TenderDekho Logo
GEM

Open Tender for Transformer Oil Testing,Transformer Oil Filtration,Battery Capacity Test,PD Testing of HT Cable,Tan

Bid Publish Date

23-Nov-2024, 6:22 pm

Bid End Date

03-Dec-2024, 7:00 pm

Progress

Issue23-Nov-2024, 6:22 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1881

Category

Relay Testing

Bid Type

Two Packet Bid

Categories 87

Hindustan Petroleum Corporation Ltd announces a tender for Transformer Oil Testing, Transformer Oil Filtration, Battery Capacity Test, PD Testing of HT Cable, Tan Delta Testing HT Cable, IR PI Testing of HT Cable, VLF Testing of HT Cables, Relay Coordination Study, Arc Flash Study, Relay Testing, 33 KV CT Testing, 33 KV PT Testing, OTI Testing, WTI Testing, Buchollz Relay testing, Diaphragm Vent Checking, Operation of PRV, Tan Delta Testing Transformer, ACB Maintenance, ACB Electrical Testing, VCB Maintenance, VCB Testing, Electrical Safety Audit, SFRA Testing of Transformer, DFRA Testing of Transformer, Ammeter Voltmeter Calibration, IR PI WR of LT Motors, Energy Meter Calibration, IR PI Of LT Cables, Insulation Mat Testing, Lightening Arrestor 3rd Harmonic Testing, Capacitance testing of Capacitor Bank, Calibration of Clamp Meter Earth Tester, Lux Meter Calibration, Numerical Relay Testing, Thermography of all Electrical panels, Other Transformer tests. Quantity: 1881. Submission Deadline: 03-12-2024 19: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Transformer Oil Testing , Transformer Oil Filtration , Battery Capacity Test , PD Testing of HT Cable , Tan Delta Testing HT Cable , IR PI Testing of HT Cable , VLF Testing of HT Cables , Relay Coordination Study , Arc Flash Study , Relay Testing , 33 KV CT Testing , 33 KV PT Testing , OTI Testing , WTI Testing , Buchollz Relay testing , Diaphragm Vent Checking , Operation of PRV , Tan Delta Testing Transformer , ACB Maintenance , ACB Electrical Testing , VCB Maintenance , VCB Testing , Electrical Safety Audit , SFRA Testing of Transformer , DFRA Testing of Transformer , Ammeter Voltmeter Calibration , IR PI WR of LT Motors , Energy Meter Calibration , IR PI Of LT Cables , Insulation Mat Testing , Lightening Arrestor 3rd Harmonic Testing , Capacitance testing of Capacitor Bank , Calibration of Clamp Meter Earth Tester , Lux Meter Calibration , Numerical Relay Testing , Thermography of all Electrical panels , Other Transformer tests

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7171691.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Hindustan Petroleum Corporation Ltd LT/HT Testing & Calibration Tender Jhajjar Haryana 2026

Hindustan Petroleum Corporation Ltd

JHAJJAR, HARYANA

Posted: 13 April 2026
Closed: 27 April 2026
GEM

TRANSFORMER OIL TESTING,TRANSFORMER OIL FILTRATION,TESTG OF EARTH PIT RESISTANCE,LUX LEVEL MONITORI

Hindustan Petroleum Corporation Ltd

GANDHI NAGAR, GUJARAT

Posted: 19 August 2025
Closed: 30 August 2025
GEM

ACB TESTING CALIBRATION SERVICE,AMMETER VOLTMETER METER CALIBRATION AND TESTING,THERMAL RELAY TESTI

Hindustan Petroleum Corporation Ltd

GORAKHPUR, UTTAR PRADESH

Posted: 1 December 2025
Closed: 16 December 2025
GEM

Hindustan Petroleum Corporation Ltd Transformer & Electrical Equipment Testing Tender India 2026 IS-550 Optional Clauses

Hindustan Petroleum Corporation Ltd

PATNA, BIHAR

Posted: 7 February 2026
Closed: 17 February 2026
GEM

Testing of Relay,Thermography of Panels,Testing of Insulation Mat,Load Testing of Battery bank,Tran

Hindustan Petroleum Corporation Ltd

DHARWARD, KARNATAKA

Posted: 8 February 2025
Closed: 25 February 2025
GEM

Bill of Quantities (BOQ) 37 Items Sign in for GEM prices

#1

Transformer Oil Testing

As per CEA 2023, OISD regulations

4 pieces Delivery: 730 days
#2

Transformer Oil Filtration

As per CEA 2023, OISD regulations

4 pieces Delivery: 730 days
#3

Battery Capacity Test

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#4

PD Testing of HT Cable

As per CEA 2023, OISD regulations

4 pieces Delivery: 730 days
#5

Tan Delta Testing HT Cable

As per CEA 2023, OISD regulations

4 pieces Delivery: 730 days
#6

IR PI Testing of HT Cable

As per CEA 2023, OISD regulations

4 pieces Delivery: 730 days
#7

VLF Testing of HT Cables

As per CEA 2023, OISD regulations

4 pieces Delivery: 730 days
#8

Relay Coordination Study

As per CEA 2023, OISD regulations

1 pieces Delivery: 730 days
#9

Arc Flash Study

As per CEA 2023, OISD regulations

1 pieces Delivery: 730 days
#10

Relay Testing

As per CEA 2023, OISD regulations

600 pieces Delivery: 730 days
#11

33 KV CT Testing

As per CEA 2023, OISD regulations

6 pieces Delivery: 730 days
#12

33 KV PT Testing

As per CEA 2023, OISD regulations

6 pieces Delivery: 730 days
#13

OTI Testing

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#14

WTI Testing

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#15

Buchollz Relay testing

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#16

Diaphragm Vent Checking

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#17

Operation of PRV

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#18

Tan Delta Testing Transformer

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#19

ACB Maintenance

As per CEA 2023, OISD regulations

10 pieces Delivery: 730 days
#20

ACB Electrical Testing

As per CEA 2023, OISD regulations

10 pieces Delivery: 730 days
#21

VCB Maintenance

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#22

VCB Testing

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#23

Electrical Safety Audit

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#24

SFRA Testing of Transformer

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#25

DFRA Testing of Transformer

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#26

Ammeter Voltmeter Calibration

As per CEA 2023, OISD regulations

20 pieces Delivery: 730 days
#27

IR PI WR of LT Motors

As per CEA 2023, OISD regulations

300 pieces Delivery: 730 days
#28

Energy Meter Calibration

As per CEA 2023, OISD regulations

10 pieces Delivery: 730 days
#29

IR PI Of LT Cables

As per CEA 2023, OISD regulations

800 pieces Delivery: 730 days
#30

Insulation Mat Testing

As per CEA 2023, OISD regulations

40 pieces Delivery: 730 days
#31

Lightening Arrestor 3rd Harmonic Testing

As per CEA 2023, OISD regulations

1 pieces Delivery: 730 days
#32

Capacitance testing of Capacitor Bank

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#33

Calibration of Clamp Meter Earth Tester

As per CEA 2023, OISD regulations

8 pieces Delivery: 730 days
#34

Lux Meter Calibration

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days
#35

Numerical Relay Testing

As per CEA 2023, OISD regulations

10 pieces Delivery: 730 days
#36

Thermography of all Electrical panels

As per CEA 2023, OISD regulations

4 pieces Delivery: 730 days
#37

Other Transformer tests

As per CEA 2023, OISD regulations

2 pieces Delivery: 730 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

What are the eligibility requirements for this tender?

The eligibility requirements for participating in the tender include being a registered entity with a minimum average annual turnover of 4 Lakhs, as well as having a minimum of 3 years of relevant experience in similar service provision.

What certificates are needed to qualify for the tender?

Bidders must submit various certificates such as proof of turnover, experience documentation, and any additional qualifications outlined in the BoQ specifications and ATC document linked to the tender.

How do I register to participate in the tender?

To register for the tender, bidders must complete their registration on the designated procurement platform, ensuring all necessary credentials and documentation aligning with tender requirements are provided.

What document formats are accepted for submission?

Accepted document formats for submission typically include PDF, Excel, and Word formats as specified in the tender documentation, promoting consistency and ease of evaluation.

What are the technical specifications required for the testing services?

The technical specifications include various testing protocols such as Transformer Oil Testing, Battery Capacity Test, PD Testing of HT Cable, and other specialized assessments as laid out in the scope of work.

What quality standards must be complied with during testing?

Bidders are expected to adhere to established quality standards for electrical equipment testing, ensuring compliance with national and international testing criteria as outlined in the tender specifications.

What are the compliance requirements for bidders?

Compliance requirements include adherence to safety standards, submission of necessary certifications, and ensuring that all aspects of the proposal meet the conditions set forth in the tender documents.

Is there an Earnest Money Deposit (EMD) required for this tender?

Yes, For this tender, an Earnest Money Deposit (EMD) will be required as part of the financial commitment from bidders to ensure serious participation.

What are the performance security requirements post-award?

The successful bidder will be required to provide a performance security amount as specified in the tender guidelines to safeguard against any shortcomings in contract execution.

What are the payment terms established for service delivery?

Payment terms are usually outlined in the tender documents, specifying the timelines for payment following the completion of services and submission of invoices based on the agreed delivery milestones.

How will price evaluation be conducted?

The price evaluation will be based on a total value-wise analysis of bids, factoring in both technical competency and financial quotes, ensuring a balanced approach to selecting the right bidder.

How do I submit my tender documents?

Documents for the tender should be submitted electronically through the designated online platform prior to the stipulated deadline as specified in the tender document.

What are the key timelines and deadlines to consider?

Bidders need to remain aware of key timelines and submission deadlines detailed within the tender information provided under the main document linked above.

How will the evaluation and selection process be conducted?

The evaluation and selection process will be carried out through a structured review of bids, focusing on both technical qualifications and financial viability, ultimately ensuring adherence to the best practices and standards laid out for tendering.

When and how will results be communicated to bidders?

The notification of results will be communicated through the official procurement platform, where all participating bidders can receive updates pertaining to the outcome of their submissions.

What benefits are available for Micro, Small, and Medium Enterprises (MSEs)?

MSEs can access specific benefits regarding financial concessions, relaxed eligibility criteria, and support aimed at enhancing competitive bidding in line with market inclusivity.

What if I am a startup? Are there provisions available?

Startups can take advantage of special provisions tailored to facilitate their participation, allowing for easier entry into government procurement processes and access to support mechanisms outlined in the tender documents.

How does this tender align with 'Make in India' policies?

This tender aligns with 'Make in India' policies by encouraging local content procurement and supporting domestic service providers, subsequently promoting the growth of indigenous capacities in the electrical testing sector.


With this structured approach, prospective bidders are well-informed about the requirements and can prepare compelling proposals that meet the tender specifications.

Similar Tenders

5 found
Urgent

TRANSFORMER OIL TESTING TEST,TRANSFORMER OIL FILTRATION 1270 Ltrsper Year,TRANSFORMER TESTING- RESI

Hindustan Petroleum Corporation Ltd

📍 SANGRUR, PUNJAB

EMD: ₹57,820
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Thermography of Pannel,Testing and Calibration WTI andOTI of Transformer,Tan Delta VCB Dissovled Ga

Bharat Petroleum Corporation Ltd

📍 GULBARGA, KARNATAKA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

PRESSURE GUAGES CALIBRATI,VACCUM GUAGES CALIBRATION,COMPOUND GUAGES CALIBRATI,TEMP GUAGE CALIBRATIO

Hindustan Petroleum Corporation Ltd

📍 VISAKHAPATNAM, ANDHRA PRADESH

EMD: ₹60,000
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

THERMOGRAPHY,TRANSFROMER,TRANSFROMER,TRANSFROMER,RELAY,TRANSFROMER,ENERGY,IR TEST,MAT TEST,DGA,TEN

Bharat Petroleum Corporation Ltd

📍 PATIALA, PUNJAB

⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

CALIBRATION OF SYSTEM POWER SUPPLY,CALIBRATION OF THRULINE WATTMETER,CALIBRATION OF GAUGE METER,CAL

Indian Air Force

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM