Bid Publish Date
10-Sep-2026, 7:06 pm
Bid End Date
21-Sep-2026, 8:00 pm
Location
Progress
East Central Railway invites bids for Bed Mattress conforming to IS 13489 (V3) (Q2), to be procured for the CHANDAULI, Uttar Pradesh area. The tender references a flexible quantity clause allowing up to 25% quantity increase/decrease at contracted rates, with delivery terms pegged to the original delivery period and potential extensions. Bidders must ensure invoice is raised in the consignee name with GSTIN of the consignee. Pre-dispatch inspection may be conducted at seller premises by RITES, and post-receipt inspection at the consignee site by the designated authority. Notably, there is no BOQ item published, signaling a potentially framework or selective procurement. The tender signals IM/ OEM considerations for imported items and after-sales service obligations within India. The emphasis on IS 13489 (V3) marks technical compliance as a core criterion, with procedural controls through inspection agencies. This opportunity targets suppliers capable of ISO 13489 (V3) category mattresses and related after-sales support in the railway supply chain.
Product/service names: Bed mattress conforming to IS 13489 (V3)
Quantities/values: Not disclosed; potential 25% variation allowed
EMD/estimated value: Not specified in BOQ; bidders should prepare as per railway norms
Experience: Must align with railway mattress supply and IS 13489 compliance
Quality/standards: IS 13489 (V3); post/pre-inspection as per ATC and consignee requirements
Quantity variation up to 25% with adjusted delivery timelines
GSTIN-based invoicing to consignee; consignor must honor consignee details
Inspection regime: pre-dispatch by RITES when applicable; post-receipt at consignee site
Invoices must be raised in consignee name with consignee GSTIN; no further payment terms published
Delivery period starts from the last date of original delivery order; option quantity extension minimum 30 days
Not specified in provided data; follow standard railway LD terms for delay
Experience in supplying railway-grade mattresses or IS 13489 compliant products
GST registration and financial stability demonstrated by last 2-3 years statements
Compliance with Indian Railways supplier prerequisites and OEM/service support obligations
Quantity
128
Bid Type
Single Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Bed Mattress Conforming to IS 13489 (V3) (Q2)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Chandauli
Delivery Pincodes
232101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mahabir Singh Yadav | 232101,Office of SSE/Sig/1, East Central Railway, Pt Deen Dayal Upadhyay Division | Chandauli | Uttar Pradesh | 232101 | 128 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate of bidder
Permanent Account Number (PAN) card
Experience certificates for similar mattress supply projects
Financial statements (last 2-3 years) demonstrating financial stability
EMD documentation as applicable (not disclosed in tender data)
Technical bid/documentation demonstrating IS 13489 (V3) compliance
OEM authorization for imported products and Indian after-sales service certificate
Any eligibility certifications required by East Central Railway
Key insights about UTTAR PRADESH tender market
Bidders should prepare IS 13489 (V3) compliant bed mattresses, submit GSTIN-based invoices, and provide OEM authorizations for imported items. Ensure pre/post-inspection readiness with RITES/Consignee and anticipate a 25% quantity variation. Include financials, experience certificates, and supplier registrations as required by East Central Railway terms.
Submit GST certificate, PAN, experience certificates for mattress supply, last 2-3 years financial statements, OEM authorization for imported items, and technical compliance documents proving IS 13489 (V3) conformity; indemnities and supplier registrations may also be requested.
The contract allows up to 25% change in quantity at contracted rates; if exercised, delivery time extends using the formula (additional/original) × original period, with a minimum of 30 days extension unless already exceeding the original period.
Pre-dispatch inspection may be done by RITES if ATC criteria are met; post-receipt inspection will be at the consignee site by the designated authority, ensuring conformance before acceptance.
Suppliers must demonstrate IS 13489 (V3) conformity; ensure the quality and safety requirements as per IS standards, with guidance likely to come from East Central Railway and the inspecting agencies during pre/post checks.
Invoices must be raised in the consignee’s name with the consignee’s GSTIN only, to ensure proper tax handling and payment processing per railway procurement norms.
No BOQ items are listed in the current data; bidders should expect a framework or later amendments; prepare adaptable pricing and demonstrate compliance with IS 13489 (V3) to align with potential future quantities.
The process includes potential pre-dispatch inspection by a nominated agency (RITES) and post-receipt inspection by the consignee; ensure material conformity to IS 13489 (V3) and readiness for both inspection stages.