & washers as required for fixing gears, gear oil (Gear oil 320) 2 each job offgbsoutarlai 30
24 S and F Iron cable carrier Rollers complete all as directed by engr-in-charge S & F Iron cable carrier (Rollers) 55 each job offgbsoutarlai 30
25 Supply in replacement of wheel bearing complete all as directed by engr-in-charge Supply in replacement of wheel bearing 5 each offgbsoutarlai 30
26 S and F in replacement of PVC sheathed multistranded flexible copper cable of 3 core 4.0 Sqmm 1100 volt grade complete all as directed by engr-in-charge S & F in replacement of PVC sheathed multistranded flexible copper cable of 3 core 4.0 Sqmm 1100 volt grade 110 rm offgbsoutarlai 30
27 Decarburizing cleaning complete control panel of by cleaning bus bar chamber complete all as directed by engr-in-charge Decarburizing/cleaning complete control panel of by cleaning bus bar chamber iwht suitable chemical and ensure proper decarburizing, internal wiring and replacing the damged wires of existing size, refixing the same after applying suitable solution to the bus bar insulator & checking all the connections, tightening the nuts, bolts & thimbles of in-coming out-going system complete incl replacmenet of defective rusted bolts & nuts, repairing to door/shutter hinges and locking arrangements 2 each job offgbsoutarlai 30
28 Supply in filling of gear oil SP 320 for top up upto to required level or in replacement of unserviceable oil complete all as directed by engr-in-charge Supply in filling of gear oil SP 320 for top up upto to required level or in replacement of U/s oil 20 ltr offgbsoutarlai 30
29 Supply in refilling of grease including cleaning of old grease complete all as directed by engr-in-charge Supply in refilling of grease including cleaning of old grease 10 kg offgbsoutarlai 30
30 S and F in replacement of single phase preventor as per existing make and model complete all as directed by engr-in-charge S & F in replacement of single phase preventor as per existing make and model 2 each offgbsoutarlai 30
31 S and F in replacment of power contactor of capacity 40 amp, 3 pole suitable complete all as directed by engr-in-charge S&F in replacment of power contactor of capacity 40 amp, 3 pole suitable 2 each offgbsoutarlai 30

Technical Results

S.No Seller Item Date Status
1GODARA CORPORATION   Under PMA-14-11-2025 19:25:12Qualified
2HI TECH SOLUTIONS   Under PMA-14-11-2025 19:00:12Qualified
3K K ENTERPRISES   Under PMA-17-11-2025 06:39:53Qualified
4SATI JASNATH ENTERPRISES   Under PMA-14-11-2025 19:13:27Qualified

Financial Results

Rank Seller Price Item
L1GODARA CORPORATION(MSE,MII)( MSE Social Category:OBC )    Under PMA₹10,31,470Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al
L2K K ENTERPRISES (MSE,MII)( MSE Social Category:SC )    Under PMA₹10,91,620Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al
L3SATI JASNATH ENTERPRISES (MSE,MII)( MSE Social Category:OBC )    Under PMA₹11,40,300Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al
L4HI TECH SOLUTIONS (MII)   Under PMA₹11,86,700Item Categories : Labour for disconnecting existing HT LT supply from defective transformer disconnection complete al