The Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for conversion fabrication work related to weigh bridge systems, load cell mounting, load cells, digitizers, digital junction boxes for 4 and 6 load cells, batteries and spring washers. Location: Bulandshahr, Uttar Pradesh. The cumulative scope covers multiple items within a single procurement, with an estimated contract quantity subject to a 25% increase/decrease at award and during the contract. An ATC document has been uploaded and must be reviewed for bidder obligations. This opportunity targets suppliers capable of integrated metal fabrication, electrical mounting, and assembly of load cell networks.
Weigh-bridge related conversion fabrication
Load cell mounting and integration with digitizer
Digital junction box for 4 load cells
Digital junction box for 6 load cells
Battery pack and spring washers
Standards/brands to be confirmed via ATC document
8 BOQ items in total; exact quantities require official tender file
Quantity variation up to 25% during contract with contractual rates
Delivery period adjusted by formula based on increased quantity
Minimum delivery extension of 30 days if applicable
ATC document governs bidder obligations and terms
No explicit EMD/payment terms in data; confirm in ATC
Payment terms await confirmation in ATC; bidders must review ATC for payment schedules and milestones.
Delivery period adjusts with quantity changes using (increased quantity/original quantity) × original delivery period; minimum 30 days threshold.
LD provisions and penalties to be specified in ATC; bidders should verify in official documents.
Experience in fabrication and electrical integration for weigh-scale systems
Financial capacity evidenced by audited statements
Compliance with ATC terms and access to OEM authorizations if required
Quantity
90
Category
Conversion Fabrication Work for out Centre Weigh bridge
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
10 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Conversion Fabrication Work for out Centre Weigh bridge , Load Cell Mounting , Load Cell , Digitizer , Digital Junction Box for 4 Load cell , Digital Junction Box for 6 load cell , Battery , Spring Washer
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Pin Code
Delivery Pincodes
202390
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vageesh Tripathi | 202390,The Kisan Sahakari chini mill Anoopshar(U.P) Pin Code -275304 GST - 09AACAT2068G1ZF Contact no -9120296573 | Pin Code | - | 202390 | 3 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Conversion Fabrication Work for out Centre Weigh bridge
Conversion/ Fabrication Work for out Centre Weigh bridge (Convert one Load Cell to 4 Load Cell based).
Load Cell Mounting
Load Cell Mounting Assembly Trix Make..
Load Cell
Load Cell Capacity 5 Ton single Ended Shear Beam Type Load Master Make.
Digitizer
Digitizer with RS 232 option
Digital Junction Box for 4 Load cell
Digital Junction Box for 4 Load Cells Trix Make.
Digital Junction Box for 6 load cell
Digital Junction Box for 6 Load Cells Trix Make.
Battery
Battery Li-Ion 7.2v, 2.6Ah.
Spring Washer
L N Bolt 5/8 INCH x 3 INCH Unbreako Taparia Make with Spring Washer
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Conversion Fabrication Work for out Centre Weigh bridge | Conversion/ Fabrication Work for out Centre Weigh bridge (Convert one Load Cell to 4 Load Cell based). | 3 | nos | ivageesh | 10 | |
| 2 | Load Cell Mounting | Load Cell Mounting Assembly Trix Make.. | 13 | nos | ivageesh | 10 | |
| 3 | Load Cell | Load Cell Capacity 5 Ton single Ended Shear Beam Type Load Master Make. | 8 | nos | ivageesh | 10 | |
| 4 | Digitizer | Digitizer with RS 232 option | 2 | nos | ivageesh | 10 | |
| 5 | Digital Junction Box for 4 Load cell | Digital Junction Box for 4 Load Cells Trix Make. | 3 | nos | ivageesh | 10 | |
| 6 | Digital Junction Box for 6 load cell | Digital Junction Box for 6 Load Cells Trix Make. | 1 | nos | ivageesh | 10 | |
| 7 | Battery | Battery Li-Ion 7.2v, 2.6Ah. | 25 | nos | ivageesh | 10 | |
| 8 | Spring Washer | L N Bolt 5/8 INCH x 3 INCH Unbreako Taparia Make with Spring Washer | 35 | nos | ivageesh | 10 |
GST registration
PAN card
Experience certificates for similar weigh-bridge fabrication projects
Financial statements demonstrating capability to undertake fabrication-integration work
EMD/Security deposit as per ATC (not disclosed here)
Technical bid documents as per ATC requirements
OEM authorizations if load cells or digitizers are brand-specific
Any specific quality/compliance certificates referenced in ATC
Key insights about UTTAR PRADESH tender market
Bidders must review the ATC uploaded by the buyer, submit GST, PAN, experience certificates, and financials, and comply with the 25% quantity variation clause. Ensure OEM authorizations if using branded load cells and digitizers, and provide technical bid documents as per ATC guidelines.
Required documents include GST registration, PAN card, experience certificates for similar projects, audited financial statements, EMD submission as per ATC, technical bid forms, and OEM authorizations for third-party components. Ensure compliance with ATC terms for submission.
Delivery time adjusts using (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum extension of 30 days. This is subject to awarded contract quantities and the option clause under the buyer terms.
The ATC defines bidder obligations, qualification criteria, and submission formats. It governs conformity, warranty expectations, and any special clauses beyond the base tender information. Access and comply with all ATC instructions for bid viability.
Components include weigh-bridge conversion fabrication, load cell mounting, load cells, digitizer, digital junction boxes for 4 and 6 load cells, batteries, and spring washers. Exact item quantities require the official BOQ from the tender file.
Quantities are listed in the BOQ, which currently shows 8 items with N/A quantities in the provided data. Access the official tender documents/ATC for precise item-wise quantities and specifications before bid submission.
Standards and certifications are to be confirmed in the ATC; bidders should anticipate OEM authorization needs and device-level compliance requirements. Ensure any ISI/ISO-like conformity is addressed as per the official tender documents.
The exact submission deadline is specified in the ATC and official tender documents. Bidders should review the ATC to confirm last-date submission, required bid formats, and any pre-bid meeting dates.