TenderDekho Logo
Active GEM

Procurement Opportunity: GI Chain Link Mesh 50mm x 50mm x 4mm bracket 4350Sqm bracket close,MS Angle Posts 75x75x7mm bracket in PANCHKULA, HARYANA

Bid Publish Date

18-Aug-2026, 7:17 pm

Bid End Date

08-Sep-2026, 3:00 pm

EMD

₹4,50,000

Location

PANCHKULA , HARYANA

Progress

Issue18-Aug-2026, 7:17 pm
AwardPending

Indian Army announces a tender for GI Chain Link Mesh 50mm x 50mm x 4mm bracket 4350Sqm bracket close, MS Angle Posts 75x75x7mm bracket 3 point 75m long bracket close, MS Y Arms 2 point 5 ft long, Staining Posts and Bracing Sets, GI Tension Wire 4mm Dia, Concertina Coil 900m Dia Heavy Duty, Binding Wire comma Clamps comma Nuts and Bolts, Red Oxide Primer and Enamel Paint, Excavation of Post Foundation, PCC 1 colon 3 colon 6 Foundation Concrete, Back filling and Compaction, Fabrication of Posts and Y Arms, Erection of Posts, Fixing of Chain Link Mesh, Installation of Concertina Coil, Painting and Finishing, Testing and Commissioning, Transportation of Material to Site, Loading and Unloading, Storage and Handling in PANCHKULA, HARYANA. Quantity: 54486. Submission Deadline: 08-09-2026 15: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

54486

Category

GI Chain Link Mesh 50mm x 50mm x 4mm bracket 4350Sqm bracket close

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

30 %

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

GI Chain Link Mesh 50mm x 50mm x 4mm bracket 4350Sqm bracket close , MS Angle Posts 75x75x7mm bracket 3 point 75m long bracket close , MS Y Arms 2 point 5 ft long , Staining Posts and Bracing Sets , GI Tension Wire 4mm Dia , Concertina Coil 900m Dia Heavy Duty , Binding Wire comma Clamps comma Nuts and Bolts , Red Oxide Primer and Enamel Paint , Excavation of Post Foundation , PCC 1 colon 3 colon 6 Foundation Concrete , Back filling and Compaction , Fabrication of Posts and Y Arms , Erection of Posts , Fixing of Chain Link Mesh , Installation of Concertina Coil , Painting and Finishing , Testing and Commissioning , Transportation of Material to Site , Loading and Unloading , Storage and Handling

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Pre-Bid & Qualification

Pre-Bid Date

28-08-2026 14:00:00

Pre-Bid Venue

Chandimandir Mil Station Near Chandi Mata Mandir Railway Phatak Gate Haryana, Panchkua PIN-134107

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Panchkula

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PanchkulaPanchkula--4682390-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9540514.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

GI Chain Link Mesh 50mm x 50mm x 4mm bracket 4350Sqm bracket close

GI Chain Link Mesh 50mm x 50mm x 4mm bracket 4350Sqm bracket close

46,823 sqft Delivery: 90 days
#2

MS Angle Posts 75x75x7mm bracket 3 point 75m long bracket close

MS Angle Posts 75x75x7mm bracket 3 point 75m long bracket close

500 nos Delivery: 90 days
#3

MS Y Arms 2 point 5 ft long

MS Y Arms 2 point 5 ft long

500 nos Delivery: 90 days
#4

Staining Posts and Bracing Sets

Staining Posts and Bracing Sets

60 set Delivery: 90 days
#5

GI Tension Wire 4mm Dia

GI Tension Wire 4mm Dia

4,500 mtr Delivery: 90 days
#6

Concertina Coil 900m Dia Heavy Duty

Concertina Coil 900m Dia Heavy Duty

1,500 mtr Delivery: 90 days
#7

Binding Wire comma Clamps comma Nuts and Bolts

Binding Wire comma Clamps comma Nuts and Bolts

1 job Delivery: 90 days
#8

Red Oxide Primer and Enamel Paint

Red Oxide Primer and Enamel Paint

1 job Delivery: 90 days
#9

Excavation of Post Foundation

Excavation of Post Foundation

500 nos Delivery: 90 days
#10

PCC 1 colon 3 colon 6 Foundation Concrete

PCC 1 colon 3 colon 6 Foundation Concrete

91 cum Delivery: 90 days
#11

Back filling and Compaction

Back filling and Compaction

1 job Delivery: 90 days
#12

Fabrication of Posts and Y Arms

Fabrication of Posts and Y Arms

1 job Delivery: 90 days
#13

Erection of Posts

Erection of Posts

1 job Delivery: 90 days
#14

Fixing of Chain Link Mesh

Fixing of Chain Link Mesh

1 job Delivery: 90 days
#15

Installation of Concertina Coil

Installation of Concertina Coil

1 job Delivery: 90 days
#16

Painting and Finishing

Painting and Finishing

1 job Delivery: 90 days
#17

Testing and Commissioning

Testing and Commissioning

1 job Delivery: 90 days
#18

Transportation of Material to Site

Transportation of Material to Site

1 job Delivery: 90 days
#19

Loading and Unloading

Loading and Unloading

1 job Delivery: 90 days
#20

Storage and Handling

Storage and Handling

1 job Delivery: 90 days

Categories 58

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer