TenderDekho Logo
GEM

Bharat Petroleum Corporation Ltd Rich Amine Pumping Equipment Tender India 2026 – 25 Lakh EMD, 22 BOQ Items, Site Supervision

Bid Publish Date

17-May-2026, 9:18 am

Bid End Date

24-Jul-2026, 2:00 pm

EMD

₹2,37,029

Generate Docs

Progress

Issue17-May-2026, 9:18 am
Corrigendum18-Jul-2026
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

167

Category

Rich Amine Feed Pumps

Categories 12

Tender Overview

Bharat Petroleum Corporation Ltd seeks bids for a broad range of pump systems and site supervision services covering Rich Amine Feed Pumps, Amine Regenerator Reflux Pumps, Amine Regenerator Bottom Pumps, Lean Amine Pumps, Amine Sump Pumps, C3/C4 Splitter Reflux Pumps, HP/MP BFW Pumps, Treated Raw Water, Service Water, and related site supervision scopes. The tender lists 22 BoQ items with no specified unit quantities in the excerpt but implies a multi-pump and supervision package across multiple units. The procurement will be conducted on the GeM portal, with an EMD of ₹25,00,000 and an option clause allowing quantity and delivery extensions up to 25%. The contract emphasizes delivery timeframes anchored to the original delivery period and extended periods, plus price protection at contracted rates. This opportunity targets suppliers with capabilities in heavy-duty pump sets, allied supervision, and PM/CMC support. Unique aspects include multi-item scope, government-style option clause, and ATC alignment on tender documents.

Technical Specifications & Requirements

  • Product scope: Rich Amine Feed Pumps, Amine Regenerator Reflux Pumps, Amine Regenerator Bottom Pumps, Lean Amine Pump 1 & 2, Amine Sump Pump, C3/C4 Splitter Reflux Pumps, HP BFW Pumps, MP BFW Pumps, Treated Raw Water Pumps, Service Water Pumps, plus site supervision for each.
  • BoQ context: 22 total items; exact quantities not disclosed in available data.
  • EMD/financing: ₹25,00,000 EMD required; bid values aligned to NIT/BQC. ATC mandates compliance with combined NIT instructions and BQC criteria.
  • Delivery & execution: Option clause permits quantity fluctuation (up to 25%), with delivery period adjustments based on original timelines; minimum extension rule of 30 days applies.
  • Documentation alignment: GeM portal values govern; tender documents take precedence in contradictions.

Terms, Conditions & Eligibility

  • EMD requirement: ₹25,00,000 (EMD must be deposited in the specified form; bid with lower amount rejected).
  • Delivery policy: 25% quantity option; delivery period adjustments with formula (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days.
  • ATC/GeM alignment: Bidder must adhere to listed ATC documents (NIT, ITB, MTC, SPC, GCC, GPC, OEM authorizations).
  • BQC compliance: Technical and financial eligibility criteria to be met per NIT Clause 3; submission of required documents as per ATC.
  • Contractual regime: Prices locked to contracted rates during currency of the contract; extension possible within defined limits.
  • Submission scope: All 22 items and associated site supervision must satisfy technical compliance and financial qualification.

Key Specifications

  • Product/service names: Rich Amine Feed Pumps, Amine Regenerator Reflux Pumps, Amine Regenerator Bottom Pumps, Lean Amine Pumps, Amine Sump Pumps, C3/C4 Splitter Reflux Pumps, HP/MP BFW Pumps, Treated Raw Water Pumps, Service Water Pumps

  • Quantities: Not disclosed in excerpt; BoQ contains 22 items

  • EMD/Estimated value: EMD ₹25,00,000; contract value linked to original delivery period with option to increase up to 25%

  • Experience: Not specified in excerpt; BQC requires meeting technical & financial criteria

  • Quality/standards: Not specified in provided data; ensure alignment with OEM authorizations and GCC/GPC where applicable

Terms & Conditions

  • EMD of ₹25,00,000 required; higher bid security impacts eligibility

  • 25% quantity variation allowed; extended delivery timelines as per formula

  • ATC documents govern submission; GeM portal values prevail in conflicts

  • BQC criteria must be met irrespective of item quantity

  • Contract rates locked for the currency; delivery subject to original and extended periods

Important Clauses

Payment Terms

EMD ₹25,00,000; contract payments per GCC/GPC terms; no advance without stipulated conditions

Delivery Schedule

Delivery period commences from original order; option quantity adjustments may extend timeline with min 30 days

Penalties/Liquidated Damages

LD provisions to be according to GCC/GPC; penalties applicable for delays as per contract

Bidder Eligibility

  • Vendor must meet Technical & Financial BQC Criteria per NIT clause

  • Proven experience in supplying heavy-duty pumps and site supervision

  • OEM authorizations or equivalent certifications for pump systems

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Rich Amine Feed Pumps , Site supervision Rich Amine Feed Pumps , Amine Regenerator Reflux Pumps , Site supervision Amine Regenerator Reflux Pumps , Amine Regenerator Bottom Pumps , Site supervision Amine Regenerator Bottom Pumps , Lean Amine Pump 1 , Site supervision Lean Amine Pump 1 , Amine Pump 2 , Site supervision Amine Pump 2 , Anime Sump Pump , Site supervision Anime Sump Pump , C3 C4 Splitter Reflux Pumps , Site supervision C3 C4 Splitter Reflux Pumps , HP BFW Pumps , Site supervision HP BFW Pumps , MP BFW Pumps , Site supervision MP BFW Pumps , Treated Raw Water Pumps , Site supervision Treated Raw Water Pumps , Service Water Pumps , Site supervision Service Water Pumps

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

24

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

22-05-2026 11:00:00

Pre-Bid Venue

Technip Energies India Limited, A - 4, Institutional Area, Block A, Sector 1, Noida, Uttar Pradesh 201301 OR Through teams meeting

Delivery Details

Max Delivery Days

396

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400074

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vikram Ramkumar Gupta400074,BPCL Mumbai Refinery, Admin building, South block, Second floor, CPO RPP, Mahul, Mumbai - 400074Mumbai SuburbanMaharashtra4000742396-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 17

GeM-Bidding-9340510.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 22 Items Sign in for GEM prices

#1

Rich Amine Feed Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#2

Site supervision Rich Amine Feed Pumps

Services for site supervision

12 man days Delivery: 1,125 days
#3

Amine Regenerator Reflux Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#4

Site supervision Amine Regenerator Reflux Pumps

Services for site supervision

12 man days Delivery: 1,125 days
#5

Amine Regenerator Bottom Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#6

Site supervision Amine Regenerator Bottom Pumps

Services for site supervision

12 man days Delivery: 1,125 days
#7

Lean Amine Pump 1

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#8

Site supervision Lean Amine Pump 1

Services for site supervision

12 man days Delivery: 1,125 days
#9

Amine Pump 2

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#10

Site supervision Amine Pump 2

Services for site supervision

12 man days Delivery: 1,125 days
#11

Anime Sump Pump

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#12

Site supervision Anime Sump Pump

Services for site supervision

12 man days Delivery: 1,125 days
#13

C3 C4 Splitter Reflux Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

3 nos Delivery: 396 days
#14

Site supervision C3 C4 Splitter Reflux Pumps

Services for site supervision

12 man days Delivery: 1,125 days
#15

HP BFW Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 12 Supervision Man days and GST

2 nos Delivery: 396 days
#16

Site supervision HP BFW Pumps

Services for site supervision

18 man days Delivery: 1,125 days
#17

MP BFW Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 12 Supervision Man days and GST

2 nos Delivery: 396 days
#18

Site supervision MP BFW Pumps

Services for site supervision

18 man days Delivery: 1,125 days
#19

Treated Raw Water Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#20

Site supervision Treated Raw Water Pumps

Services for site supervision

12 man days Delivery: 1,125 days
#21

Service Water Pumps

asper MR inclusive of Mandatory spares Freight charges Packing and Forwarding charges 8 Supervision Man days and GST

2 nos Delivery: 396 days
#22

Site supervision Service Water Pumps

Services for site supervision

12 man days Delivery: 1,125 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar pump systems and site supervision

4

Financial Statements (last 3 years)

5

EMD submission (₹25,00,000) in approved form

6

Technical Compliance Certificates and OEM Authorizations

7

Instructions To Bidders (ITB), Major Terms & Conditions (MTC), Special Purchase Conditions (SPC)

8

General Purchase Conditions (GPC) and GCC

9

Any other documents mandated in NIT and SPC

Corrigendum Updates

7 Updates
#1

Update

18-Jul-2026

Extended Deadline

24-Jul-2026, 2:00 pm

Opening Date

24-Jul-2026, 2:30 pm

#2

Update

10-Jul-2026

Extended Deadline

18-Jul-2026, 2:00 pm

Opening Date

18-Jul-2026, 2:30 pm

#3

Update

02-Jul-2026
#4

Update

02-Jul-2026

Extended Deadline

10-Jul-2026, 2:00 pm

Opening Date

10-Jul-2026, 2:30 pm

#5

Update

22-Jun-2026

Extended Deadline

06-Jul-2026, 2:00 pm

Opening Date

06-Jul-2026, 2:30 pm

#6

Update

08-Jun-2026

Extended Deadline

22-Jun-2026, 2:00 pm

Opening Date

22-Jun-2026, 2:30 pm

#7

Update

22-May-2026

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for Bharat Petroleum pumps tender in India 2026?

Bidders must meet Technical & Financial BQC criteria, submit EMD of ₹25,00,000, provide OEM authorizations, and upload ITB, MTC, SPC, GCC, and GPC documents. Ensure product scope includes all 22 pump items and site supervision as listed in BoQ.

What documents are required for Bharat Petroleum pump tender submission 2026?

Required documents include GST certificate, PAN, experience certificates for similar pumps, financial statements, EMD submission, technical compliance certificates, OEM authorizations, and all ATC documents (NIT, ITB, MTC, SPC, GCC, GPC).

What is the EMD for this GeM Bharat Petroleum tender 2026?

The EMD is ₹25,00,000 and is mandatory for all bids; bids with lower EMD will be rejected per ATC clause 3. Ensure payment as specified in GeM portal guidelines.

What delivery terms apply to the Bharat Petroleum pump contract 2026?

Delivery can be increased by up to 25% of quantity; the delivery period is calculated using the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What are the key pump types included in the BPCL tender 2026?

Key pump types include Rich Amine Feed Pumps, Amine Regenerator Reflux Pumps, Amine Regenerator Bottom Pumps, Lean Amine Pumps, Amine Sump Pumps, C3/C4 Splitter Reflux Pumps, HP/MP BFW Pumps, Treated Raw Water Pumps, and Service Water Pumps, plus required site supervision.

Which standards or OEM authorizations are required for BPCL tender 2026?

Submit OEM authorizations and any relevant certification bodies; ensure alignment with GCC/GPC and MTC/SPC as specified in ATC; ISI/ISO certifications may be required depending on item specifics.

When is the bid submission deadline for Bharat Petroleum pump tender 2026?

Deadline details are published on GeM; bidders should monitor the GeM NIT and ATC documents to confirm the last date, noting that deviations may be rejected if not aligned with ITB and SPC.

What is the scope of site supervision in the BPCL pump tender 2026?

Site supervision covers installation, commissioning, testing, and ongoing supervision for all 22 pump items; ensure manpower, safety, and QA/QC alignment with contract GPC/GCC requirements.