Bid Publish Date
07-Jan-2026, 3:30 pm
Bid End Date
14-Feb-2026, 12:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Armoured Vehicles Nigam Limited invites bids for the fabrication, supply and installation of an activated carbon vessel for the PSA system of MPF No. 3529 (nitrogen plant). The project requires matching the existing vessel dimensions and orientation, with a stated working pressure of 6 bar. A mandatory pre-bid site visit must occur within 10 days of bid release, and firms must dismantle the existing vessel, fabricate a new unit, and install it at MPF 3529 within 45 working days. A hydro test at 8 bar is required, followed by a hydro test certificate from an authorized body. A 1-year warranty is demanded on replaced spares, and vendors must adhere to MPF safety SOP. The supplier must provide all consumables and tools themselves and ensure zero air leakage post-installation.
Activated carbon vessel fabrication for PSA system MPF No. 3529
Working pressure: 6 bar; no changes to flange/welded connections
Hydro test at 8 bar with certificate from state/central government body
Pre-coat with anti-rust paint and two coats enamel finish
Dismantle old vessel, install new vessel per MPF 3529 placement
Ensure zero air leakage at all welded, threaded, and flange connections
Supply all consumables (gaskets, sealants, hardware) and tools
One-year warranty on replaced spares; standard Make consumables
Safety compliance per MPF SOP; pre-bid site inspection required
Pre-bid site inspection within 10 days of bid release
Work to be completed within 45 working days from start
Hydro test at 8 bar with authorized certification
No alteration to existing flange/end connections
1-year warranty on installed vessel and spares
Vendors must supply their own consumables/tools
No explicit payment terms published; bidders should seek clarification during pre-bid or finalize terms per contract
Fabrication and installation must complete within 45 working days from work start date
Not specified in available data; ensure proposed terms align with MPF project SOP and any governing procurement policies
Experience in fabricating and installing activated carbon vessels for PSA or similar gas separation systems
Demonstrated ability to provide pre-bid site inspection and schematic drawings
Compliance with MPF safety SOP and possession of valid authorization from state/central bodies for hydro testing
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - FABRICATION SUPPLY AND INSTALLATION OF ACTIVATED CARBON VESSEL FOR NITROGEN PLANT OF SEALED QUENCH FURNACE MPF NO 3529 AS PER SCOPE OF WORK ANNEXURE A
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
SCOPE_OF_WORK
OTHER
OTHER
PAYMENT
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates for similar activated carbon vessel projects
Financial statements (audited or equivalent)
EMD documentation (exact format not specified in data)
Technical bid documents demonstrating compliance with scope
OEM authorization / dealership certificates (if applicable)
Pre-fabrication schematic drawing and safety compliance documents
Hydro test certificates from authorized bodies (upon completion)
Extended Deadline
14-Feb-2026, 12:00 pm
Opening Date
14-Feb-2026, 12:30 pm
Extended Deadline
07-Feb-2026, 12:00 pm
Opening Date
07-Feb-2026, 12:30 pm
Extended Deadline
31-Jan-2026, 4:00 pm
Opening Date
31-Jan-2026, 4:30 pm
Extended Deadline
24-Jan-2026, 4:00 pm
Opening Date
24-Jan-2026, 4:30 pm
| S.No | Seller | Date | Status |
|---|---|---|---|
| 1 | Nitrotech Engineers Under PMA | 07-02-2026 10:26:48 | |
| 2 | UNITED ENTERPRISES Under PMA | 17-01-2026 13:55:12 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Nitrotech Engineers Under PMA | Item Categories : Custom Bid for Services - FABRICATION SUPPLY AND INSTALLATION OF ACTIVATED CARBON VESSEL FOR NITROG | |
| L2 | UNITED ENTERPRISES( MSE Social Category:General ) Under PMA | Item Categories : Custom Bid for Services - FABRICATION SUPPLY AND INSTALLATION OF ACTIVATED CARBON VESSEL FOR NITROG |
Key insights about MAHARASHTRA tender market
Bidders should complete a pre-bid site inspection within 10 days of bid publication, submit GST, PAN, experience certificates, financials, OEM authorizations, and technical bid documents, and ensure compliance with MPF SOP. Confirm vessel dimensions and flange orientation from Scope of Work Annexure A.
Required documents include GST certificate, PAN card, prior experience certificates for similar projects, audited financial statements, EMD documentation, OEM authorization, technical bid, and hydro test certificates from authorized bodies after completion of hydro testing.
Specifications include dismantling the existing vessel, fabricating a new vessel identical in dimensions and flange connections, 6 bar working pressure, 8 bar hydro test, anti-rust coating plus two coats enamel, and 1-year warranty on replaced spares.
The contractor must complete fabrication and installation within 45 working days from the start date, with pre-bid inspections completed prior and hydro test certified by authorized agency.
Contractors must follow MPF Safety SOPs, ensure no air leakage at welds and flanges, provide necessary PPE, and coordinate safety with MPF facilities during dismantling and installation activities.
A standard 1-year warranty applies to the installed activated carbon vessel and replaced spares, with vendor-provided consumables and tools; this excludes any delays caused by external logistics.
Hydro test must be conducted at 8 bar and accompanied by a certificate issued by an authorized State or Central Government body, validating compliance before final acceptance.
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
OTHER
OTHER
PAYMENT
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS