TenderDekho Logo
Active GEM

East Central Railway Bed Mattress IS 13489 (V3) Q2 Tender CHANDAULI Uttar Pradesh 2026

Bid Publish Date

10-Sep-2026, 7:06 pm

Bid End Date

21-Sep-2026, 8:00 pm

Progress

Issue10-Sep-2026, 7:06 pm
AwardPending

Key Highlights

  • IS 13489 (V3) conformity as the core technical standard for bed mattresses
  • Quantity variation rights up to 25% during and after contract award
  • GST-compliant invoicing to consignee name with consignee GSTIN
  • Pre-dispatch inspection by RITES if ATC requires; post-receipt inspection by consignee

Tender Overview

East Central Railway invites bids for Bed Mattress conforming to IS 13489 (V3) (Q2), to be procured for the CHANDAULI, Uttar Pradesh area. The tender references a flexible quantity clause allowing up to 25% quantity increase/decrease at contracted rates, with delivery terms pegged to the original delivery period and potential extensions. Bidders must ensure invoice is raised in the consignee name with GSTIN of the consignee. Pre-dispatch inspection may be conducted at seller premises by RITES, and post-receipt inspection at the consignee site by the designated authority. Notably, there is no BOQ item published, signaling a potentially framework or selective procurement. The tender signals IM/ OEM considerations for imported items and after-sales service obligations within India. The emphasis on IS 13489 (V3) marks technical compliance as a core criterion, with procedural controls through inspection agencies. This opportunity targets suppliers capable of ISO 13489 (V3) category mattresses and related after-sales support in the railway supply chain.

Technical Specifications & Requirements

  • Product category: Bed mattress conforming to IS 13489 (V3) (Q2)
  • Quantity/Value: Not disclosed; BOQ items show 0 total items, suggesting a non-traditional or forthcoming listing
  • Standards/Compliance: IS 13489 (V3) certification emphasis; no explicit IS 13489 parts or test methods published
  • Inspection: Pre-dispatch inspection by RITES or post-receipt inspection by the consignee; invoices to be GST compliant
  • Delivery/Logistics: Clause for quantity variation up to 25% with delivery timeline linked to the original order; minimum extension logic outlined
  • OEM/Support: Provisions for imported products with Indian-based after-sales support requirement; certificate to this effect must be submitted
  • Location: CHANDAULI, Uttar Pradesh 221009; procurement for East Central Railway

Terms, Conditions & Eligibility

  • Delivery terms: Option clause enables +/- 25% quantity; delivery period calculations tied to original delivery period with minimum 30 days extension rule
  • Invoice terms: Invoices issued in consignee name with their GSTIN only
  • Inspection: Pre-dispatch (if ATC criteria selected) by a nominated agency (RITES); post-receipt by consignee
  • OEM/after-sales: For imported gear, registered Indian office required for service support; submit certificate
  • BOQ: No items listed; bidders should anticipate a potential amendment or framework scope
  • Eligibility: No explicit years of experience or turnover stated; respondents should align to standard Indian Railways supplier prerequisites and certification needs

Key Specifications

  • Product/service names: Bed mattress conforming to IS 13489 (V3)

  • Quantities/values: Not disclosed; potential 25% variation allowed

  • EMD/estimated value: Not specified in BOQ; bidders should prepare as per railway norms

  • Experience: Must align with railway mattress supply and IS 13489 compliance

  • Quality/standards: IS 13489 (V3); post/pre-inspection as per ATC and consignee requirements

Terms & Conditions

  • Quantity variation up to 25% with adjusted delivery timelines

  • GSTIN-based invoicing to consignee; consignor must honor consignee details

  • Inspection regime: pre-dispatch by RITES when applicable; post-receipt at consignee site

Important Clauses

Payment Terms

Invoices must be raised in consignee name with consignee GSTIN; no further payment terms published

Delivery Schedule

Delivery period starts from the last date of original delivery order; option quantity extension minimum 30 days

Penalties/Liquidated Damages

Not specified in provided data; follow standard railway LD terms for delay

Bidder Eligibility

  • Experience in supplying railway-grade mattresses or IS 13489 compliant products

  • GST registration and financial stability demonstrated by last 2-3 years statements

  • Compliance with Indian Railways supplier prerequisites and OEM/service support obligations

Tender Data

Bid Details

Quantity

128

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

Yes

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Bed Mattress Conforming to IS 13489 (V3) (Q2)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Chandauli

Delivery Pincodes

232101

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mahabir Singh Yadav232101,Office of SSE/Sig/1, East Central Railway, Pt Deen Dayal Upadhyay DivisionChandauliUttar Pradesh23210112830-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9878642.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Indian Railways

Office Name

Ecr Stores

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate of bidder

2

Permanent Account Number (PAN) card

3

Experience certificates for similar mattress supply projects

4

Financial statements (last 2-3 years) demonstrating financial stability

5

EMD documentation as applicable (not disclosed in tender data)

6

Technical bid/documentation demonstrating IS 13489 (V3) compliance

7

OEM authorization for imported products and Indian after-sales service certificate

8

Any eligibility certifications required by East Central Railway

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for IS 13489 mattress tender in Chandauli UP 2026

Bidders should prepare IS 13489 (V3) compliant bed mattresses, submit GSTIN-based invoices, and provide OEM authorizations for imported items. Ensure pre/post-inspection readiness with RITES/Consignee and anticipate a 25% quantity variation. Include financials, experience certificates, and supplier registrations as required by East Central Railway terms.

What documents are required for East Central Railway mattress procurement

Submit GST certificate, PAN, experience certificates for mattress supply, last 2-3 years financial statements, OEM authorization for imported items, and technical compliance documents proving IS 13489 (V3) conformity; indemnities and supplier registrations may also be requested.

What are the delivery terms for 25% quantity variation

The contract allows up to 25% change in quantity at contracted rates; if exercised, delivery time extends using the formula (additional/original) × original period, with a minimum of 30 days extension unless already exceeding the original period.

Which inspection agencies may conduct mattress inspections

Pre-dispatch inspection may be done by RITES if ATC criteria are met; post-receipt inspection will be at the consignee site by the designated authority, ensuring conformance before acceptance.

What standards must IS 13489 mattress suppliers meet for this tender

Suppliers must demonstrate IS 13489 (V3) conformity; ensure the quality and safety requirements as per IS standards, with guidance likely to come from East Central Railway and the inspecting agencies during pre/post checks.

What is the invoicing requirement for this mattress tender

Invoices must be raised in the consignee’s name with the consignee’s GSTIN only, to ensure proper tax handling and payment processing per railway procurement norms.

Are there any BOQ items published for this mattress tender

No BOQ items are listed in the current data; bidders should expect a framework or later amendments; prepare adaptable pricing and demonstrate compliance with IS 13489 (V3) to align with potential future quantities.

What is the typical inspection process for railway mattress supplies

The process includes potential pre-dispatch inspection by a nominated agency (RITES) and post-receipt inspection by the consignee; ensure material conformity to IS 13489 (V3) and readiness for both inspection stages.