Progress
The Indian Army invites bids for the supply, installation, testing and commissioning of 200 L capacity rotational moulded three-layer polyethylene water storage tanks (cylindrical vertical, closed top) in the Borarupak region of Arunachal Pradesh, within a 250 KM radius. The procurement covers tanks under a unified scope with training for operators and complete supply, including statutory clearances if any. The project emphasizes OEM/authorized reseller installation and includes a training period for four personnel over six days. The estimated scope relies on multiple tanks (A, B, C variants) described in the category, with a base EMD of ₹69,900. Location-based delivery to Military Station Borarupak is mandatory, and the contract allows variations up to 50% in quantity during delivery.
Product: 200 L rotational moulded three-layer polyethylene water storage tank
Form: Cylindrical vertical with closed top
Volume: 200 liters per tank
Location: Borarupak Military Station, Upper Subansiri, Arunachal Pradesh
Quantity flexibility: up to 50% variation at contract award and during currency
Training: 4 personnel, 6 days, within 250 KM radius
EMD of ₹69,900 and GST/PAN/EFT documents required
OEM/authorized installation and commissioning responsibility clearly defined
Delivery within extended period with formula-based time extension and minimum 30 days
Vendor turnover demonstrated via audited statements for last 3 years
Training and statutory clearances included in scope where applicable
Payment terms align with delivery, installation, and commissioning milestones; EMD ₹69,900 required with bid
Delivery period can be extended proportionally if option clause is exercised; minimum 30 days for extended delivery
Penalties and LD terms may apply for delayed installation; exact rates not specified in data provided
OEM or OEM-authorized reseller with capability to install and commission PE water tanks
Last 3 years average annual turnover as per bid document (documented evidence)
Compliance with GSTIN, PAN, and EFT mandates; bank-certified EFT mandate
Quantity
66
Category
Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
17
OEM Avg. Turnover
8
Past Performance
80 %
Warranty Period
15 days
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Provn of WSS , Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top , A Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top , B Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top , C Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
12
Pre-Bid Date
21-10-2026 11:00:00
Pre-Bid Venue
58 Engineer Regiment Military Station Lkabali
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Dhemaji
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Dhemaji | Dhemaji | - | - | 1 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
29-Oct-2026, 4:30 am
Opening Date
30-Oct-2026, 4:30 am
Provn of WSS
Provn of WSS.Tech Specification att as per Appx A and Store list att as per Annx I.
Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top
Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON
A Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top
Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON
B Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top
Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON
C Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top
Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Provn of WSS | Provn of WSS.Tech Specification att as per Appx A and Store list att as per Annx I. | 1 | job | prateekkale.58@ | 60 | |
| 2 | Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top | Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON | 20 | nos | prateekkale.58@ | 60 | |
| 3 | A Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top | Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON | 15 | nos | prateekkale.58@ | 60 | |
| 4 | B Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top | Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON | 15 | nos | prateekkale.58@ | 60 | |
| 5 | C Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top | Water tank 200 ltrs capacity rotational moulded three layer polyethylene water storage tank Cylindrical vertical with closed top as per IS 12701 dash 1989 comma first grade superior quality as per approved sample incl all fitting accessaries for making it fully functional having PVC Float Valve with complete set comma ISI Marked.Make colon SINTEX slash VECTUS slash PLUTON | 15 | nos | prateekkale.58@ | 60 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Audited Balance Sheet or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization or OEM-certified reseller documentation
Technical compliance certificates (if any) and installation capability statement
Experience certificates for similar water storage tank supply projects
Key insights about ASSAM tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and turnover proof for last 3 years (audited or CA certificate). OEM authorization is required for installation and commissioning; include training plan and deployment capability for 4 personnel over 6 days.
EMD of ₹69,900 must be submitted with the bid through an eligible instrument (DD/online payment). Ensure consistency with bidder profile and provide proof of payment in the bid submission package along with GSTIN and PAN documents.
Installation must be executed by OEM or OEM-certified resource or authorized reseller. It includes testing, commissioning, and training for 4 operators, spread over 6 days, within 250 KM of Borarupak Military Station.
Deliverables must reach Military Station Borarupak, Upper Subansiri, Arunachal Pradesh within a 250 KM radius. Delivery terms may vary if the option clause is exercised, with a minimum 30 days extension cap.
Training is mandated for 4 employees, duration 6 days, at a location within 250 KM of Borarupak. Training scope includes operation and basic maintenance, with OEM-led delivery and certification of completion.
Bid involves supply, installation, testing, commissioning of the 200 L PE tanks, plus operator training and any necessary statutory clearances. Documentation must confirm all listed inclusions and exclude non-essential accessories unless explicitly stated.