TenderDekho Logo
Active GEM

UPPCL Substation Clamps/Connectors Tender Gautam Buddha Nagar UP 2026

Bid Publish Date

20-Oct-2026, 1:58 pm

Bid End Date

03-Nov-2026, 2:00 pm

Value

₹19,411

Generate Docs

Progress

Issue20-Oct-2026, 1:58 pm
Corrigendum31-Oct-2026
AwardPending

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL) – Energy Department Uttar Pradesh. Product: Substation clamps / connectors (Q3 category). Location: GAUTAM BUDDHA NAGAR, Uttar Pradesh 201301. Estimated value: ₹19,411.00. BOQ shows zero items, implying undefined quantity at this stage. The tender includes an option clause allowing +/- 25% quantity variation at contracted rates, with delivery time calculations anchored to the original delivery period and a minimum extension of 30 days. A Buyer ATC document is uploaded for reference. This procurement centers on essential electrical hardware for substations, with emphasis on contract flexibility and delivery scheduling rules.

Technical Specifications & Requirements

  • Category: Substation clamps / connectors (Q3).
  • Estimated value: ₹19,411.00.
  • No BOQ items available; specific item-level technical data not published.
  • Option clause: Purchaser may increase/decrease quantity by up to 25% of bid/contract quantity; extended delivery time uses formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Delivery period rules: Commences from last date of original delivery order; extension timing follows extended period rules; ATC document uploaded for bidder reference.
  • Delivery terms: Based on contract rates; no explicit payment terms published in the provided terms.
  • Brand/OEM constraints: Not specified in data; ATC may contain scope details to bidders.

Terms & Eligibility

  • EMD: Not specified in the available data.
  • Delivery: Flexible option-based schedule; minimum 30 days extension requirement when scaling orders.
  • Payments: Not clearly defined in the provided terms; bidders should review ATC for payment terms.
  • Documents: Full SKUs/technical specs, GST, PAN, experience, and OEM authorizations are typically required; actual list to be confirmed in ATC.
  • Rights: Purchaser reserves right to modify quantity by ±25% during contract and currency; delivery timelines anchored to original order dates.
  • Penalties/Warranty: Not specified in the excerpt; bidders should verify in the ATC document.

Key Specifications

  • Product category: Substation clamps/connectors (Q3)

  • Estimated contract value: ₹19,411.00

  • BOQ: 0 items published; no itemized quantities available

  • Option clause enabling ±25% quantity variation at contracted rates

  • Delivery period to be calculated from original order date; minimum extension 30 days

Terms & Conditions

  • Option clause allows 25% quantity variation during contract and currency

  • Delivery period rules are tied to the last original delivery order date

  • EMD and precise payment terms not disclosed in the available data

Important Clauses

Option Clause on Quantity

Purchaser may increase/decrease quantity up to 25% of bid/contract quantity at contracted rates.

Delivery Schedule Extension

Extended delivery time is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

Delivery Commencement

Delivery period starts from the last date of the original delivery order.

Bidder Eligibility

  • Experience in supplying electrical substation clamps/connectors or related equipment

  • GST registration and valid PAN card

  • Capability to meet OEM authorization requirements as per ATC

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

1

Past Performance

50 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Substation Clamps / Connectors (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Gautam Buddha Nagar

Delivery Pincodes

201301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Praveen Dubey201301,ELECTRICITY TRANSMISSION DIVISION-I , 220 KV SUB STATION SECTOR- 20 NOIDAGautam Buddha NagarUttar Pradesh201301115-

Authority Records

ENERGY DEPARTMENTUTTAR PRADESH POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10055362.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Electricity Civil Transmission Circle 132 Kv S/s Martinpurwa Lucknow

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

31-Oct-2026

Extended Deadline

03-Nov-2026, 8:30 am

Opening Date

04-Nov-2026, 8:30 am

#2

Update

28-Oct-2026

Extended Deadline

31-Oct-2026, 8:30 am

Opening Date

01-Nov-2026, 8:30 am

Advertisement

Categories 6

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar substation clamps/connectors

4

Financial statements / turnover evidence

5

EMD submission proof (as applicable in ATC)

6

Technical bid documents demonstrating conformity to IS/IEC standards (if specified in ATC)

7

OEM authorization / manufacturer-backed compliance certificates

8

Any special technical literature or product datasheets referenced in ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Substation clamps tender in Gautam Buddha Nagar 2026?

Bidders should submit standard GST, PAN, and experience certificates, plus OEM authorizations if required by the ATC. The tender allows ±25% quantity variation at the contracted rate and requires adherence to the delivery timeline formula. Review the ATC for payment terms and any device-specific standards.

What documents are required for UPPCL clamps tender submission in UP?

Essential documents typically include GST certificate, PAN card, company financials, experience certificates for similar clamps/connectors, and OEM authorization. The ATC may specify technical datasheets, safety certifications, and conformity to relevant standards; ensure all documents align with the tender terms.

What is the EMD amount for the UPPCL substation clamps tender 2026?

The provided data does not specify an EMD amount. Bidders should check the ATC for the exact EMD or security deposit requirement and ensure compliance with any bank guarantee or online payment procedures indicated there.

What are the delivery terms for the UPPCL substation clamps contract?

Delivery begins from the last date of the original delivery order, with option-based quantity changes allowed up to 25%. If quantities increase, the extended period is calculated as (Increased quantity/Original quantity) × Original delivery period, minimum 30 days.

What standards or certifications are required for clamps/connectors tender in UP?

The ATC may require OEM authorizations and product conformity to relevant electrical standards. Specific standards like IS/IEC or ISO are typically cited in the ATC; verify the exact standard numbers and certification bodies in the uploaded ATC document.

How to verify eligibility criteria for UPPCL clamps tender 2026?

Confirm experience in supplying substation clamps/connectors or similar electrical hardware, ensure GST registration and financial stability, and obtain OEM authorization if mandated by ATC. The tender allows 25% quantity variation and contains delivery-time rules requiring careful scheduling.

When is the bid submission deadline for UPPCL clamps tender 2026?

The end date is not provided here; bidders must consult the ATC attached to the tender listing to confirm the exact submission deadline, along with any pre-bid meeting dates and portal submission steps.

What are the payment terms for UPPCL clamps/connectors supply contract?

Payment terms are not stated in the provided excerpt. Refer to the ATC for the definitive terms, including any advance, milestone, or post-delivery payment conditions and the acceptable payment methods.

Advertisement