Bid Publish Date
14-Sep-2026, 5:06 pm
Bid End Date
30-Sep-2026, 5:00 pm
EMD
₹1,00,000
Location
Progress
This tender, issued by the Science and Technology Department Bihar for Muzaffarpur, Bihar, seeks civil engineering and food processing lab equipment. The estimated value is not disclosed and the EMD is ₹100,000. No BOQ items are listed, and the tender notes a 25% quantity variation during contract execution. The delivery terms hinge on the original delivery schedule with potential extensions. This procurement emphasizes flexible quantity management and ATC-linked terms, with the purchase aimed at upgrading lab infrastructure in Muzaffarpur.
EMD: ₹100,000
Category: CIVIL ENGINEERING AND FOOD PROCESSING LAB EQUIPMENT
Quantity variation: up to 25% during contract
Delivery period: calculated from last date of original delivery order
Minimum additional delivery time: 30 days
BOQ items: 0 (not specified)
Purchaser may increase/decrease quantity up to 25% at contracted rates; extended time calculated with minimum 30 days, based on (Increased quantity ÷ Original quantity) × Original delivery period.
Delivery period commences from the last date of original delivery order; extensions permitted per option clause terms; ensure compliance with ATC for delivery obligations.
Bidder must review and comply with Buyer Uploaded ATC terms; non-compliance may render bid non-responsive.
Experience certificates showing relevant work in civil engineering or lab equipment
Valid GST registration and PAN card
Financial stability evidenced by last 2-3 years’ statements
Compliance with ATC terms and submission of OEM authorizations if required
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
275
OEM Avg. Turnover
220
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CIVIL ENGINEERING AND FOOD PROCESSING LAB EQUIPMENT
Advisory Bank
State Bank of India
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Muzaffarpur
Delivery Pincodes
842005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vibha Kumari | 842005,PHASE-2,BELA INDUSTRIAL AREA MUZAFFARPUR | Muzaffarpur | Bihar | 842005 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration document
Permanent Account Number (PAN) card
Experience certificates (relevant to civil engineering and lab equipment)
Financial statements (last 2-3 years)
EMD payment receipt or proof
Technical bid documents
OEM authorizations (if applicable)
Key insights about BIHAR tender market
Bidders must submit the EMD of ₹100,000 along with GST, PAN, experience certificates, and financial statements. Review the uploaded ATC for specific delivery terms and quantity variation up to 25%. Ensure technical bids align with the scope of civil engineering and food processing lab equipment in Bihar.
Required documents include GST registration, PAN card, experience certificates in similar projects, financial statements for the last 2-3 years, EMD proof, technical bid, and OEM authorizations if applicable. Ensure each document is valid and scannable for online submission.
The EMD is ₹100,000. Submit a valid payment method proof (DD/online transfer) as part of the bid; failure to provide EMD could render the bid non-responsive per ATC terms.
Quantity may be increased or decreased up to 25% of bid/contract quantity at contracted rates. Delivery time adjustments start from the last date of the original delivery order, with minimum 30 days extension if required by the option clause.
The ATC document is mandatory; bidders must review it for any additional terms, clauses, and suppliers’ obligations beyond general tender terms, including delivery, payment terms, and potential penalties. Compliance with ATC is essential for bid validity.
Delivery begins from the last date of the original delivery order; if the option clause is exercised, the extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a 30-day minimum.