Progress
Traffic cone with rubber base; heavy base cone
Bottom diameter: 410 mm
Color: Orange cone, White reflective tape
Top cap present; Ring hook provision for interlinking rope
Rope connector at top; UV resistant; semi-flexible; non-fading
Reflective tape included; UV resistant
Certification: ISO 9001:2015
OEM experience: Minimum 5 years
Warranty: 1 year
Demonstration before technical committee
EMD via e-BG with UID NCOGD2383P; NeSL, as per bid terms
Quantity variation up to 25%; delivery extension minimum 30 days
ISO 9001:2015 certified supplier; 5+ years OEM experience
Turnover requirement: ₹5 Lakh average in last 3 years
Make in India provisions apply; Make/foreign bidder eligibility
1-year warranty; demonstration required
EMD to be provided via e-BG with UID NCOGD2383P; payment terms to align with OGFR-2023/GFR; no specific advance mentioned in data
Delivery period to commence from the last date of original delivery order; extended time calculated by formula with minimum 30 days; up to 25% quantity variation allowed
Bidders subject to OGFR/GFR penalties for non-compliance; potential debarment for violations
Average turnover ≥ ₹5 Lakh in last 3 financial years
OEM manufacturer with ≥5 years experience
ISO 9001:2015 certified production facility
EMD/e-BG through NeSL with UID NCOGD2383P
Quantity
330
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
10
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Traffic Cone (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Cuttack
Delivery Pincodes
753003
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| GAYADHAR BEHERA | 753003,OMP Square Cuttack | Cuttack | Odisha | 753003 | 330 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent account number (PAN) card
Experience certificates for similar traffic cone supply
Audited financial statements (last 3 years)
EMD/e-BG document as per bid requirements with UID NCOGD2383P
Technical bid submission with ISO 9001:2015 certification details
OEM authorization letter from manufacturer
Proof of prior turnover compliance (average ≥ ₹5 Lakh)
Key insights about ODISHA tender market
Bidders should submit EMD via electronic BG through NeSL with UID NCOGD2383P, provide ISO 9001:2015 certification details, and attach OEM authorization. Ensure average turnover ≥ ₹5 Lakh in last 3 years and demonstrate via technical committee. Delivery terms follow OGFR-2023/GFR; 25% quantity variation permitted.
Required documents include GST certificate, PAN, three-year audited financials, experience certificates for similar cones, EMD/e-BG with UID NCOGD2383P, ISO 9001:2015 certification proof, OEM authorization, and proof of turnover compliance. Demonstrations must be completed for technical committee verification.
Cones must have a 410 mm bottom diameter, orange body with white reflective tape, a top cap, and a ring hook interlinking provision. They should be UV resistant, semi-flexible, and non-fading, with a 1-year warranty and ISO 9001:2015 certification for the manufacturer.
EMD is required via electronic BG through NeSL with UID NCOGD2383P; submit the BG as per bid terms. This aligns with OGFR-2023/GFR regulations and is essential to be considered for the procurement of traffic cones.
The purchaser may increase/decrease quantity up to 25% of bid quantity at contract placement and during the contract currency. Delivery time extends with quantity changes using the specified formula, with a minimum extension of 30 days.
Public Procurement (Preference to Make in India) provisions apply for eligible bidders, with relaxations possible for local MSEs/startups if they meet quality and technical requirements and bid documentation criteria.