SHAFT WITH KEYS and SLEEVE NUTS, 4 STAGE,IMPELLER, LG-2,SET OF TWO GLAND, BRASS,SET OF TWO BEARING
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Bid Publish Date
27-Feb-2026, 11:27 pm
Bid End Date
20-Mar-2026, 9:00 am
Location
Progress
Quantity
34
Category
INTER STAGE BUSH
Bid Type
Two Packet Bid
Eastern Coalfields Limited, under Coal India Limited, invites bids for an assortment of electrical and mechanical components including VCB shunt trip coil, pump shaft (4 stage), plug and socket, shaft sleeve D.S. bronze, oil ring for bearing DE 100 x 125 MLA 368, balancing rings/discs bronze LT BR, enclosed impeller, inter stage bush, main contactor 550, 300A, and potential transformer. The procurement location is BARDHAMAN, WEST BENGAL – 713101. The tender references a multi-item 11-line BoQ with unspecified quantities, and an option clause permitting up to 25% quantity variation at contracted rates. No start/end dates or estimated value are published. A Data Sheet upload and vendor-code creation are mandatory, with post-receipt inspection by AREA ENGINEER (E&M). Proven-ness criteria require prior supply against CI L orders in the last five years.
VCB shunt trip coil
Pump shaft 4 stage
Plug and socket
Shaft sleeve bronze (D.S. bronze)
Oil ring for bearing DE 100 x 125 MLA 368
Balancing ring bronze
Balancing disc LT BR
Enclosed impeller
Inter stage bush
Main contactor 550, 300A
Potential transformer
Quantity variation up to 25% of bid quantity with contract price protections
Delivery period linked to last delivery date; extended period formula with minimum 30 days
Data Sheet alignment mandatory; post-receipt inspection by AREA ENGINEER (E&M)
Proven-ness criteria require recent orders (last five years) with self-certified copies of past supply orders and proof of supply; data sheet alignment mandatory
Extended delivery time formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not explicitly stated in available data; to be defined in ATC/corrigendum; ensure alignment with contract
Demonstrated proven-ness with supply of similar items to CIL or subsidiaries in last 5 years
Valid PAN and GSTIN; ability to submit EFT mandate and cancelled cheque
Data Sheet accuracy with bid; no mismatches between offered product and technical parameters
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Western Coalfields Limited
CHANDRAPUR, MAHARASHTRA
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Western Coalfields Limited
YAVATMAL, MAHARASHTRA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | VCB SHUNT TRIP COIL | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 2 | PUMP SHAFT 4 STAGE | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 |
| 3 | PLUG AND SOCKET | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 |
| 4 | SHAFT SLEEVE D.S. BRONZE | As Per Technical Specification Sheet | 3 | pieces | [email protected] | 15 |
| 5 | OIL RING FOR BEARING DE 100 X 125 MLA 368 | As Per Technical Specification Sheet | 6 | pieces | [email protected] | 15 |
| 6 | BALANCING RING, BRONZE | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 |
| 7 | BALANCING DISC LT BR | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 |
| 8 | ENCLOSED IMPELLER | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 9 | INTER STAGE BUSH | As Per Technical Specification Sheet | 4 | pieces | [email protected] | 15 |
| 10 | CONTACTOR MAIN,550, 300A | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 |
| 11 | POTENTIAL TRANSFORMER | As Per Technical Specification Sheet | 3 | pieces | [email protected] | 15 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered products (uploaded with bid)
Past supply orders and proofs of supply for proven-ness (last 5 years) to CIL subsidiaries or equivalent organizations
OEM authorizations (if applicable)
Technical bid documents and any certificates requested in ATC/Corrigendum
Key insights about WEST BENGAL tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, and EFT mandate; upload a Data Sheet matching offered products; provide proven-ness proof from last five years; ensure post-receipt inspection readiness; comply with the 25% quantity variation clause and document vendor-code creation.
Submit PAN, GSTIN, cancelled cheque, EFT Mandate, Data Sheet for offered items, and any OEM authorizations if applicable. Include proof of past supply orders and performance proof to CI L or subsidiaries within the last five years as part of proven-ness criteria.
The tender covers VCB shunt trip coil; pump shaft with four stages; plug and socket assemblies; bronze shaft sleeve; oil ring for bearing DE 100 x 125 MLA 368; bronze balancing rings/discs LT BR; enclosed impeller; inter-stage bush; 550/300A main contactor; and a potential transformer; data sheet alignment is mandatory.
If quantity increases up to 25%, the extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; the purchaser may extend to the original delivery period while exercising the option.
Yes, post-receipt inspection will be conducted by AREA ENGINEER (E&M) at the consignee site. Pre-dispatch inspection is Not Applicable unless specifically selected in ATC; bidders should align with post-delivery verification.
Proven-ness requires self-certified past supply orders for the tendered items within the last five years to CI L/subsidiaries or listed PSUs and proof of supply against those orders; include self-certified copies of orders and performance proofs with the bid.
The tender specifies product-specific items; ensure data sheet alignment and provide any applicable OEM authorizations; while explicit IS/ISO standards are not detailed in the data, verify compliance with item-specific manufacturer specifications and CD data sheets.
The option clause allows up to 25% quantity variation at contracted rates; pricing remains fixed for the original quantity, while delivery timelines extend per the calculated formula; confirm final quantities before contract finalization.
Eastern Coalfields Limited
📍 BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
📍 BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
📍 BARDHAMAN, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS