TenderDekho Logo
Closed GEM

Invitation to Bid - Cover bolts,Cover bolts,Isolator Assembly K3 ON OFF,Isolator assembly K4 ON OFF 300A,Mounting bar f in ANUPPUR, MADHYA PRADESH

Bid Publish Date

15-Feb-2025, 11:19 am

Bid End Date

25-Feb-2025, 12:00 pm

EMD

₹200

Value

₹87,86,412

Progress

Issue15-Feb-2025, 11:19 am
Technical24-02-2025 16:03:42
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

1735

Category

Cover bolts

Bid Type

Two Packet Bid

Categories 74

South Eastern Coalfields Limited invites bids for Cover bolts, Cover bolts, Isolator Assembly K3 ON OFF, Isolator assembly K4 ON OFF 300A, Mounting bar f in ANUPPUR, MADHYA PRADESH. Quantity: 1735. Submission Deadline: 25-02-2025 12: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF COALCOAL INDIA LIMITEDSOUTH EASTERN COALFIELDS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7510482.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 180 Items Sign in for GEM prices

#1

Cover bolts

00.01.10A

295 pieces Delivery: 45 days
#2

Cover bolts

00.01.10H

320 pieces Delivery: 45 days
#3

Isolator Assembly K3 ON OFF

05.00.00

4 pieces Delivery: 45 days
#4

Isolator assembly K4 ON OFF 300A

05.30.00.00

4 pieces Delivery: 45 days
#5

Mounting bar for isolator

50101

1 pieces Delivery: 45 days
#6

Coil spring for isolator up to 400A

05.03.01

4 pieces Delivery: 45 days
#7

Isolator micro switch assly

05.05.00

5 pieces Delivery: 45 days
#8

Catcher Assembly

11.05.31

4 pieces Delivery: 45 days
#9

Arc Chutes

AC1

3 pieces Delivery: 45 days
#10

Ammeter100 5 for ACB

130 A 0 100 SO A

4 pieces Delivery: 45 days
#11

Ammeter 200 5 for ACB

130 A 0 200 SO A

5 pieces Delivery: 45 days
#12

Ammeter 300 5 for ACB

130 A 0 300 SO A

3 pieces Delivery: 45 days
#13

Ammeter 400 5 for ACB

130 A 0 400 SO A

3 pieces Delivery: 45 days
#14

Push Button Actuator for EL Test

BOES2

8 pieces Delivery: 45 days
#15

Push Button Actuator for EL reset

BOES3

7 pieces Delivery: 45 days
#16

Potential Transformer

DS

17 pieces Delivery: 45 days
#17

Incoming Gland

G1

4 pieces Delivery: 45 days
#18

Outgoing Gland

G2

7 pieces Delivery: 45 days
#19

Glass fuse with holder

BOGF

19 pieces Delivery: 45 days
#20

Glass fuse with holder

BOGFH

13 pieces Delivery: 45 days
#21

Power cable for 300A for Breaker Chamber IC OG Set

ICCB3

2 pieces Delivery: 45 days
#22

Power cable for 400A for Breaker Chamber IC OG Set

ICCB4

2 pieces Delivery: 45 days
#23

Power cable for 200A for Breaker Chamber IC OG Set

ICCI2

1 pieces Delivery: 45 days
#24

Power cable for 300A for Breaker Chamber IC OG Set

ICCI3

2 pieces Delivery: 45 days
#25

Power cable for 400A for Breaker Chamber IC OG Set

ICCI4

2 pieces Delivery: 45 days
#26

Limit switch 2NO 2NC for breaker

BO4LSPP

20 pieces Delivery: 45 days
#27

Brass Terminal

OBA

16 pieces Delivery: 45 days
#28

Push button with spindle

PBS

5 pieces Delivery: 45 days
#29

Brass Terminal for CP

T2B

10 pieces Delivery: 45 days
#30

Earth Leakage Relay 50 750m A with Time Lag with CBCT

ELM7LAT S 80M

30 pieces Delivery: 45 days
#31

Moving contract for isolator

05.02.02

2 pieces Delivery: 45 days
#32

Overload Assembly Breaker 30A 100A

11.01.00A

2 pieces Delivery: 45 days
#33

Overload Assembly Breaker 110A 200A

11.01.00B

1 pieces Delivery: 45 days
#34

overload coil 200 A

11.01.03

3 pieces Delivery: 45 days
#35

Moving contact For breaker upto 200 amps

11.02.06

5 pieces Delivery: 45 days
#36

Moving contact For breaker 400 amps

11.02.06B

2 pieces Delivery: 45 days
#37

Shunt trip assly complete.

11.03.00

5 pieces Delivery: 45 days
#38

No Volt Coil Assy. Under Voltage Coil Assy. Without Moulding

11.04.00

2 pieces Delivery: 45 days
#39

No Volt Coil Assy. Under Voltage Coil Assy. With Moulding

11.04.00A

1 pieces Delivery: 45 days
#40

Current transformer for ammeter

120 100 5 5

3 pieces Delivery: 45 days
#41

Current transformer for ammeter

120 200 5 5

2 pieces Delivery: 45 days
#42

Busbar

BBR300

1 pieces Delivery: 45 days
#43

Indicating lamps

LAB9 ACB

15 pieces Delivery: 45 days
#44

Moving contact finger 400A

110202 400

1 pieces Delivery: 45 days
#45

Fixed contact Assy. For breaker

110600

2 pieces Delivery: 45 days
#46

Operating handle for isolator

H3

2 pieces Delivery: 45 days
#47

Terminal bushing with insulator DMC incoming 6mm 20mm

T5 1

1 pieces Delivery: 45 days
#48

Terminal bushing with insulator DMC incoming 8mm 20mm

T5 2

6 pieces Delivery: 45 days
#49

Fixed contact Assy. For isolator 400A

5300100

1 pieces Delivery: 45 days
#50

Overload Assembly Breaker 310A 400A

11.01.00D

1 pieces Delivery: 45 days
#51

ARC chutes pillar

110606

1 pieces Delivery: 45 days
#52

Fixed contact breaker

110604B

1 pieces Delivery: 45 days
#53

Potential transformer 80v

DS1

1 pieces Delivery: 45 days
#54

Overload Assembly Breaker 210A-300A

11.01.00C

1 pieces Delivery: 45 days
#55

Limit Switch NO NC for Breaker

BOHM

2 pieces Delivery: 45 days
#56

on off Isolator 300A

k4

1 pieces Delivery: 45 days
#57

Rectifier

BOA6

6 pieces Delivery: 45 days
#58

HT Bushing with Stud. 3.3KV

HTTA 3.3

6 pieces Delivery: 45 days
#59

Reveering Isolator 3.3KV

KIR 3.3

3 pieces Delivery: 45 days
#60

HT REC PT FUSE

BOSSABWNA

6 pieces Delivery: 45 days
#61

P Fuse Plate wiring ass.

BOSSABWNA CP

2 pieces Delivery: 45 days
#62

HT Fuse Support Base Eppxy Cast

HTFSE

2 pieces Delivery: 45 days
#63

Aux. Transformor Single Phase

PTFX

5 pieces Delivery: 45 days
#64

Current Transformor

120 100 5 15

10 pieces Delivery: 45 days
#65

Pilot relay IS

PRU3 PRU11

5 pieces Delivery: 45 days
#66

Vaccum Containor Coil 110V DC

BEV0049

2 pieces Delivery: 45 days
#67

Multifunction Pilot Relay 12.5 DC

MPRU5

5 pieces Delivery: 45 days
#68

Potential Transformor 3.3KV 500VA

HTPTL1

4 pieces Delivery: 45 days
#69

Current Transformor 50 5 15VA

120 60 5 15

4 pieces Delivery: 45 days
#70

Ammeter

AM

6 pieces Delivery: 45 days
#71

Ammeter 160 5 for HT 3.3 Starter

30 A 0 100 SO SHT

4 pieces Delivery: 45 days
#72

Voltmeter

VM SO65

5 pieces Delivery: 45 days
#73

HT Bushing with extended terminal

HTTB

6 pieces Delivery: 45 days
#74

Aux Contractor 110V

BOCA2DN1319

1 pieces Delivery: 45 days
#75

3Ph Transformor 3.3 KV 500 VA

HTPTL33

1 pieces Delivery: 45 days
#76

Current Transformor

LAT 30 10

2 pieces Delivery: 45 days
#77

Aux Contractor For Coil

BOCA2DN1229

2 pieces Delivery: 45 days
#78

HT POWER FUSE 3.3KV GRADE UP TO 200A

HRC 200

3 pieces Delivery: 45 days
#79

HT Bushing

T33

1 pieces Delivery: 45 days
#80

Brass cone gland assly.

BOBCG

1 pieces Delivery: 45 days
#81

Earth leakage relay 50 750ma 750mA 2A dual setting with lag CBCT

ELM7DLAT S 80M

11 pieces Delivery: 45 days
#82

Resistance

06.05.08

2 pieces Delivery: 45 days
#83

Vaccum Iterrupter

BEV0053

3 pieces Delivery: 45 days
#84

HOL GING RESISTANCE

BEV0060

2 pieces Delivery: 45 days
#85

CONTROL RELAY

BO3R

1 pieces Delivery: 45 days
#86

VOLTMETER SELECTOR SWITCH

BOKCSRP135VS

1 pieces Delivery: 45 days
#87

Potential Transformor

FX220

2 pieces Delivery: 45 days
#88

ISOLATOR HANDLE

H6

1 pieces Delivery: 45 days
#89

OFF DELAY TIMER

BOTA2DT2

2 pieces Delivery: 45 days
#90

Incoming Through going Sealing Box with Cone and Gland Assy

TB2

4 pieces Delivery: 45 days
#91

Outgoing terminal swaling box with cine Gland 3 way

TB8

9 pieces Delivery: 45 days
#92

Copper Terminals with DMC Bushing

T5

12 pieces Delivery: 45 days
#93

Brass Terminal with DMC Bushing

T10

4 pieces Delivery: 45 days
#94

Brass Terminal with nylon bushing

OBA

12 pieces Delivery: 45 days
#95

Isolator handle

H9

6 pieces Delivery: 45 days
#96

ON OFF Isolator 100A

K52P

4 pieces Delivery: 45 days
#97

Glass Fuse with Holder

BOGFH

42 pieces Delivery: 45 days
#98

NO Actuator

BOES2

25 pieces Delivery: 45 days
#99

NC Actuator

BOES3

25 pieces Delivery: 45 days
#100

Relay Coil Voltage 2CO Contact

BOPMPC

13 pieces Delivery: 45 days
#101

Pot. Transformer

TYPE F

6 pieces Delivery: 45 days
#102

Push Button With Spindle

PB11 PBSL

15 pieces Delivery: 45 days
#103

Actuator NO NC

BOES1

12 pieces Delivery: 45 days
#104

HRC Fuse 16A

138 16

24 pieces Delivery: 45 days
#105

HRC Fuse 63A

138 63

6 pieces Delivery: 45 days
#106

Sensitive Earth Leakage Relay 50 300mA with variable time lag

ELM7STWPT

7 pieces Delivery: 45 days
#107

indicating led

LAB9 LT

3 pieces Delivery: 45 days
#108

BODY BOLT

00.01.00

40 pieces Delivery: 45 days
#109

AMMMETER

AM

2 pieces Delivery: 45 days
#110

CORE BLANCE TRANSFORMER

CBT80M

1 pieces Delivery: 45 days
#111

Thermal overloderelay with block

MC305ANA3K

1 pieces Delivery: 45 days
#112

Isolator K3 ON OFF

05.00.00

3 pieces Delivery: 45 days
#113

thermal OL Relay CTR 50 5 Range 20A 50A

122 T 20 50

2 pieces Delivery: 45 days
#114

Ammeter 120 5 for LT Starter

130 A 0 120 S0 SLT

2 pieces Delivery: 45 days
#115

ON Delay Timer

135 30 ON

10 pieces Delivery: 45 days
#116

Potential TransforIner

B

3 pieces Delivery: 45 days
#117

Aux, Contactor220V AC

BOCA2DN1229

8 pieces Delivery: 45 days
#118

GLASS FUSE WITH HOLDER

BOGF

42 pieces Delivery: 45 days
#119

Potential Transformer 80 VA

DS1

6 pieces Delivery: 45 days
#120

Sensitive Earth leakage relay 50 300mA with variable time lag with control transformer and suitable CBCT

ELM7STWPT

20 pieces Delivery: 45 days
#121

Pilot Relay

PRU3 PRU11

10 pieces Delivery: 45 days
#122

BRASS TERMINAL WITH DMC BUSHING

T8

10 pieces Delivery: 45 days
#123

BRASS STUD WITH DMC BUSHING FOR OG

T1B

10 pieces Delivery: 45 days
#124

HRC Power Fuse

138 200A

6 pieces Delivery: 45 days
#125

Isolator Handle

H10

1 pieces Delivery: 45 days
#126

Thermal O L relay CTR 120 5 range 48A 120A

122 T 48 120

3 pieces Delivery: 45 days
#127

Off Delay Timer

BOTA2DT2

6 pieces Delivery: 45 days
#128

Aux. Relay 220V AC Coll 3CO Base

BOEN3R

2 pieces Delivery: 45 days
#129

Multi Pilot relay 12.5 DC

MPRU5

5 pieces Delivery: 45 days
#130

single Phasing Preventer Current Operated

BOCOP20

9 pieces Delivery: 45 days
#131

Single Pole Two Way Toggle Switch

BOTS

4 pieces Delivery: 45 days
#132

Actuator NO

BOES2

30 pieces Delivery: 45 days
#133

Actuator NC

BOES3

6 pieces Delivery: 45 days
#134

Actuator NO NC

BOES1

10 pieces Delivery: 45 days
#135

Push Button Element

PB11 PBSL

18 pieces Delivery: 45 days
#136

Isolator On Oft Rov 300AA

K4R

3 pieces Delivery: 45 days
#137

Isolator 3P ON OFF 100A

K5

4 pieces Delivery: 45 days
#138

INDICATING LAMP

LAB9 TSU HT

1 pieces Delivery: 45 days
#139

POTENTIAL TRANSFORMER

HTPL 1

1 pieces Delivery: 45 days
#140

HT BUSHING

HTTA 3.3

2 pieces Delivery: 45 days
#141

CONTROL RELAY 110V

BO3R

1 pieces Delivery: 45 days
#142

DC POWER PACK

DCPP

1 pieces Delivery: 45 days
#143

HCR HT PT FUSE 3.3KV

138 3.15 3.3

3 pieces Delivery: 45 days
#144

PCT TRANSFORMER

FX200

1 pieces Delivery: 45 days
#145

AUX CONTRACTOR

MCBA022A7

2 pieces Delivery: 45 days
#146

GLASS FUSE WITH HOLDER

BOGFH

6 pieces Delivery: 45 days
#147

NATUTRAL EARTHING RESISTOR

BONER

3 pieces Delivery: 45 days
#148

VCB CLOSING COIL

50.10.00

1 pieces Delivery: 45 days
#149

VCB SHUNT TRIP COIL

50.05.00

4 pieces Delivery: 45 days
#150

VACUUM INTERRUPTER

BEV0053

1 pieces Delivery: 45 days
#151

NEUTRAL MONITORING RELAY WITH RESISTANCE

NRMR

7 pieces Delivery: 45 days
#152

Earth Leakage 5 750 mA and 750 mA 2 A dual setting with time lag with CBCT

ELM7DLAT S 80M

2 pieces Delivery: 45 days
#153

3 Pole oil Dashpot relay 300 5

122 M 225 300 450 3P

5 pieces Delivery: 45 days
#154

DC Power pack

DCPP

8 pieces Delivery: 45 days
#155

VCB Limit sweitch

BOLSO

8 pieces Delivery: 45 days
#156

Sensitive Earth leakage relay 50 300mA with variable time lag with control transformer and suitable CBCT

ELM7STWPT

15 pieces Delivery: 45 days
#157

Potential Transformer

HTPTL1 131 3.3 110 1P

4 pieces Delivery: 45 days
#158

HV Bushuing

HTTA F

10 pieces Delivery: 45 days
#159

Isolator

KIE 3.3

3 pieces Delivery: 45 days
#160

Current Transformer

LAT200 100 5

5 pieces Delivery: 45 days
#161

HT Bushing

T33

10 pieces Delivery: 45 days
#162

VCB Shunt Trip Coil

65 06 05

9 pieces Delivery: 45 days
#163

Voltmeter

VM SO65

5 pieces Delivery: 45 days
#164

Control Relay

BOPLACO2

6 pieces Delivery: 45 days
#165

Capictor Trip Device

RAPTOR

3 pieces Delivery: 45 days
#166

Vaccum Circuit Breaker

VULCAN

1 pieces Delivery: 45 days
#167

POT Transformer 500VA

PT3.3 500

3 pieces Delivery: 45 days
#168

Indicating lamp

LAB9 VCB 3.3

19 pieces Delivery: 45 days
#169

Contrtol fuse

BOKUDF4

15 pieces Delivery: 45 days
#170

Under voltage relay 110V

E UVR 1

2 pieces Delivery: 45 days
#171

VCB Auxiliary Rotary Switch

BOARC

6 pieces Delivery: 45 days
#172

VCB CLOSING COIL

65 04 05

10 pieces Delivery: 45 days
#173

Ammeter 200 5 for VCB

130 A 0 200 SO V 33

2 pieces Delivery: 45 days
#174

Push element 1NO 1NC

BOES1

22 pieces Delivery: 45 days
#175

Vaccum interrupter

65 04 00

3 pieces Delivery: 45 days
#176

3 Pole oil Dashpot relay 100 5

122 M 3.8 5 7.5 3P

3 pieces Delivery: 45 days
#177

3 Pole oil Dashpot relay 150 5

122 M 3.75 5 7.5 3P

3 pieces Delivery: 45 days
#178

3 Pole oil Dashpot relay 400 5

122 M 3.75 5 7.5 3P

3 pieces Delivery: 45 days
#179

MCB

BOTP6

4 pieces Delivery: 45 days
#180

Ammeter

AM

4 pieces Delivery: 45 days

Technical Results

S.No Seller Item Date Status
1
PAB ENGINEERING WORKS PRIVATE LIMITED   Under PMA
-24-02-2025 16:03:42

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

What are the eligibility requirements for participation in this tender?

The eligibility requirements include being a registered entity, demonstrating relevant experience in supplying similar mining spare parts, and adhering to applicable statutory regulations. Additionally, bidders must have a track record of past performance, especially with government contracts.

What technical specifications need to be met for the components in this tender?

Bidders must ensure that their proposed products comply with industry standards and quality benchmarks. Technical specifications require that the offered items, such as Cover bolts and 3 Pole oil Dashpot relays, meet functional and safety criteria as outlined in the tender documents.

What are the important details regarding the Earnest Money Deposit (EMD) for this tender?

The Earnest Money Deposit (EMD) required for bidding is £200. This deposit is critical as it indicates the bid's seriousness and commitment to the tender process. Bidders will need to include this amount with their submissions to be considered compliant.

What is the submission method for this tender?

Bidders must submit their offers electronically via the official GeM portal. All mandatory documents, including the main tender and supporting details, need to be uploaded in specified formats as detailed in the tender guidelines.

What are the benefits available for MSEs in this tender?

The tender framework includes specific provisions that favor Micro, Small, and Medium Enterprises (MSEs), encouraging their participation in government procurement. Additionally, compliance with 'Make in India' policies further supports local content procurement, fostering growth opportunities for startups and MSEs in the industry.