TenderDekho Logo
Active GEM

Tender Notice for Desert Air Cooler 115 Litre,Electrical Wiring,Modular Switch,PVC Conduit,Electrical Connection and in NORTH DELHI, DELHI

Bid Publish Date

24-Aug-2026, 11:57 am

Bid End Date

03-Sep-2026, 12:00 pm

Value

₹96,300

Location

NORTH DELHI , DELHI

Progress

Issue24-Aug-2026, 11:57 am
Corrigendum24-Aug-2026
AwardPending

A tender has been published for Indian Army Desert Air Cooler 115 Litre, Electrical Wiring, Modular Switch, PVC Conduit, Electrical Connection and Testing in NORTH DELHI, DELHI. Quantity: 25 by. Submission Deadline: 03-09-2026 12: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

25

Category

Electrical Wiring

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

3

Past Performance

20 %

Warranty Period

3 days

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Desert Air Cooler 115 Litre , Electrical Wiring , Modular Switch , PVC Conduit , Electrical Connection and Testing

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

NORTH DELHI

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NORTH DELHINORTH DELHI--545-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9797681.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

24-Aug-2026

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Desert Air Cooler 115 Litre

Supply and fix desert air cooler with plastic body, tank capacity 115 litres, lockable heavy-duty wheels Make - Symphony/Crompton/Bajaj/Usha/Havells

5 each Delivery: 45 days
#2

Electrical Wiring

Providing and laying complete electrical wiring for desert air cooler with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface/recessed PVC conduit, including suitable modular switch, phenolic laminated sheet, suitable size MS box, earthing and all necessary accessories, complete as specified and directed.

5 job Delivery: 45 days
#3

Modular Switch

Providing and fixing suitable modular type switch for operation of desert air cooler, including mounting, connection, necessary accessories and fixing in suitable MS box.

5 job Delivery: 45 days
#4

PVC Conduit

Providing and fixing suitable size surface/recessed PVC conduit for electrical wiring of desert air cooler, including bends, couplers, saddles, clamps and all necessary accessories.

5 job Delivery: 45 days
#5

Electrical Connection and Testing

Making complete electrical connection of desert air cooler with existing electrical supply all complete.

5 job Delivery: 45 days

Categories 34

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer