Procurement Opportunity: Supply of PLCC CARRIER EQUIPMENTS,Supply of PROTECTION COUPLER ALONG WITH PLCC PANEL,Supply of HF C

Bid Publish Date

21-Sep-2026, 3:10 pm

Bid End Date

19-Oct-2026, 11:00 am

EMD

₹2,64,000

Generate Docs

Progress

Issue21-Sep-2026, 3:10 pm
Corrigendum12-Oct-2026
AwardPending

Public procurement opportunity for Power Grid Corporation Of India Limited Supply of PLCC CARRIER EQUIPMENTS, Supply of PROTECTION COUPLER ALONG WITH PLCC PANEL, Supply of HF Cable from PLCC Panel to Coupling device, Supply of COUPLING DEVICE, Dismantling of the existing PLCC-Carrier Equipment and protection coupler, Installation and Commissioning of New PLCC-CARRIER EQUIPMENTS, Installation and Commissioning of New PLCC-PROTECTION COUPLER, Installation and Commissioning of Coupling Device, HF Cable laying, installation and commissioning, Installation and Commissioning of New PLCC -PROTECTION COUPLER. Quantity: 1456 issued by. Submission Deadline: 19-10-2026 11: 00: 00. View full details and respond.

Advertisement

Tender Data

Bid Details

Quantity

1456

Category

Supply of PLCC CARRIER EQUIPMENTS

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of PLCC CARRIER EQUIPMENTS , Supply of PROTECTION COUPLER ALONG WITH PLCC PANEL , Supply of HF Cable from PLCC Panel to Coupling device , Supply of COUPLING DEVICE , Dismantling of the existing PLCC-Carrier Equipment and protection coupler , Installation and Commissioning of New PLCC-CARRIER EQUIPMENTS , Installation and Commissioning of New PLCC-PROTECTION COUPLER , Installation and Commissioning of Coupling Device , HF Cable laying, installation and commissioning , Installation and Commissioning of New PLCC -PROTECTION COUPLER

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

20

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

30-09-2026 11:00:00

Pre-Bid Venue

Online

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Raigarh

Delivery Pincodes

496111

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Narsingh Kumar Raj496111,Powergrid corporation of India Ltd, Near Tamnar, Village:Bhendra, Raigarh Road,Gharghoda, (Opp. Gharghoda Bypass Point), Dist. Raigarh, Chhattisgarh-496111 "RaigarhChhattisgarh4961112180-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9864276.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Corporate Office Gurgaon

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

12-Oct-2026

Extended Deadline

19-Oct-2026, 5:30 am

Opening Date

20-Oct-2026, 5:30 am

Advertisement

Bill of Quantities (BOQ) 28 Items Sign in for GEM prices

#1

Supply of PLCC CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#2

Supply of PROTECTION COUPLER ALONG WITH PLCC PANEL

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#3

Supply of HF Cable from PLCC Panel to Coupling device

For 2 No of PLCC Channels in 2 different circuits

400 meter Delivery: 180 days
#4

Supply of COUPLING DEVICE

For 2 No of PLCC Channels in 2 different circuits

4 set Delivery: 180 days
#5

Supply of PLCC CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#6

Supply of PROTECTION COUPLER ALONG WITH PLCC PANEL

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#7

Supply of PLCC CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#8

Supply of PROTECTION COUPLER ALONG WITH PLCC PANEL

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#9

Supply of HF Cable from PLCC Panel to Coupling device

For 2 No of PLCC Channels in 2 different circuits

300 meter Delivery: 180 days
#10

Supply of COUPLING DEVICE

For 2 No of PLCC Channels in 2 different circuits

4 set Delivery: 180 days
#11

Supply of PLCC CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#12

Supply of PROTECTION COUPLER ALONG WITH PLCC PANEL

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#13

Dismantling of the existing PLCC-Carrier Equipment and protection coupler

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#14

Installation and Commissioning of New PLCC-CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#15

Installation and Commissioning of New PLCC-PROTECTION COUPLER

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#16

Installation and Commissioning of Coupling Device

For 2 No of PLCC Channels in 2 different circuits

4 ea Delivery: 180 days
#17

HF Cable laying, installation and commissioning

For 2 No of PLCC Channels in 2 different circuits

400 meter Delivery: 180 days
#18

Dismantling of the existing PLCC-Carrier Equipment and protection coupler

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#19

Installation and Commissioning of New PLCC-CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#20

Installation and Commissioning of New PLCC-PROTECTION COUPLER

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#21

Dismantling of the existing PLCC-Carrier Equipment and protection coupler

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#22

Installation and Commissioning of New PLCC-CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#23

Installation and Commissioning of New PLCC-PROTECTION COUPLER

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#24

Installation and Commissioning of Coupling Device

For 2 No of PLCC Channels in 2 different circuits

4 ea Delivery: 180 days
#25

HF Cable laying, installation and commissioning

For 2 No of PLCC Channels in 2 different circuits

300 meter Delivery: 180 days
#26

Dismantling of the existing PLCC-Carrier Equipment and protection coupler

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#27

Installation and Commissioning of New PLCC-CARRIER EQUIPMENTS

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days
#28

Installation and Commissioning of New PLCC -PROTECTION COUPLER

For 2 No of PLCC Channels in 2 different circuits

2 ea Delivery: 180 days

Categories 19

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer