Bid Publish Date
08-Oct-2026, 9:36 am
Bid End Date
19-Oct-2026, 10:00 am
Location
Progress
Organization: Indian Army (Department Of Military Affairs). The procurement targets a range of electrical commodities including Aluminium cable 2 core 10 sqmm, Aluminium cable 2 core 8 sqmm, Bulb Holder for LED Bulb, Tube light 20 watt, Bed switch, Change Over Switch 4 pole 415 v, Flexible pipe point 75 mm, Wooden Screw 4mm 3 inch, Gitty, Flexible Twisted wire 1 sqmm copper, Change Over Switch 63 A, Cable Tie 250mmx3.6mm packets, and Electric Wire 1.5 mm 1 core. Location details are not specified; the project scope is supply of goods only. A 1-year warranty is mandated, with OEM warranty certificates required at delivery and a service network in India for after-sales support. The tender includes an option clause allowing up to 25% quantity variation at contracted rates. The BOQ lists 13 items, but specific quantities are not disclosed. Unique emphasis is on timely servicing and installation/training as part of post-delivery support.
Item list includes aluminium cables (2 core 10 sqmm, 2 core 8 sqmm), LED bulb holder, 20W tube light, bed switch, 4 pole 415 V change over switch, 75 mm flexible pipe, 4 mm wooden screw (3 inch), gitty, 1 sqmm copper twisted wire, 63 A change over switch, cable ties (250 mm x 3.6 mm), and 1.5 mm single-core wire.
Scope limited to supply of goods; no explicit installation requirements in tender data.
Warranty requirement: 1 year from final acceptance; OEM warranty certificates needed at delivery.
After-sales: dedicated service personnel and Indian service centers; detailed SLA to be incorporated in bid.
Option clause allows up to 25% quantity variation at contracted rates during contract tenure.
Option clause permits 25% quantity variation during contract and extension; delivery timing tied to original/extended periods.
Scope restricted to supply of goods; installation not explicitly required.
OEM warranty certificates required at delivery; 1-year warranty with service network in India.
Not specified; bidders should seek explicit payment terms in final bid pack and confirm any advance or milestone payments.
Delivery period linked to option clause; extended delivery calculations use (increased quantity / original quantity) × original delivery period with a minimum of 30 days.
Not specified in available data; bidders should verify LD provisions in the final tender documents.
Ability to supply the listed electrical goods in bulk quantities
OEM authorization and warranty support in India
Commitment to 1-year warranty and after-sales service network
Quantity
1227
Category
Aluminium cable 2 core 10 sqmm
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Aluminium cable 2 core 10 sqmm , Aluminium cable 2 core 8 sqmm , Bulb Holder for LED Bulb , Tube light 20 watt , Bed switch , Change Over Switch 4 pole 415 v , Flexible pipe point 75 mm , Wooden Screw 4mm 3 inch , Gitty , Flexible Twisted wire 1 sqmm copper , Change Over Switch 63 A , Cable Tie 250mmx3point6mm packets , Electric Wire 1point5 mm 1 core in mtr
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
East Siang
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | East Siang | East Siang | - | - | 200 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Aluminium cable 2 core 10 sqmm
Aluminium cable 2 core 10 sqmm
Aluminium cable 2 core 8 sqmm
Aluminium cable 2 core 8 sqmm
Bulb Holder for LED Bulb
Bulb Holder for LED Bulb
Tube light 20 watt
Tube light 20 watt
Bed switch
Bed switch
Change Over Switch 4 pole 415 v
Change Over Switch 4 pole 415 v
Flexible pipe point 75 mm
Flexible pipe point 75 mm
Wooden Screw 4mm 3 inch
Wooden Screw 4mm 3 inch
Gitty
Gitty
Flexible Twisted wire 1 sqmm copper
Flexible Twisted wire 1 sqmm copper
Change Over Switch 63 A
Change Over Switch 63 A
Cable Tie 250mmx3point6mm packets
Cable Tie 250mmx3point6mm packets
Electric Wire 1point5 mm 1 core in mtr
Electric Wire 1point5 mm 1 core in mtr
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Aluminium cable 2 core 10 sqmm | Aluminium cable 2 core 10 sqmm | 200 | pieces | 761pao | 15 | |
| 2 | Aluminium cable 2 core 8 sqmm | Aluminium cable 2 core 8 sqmm | 200 | pieces | 761pao | 15 | |
| 3 | Bulb Holder for LED Bulb | Bulb Holder for LED Bulb | 20 | pieces | 761pao | 15 | |
| 4 | Tube light 20 watt | Tube light 20 watt | 10 | pieces | 761pao | 15 | |
| 5 | Bed switch | Bed switch | 30 | pieces | 761pao | 15 | |
| 6 | Change Over Switch 4 pole 415 v | Change Over Switch 4 pole 415 v | 2 | pieces | 761pao | 15 | |
| 7 | Flexible pipe point 75 mm | Flexible pipe point 75 mm | 50 | pieces | 761pao | 15 | |
| 8 | Wooden Screw 4mm 3 inch | Wooden Screw 4mm 3 inch | 50 | pieces | 761pao | 15 | |
| 9 | Gitty | Gitty | 1 | pieces | 761pao | 15 | |
| 10 | Flexible Twisted wire 1 sqmm copper | Flexible Twisted wire 1 sqmm copper | 300 | pieces | 761pao | 15 | |
| 11 | Change Over Switch 63 A | Change Over Switch 63 A | 2 | pieces | 761pao | 15 | |
| 12 | Cable Tie 250mmx3point6mm packets | Cable Tie 250mmx3point6mm packets | 2 | pieces | 761pao | 15 | |
| 13 | Electric Wire 1point5 mm 1 core in mtr | Electric Wire 1point5 mm 1 core in mtr | 360 | pieces | 761pao | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar supply
Financial statements for last 2-3 years
EMD/Security deposit documentation (as applicable in final pack)
Technical bid documents
OEM authorization letters
Warranty certificates and after-sales service details
Proof of service centers in India
Key insights about ARUNACHAL PRADESH tender market
Bidders should submit OEM authorization, warranty certificates, installation/maintenance capabilities, and standard commercial documents. Also include GST, PAN, financial statements, and any required technical bid documents. Ensure OEM certificates accompany goods at delivery, with service centers listed in the bid.
Prepare a goods-only supply bid with itemized pricing for aluminium cables, LED bulb holders, tube lights, switches, and related fittings. Include OEM certificates, 1-year warranty terms, and a clear delivery schedule. Address the 25% quantity variation option and provide service capability details.
The contract mandates a 1 year warranty from final acceptance or after commissioning. Submit OEM warranty certificates at delivery and demonstrate a structured after-sales support network with service centers across India to ensure timely fault rectification.
The purchaser may increase or decrease the order by up to 25% of bid quantity at contract placement and during the contract currency. Delivery timelines adjust proportionally, with a minimum extension of 30 days, requiring bidders to plan scalable production.
The BOQ lists 13 items including aluminium cables (2 core 10 sqmm and 2 core 8 sqmm), LED bulb holders, tube lights (20 W), bed switches, 4-pole 415 V changeover switches, 75 mm flexible pipes, wooden screws, gitty, 1 sqmm copper wire, 63 A changeover switches, cable ties, and 1.5 mm single-core wires; exact quantities are not disclosed.
Applicants must provide OEM authorizations and warranty documentation; while specific standards are not listed, ensure compliance with Indian procurement norms and verify that all electrical components meet local safety and performance expectations as per final tender documents.
Delivery timing follows the original delivery period; if the option clause is exercised, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Eligibility includes ability to supply listed goods, OEM authorization, and a demonstrated after-sales service network in India; ensure 1-year warranty capability and readiness to provide service personnel for timely maintenance.