TenderDekho Logo
Active GEM

Invitation to Bid - Online Ups Modular Type in JAMNAGAR, GUJARAT

Bid Publish Date

16-Jul-2026, 12:43 pm

Bid End Date

27-Jul-2026, 1:00 pm

Value

₹1,13,447

Progress

Issue16-Jul-2026, 12:43 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 2

A tender has been published for Indian Air Force Online Ups Modular Type (Q3) in JAMNAGAR, GUJARAT. Quantity: 1 by. Submission Deadline: 27-07-2026 13: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Online Ups Modular Type (Q3)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

JAMNAGAR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JAMNAGARJAMNAGAR--130-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9615615.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Output power capacity including redundancy/Expandable (Rack facility) upto/Minimum backuptime (including redundancy) /Minimum VAH (VAH shall be calculated Battery voltage x Battery Ah x No. of batteries = Total VAH) 4KVA/8KVA/6 minutes/1080 VAH
GENERIC Noise level
INPUT In put Voltage Range 320 V to AC to 470 V AC 3 Phase
INPUT Input frequency range 50 +/-6% Hz
INPUT Distortion (current) < / = 3%
OUTPUT Output powr factor >/= 0.90
CONSTRUCTION Minimum thickness (in mm) of Rack Enclosure for Modular UPS duly powder coated others
CONSTRUCTION UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest IP20
CONSTRUCTION Total Harmonic Distrotion (THD) for 100% linear load < 3%
CONSTRUCTION Total Harmonic Distrotion (THD) for 100% non-linear load < 4%
CONSTRUCTION Over all efficiency on rated full load of 0.8 PF (min.) AC output >/=90%
CONSTRUCTION Inverter efficiency on rated full load of 0.8 PF (min.) AC output >/=95%
CONSTRUCTION UPS shall withstand Over load capacity - 125% (Output with mains AC-AC) for 5 Minutes (Minimum)
CONSTRUCTION UPS shall withstand Over load capacity - 125% (Output in battery run DC-AC) for 30 Seconds (Minimum)
BATTERY Battery type SMF VRLA, Modular Hot swappable Battery modules
BATTERY Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD 4 to 8 hours
BATTERY Batteries shall supply with With metal rack
WARRANTY AND SERVICES Warranty for Modular UPS (on site comprehensive warranty) (in years) others
WARRANTY AND SERVICES Warranty for battery (replacement warranty) (in years) others
WARRANTY AND SERVICES After sales and complaint service Within 7 days
WARRANTY AND SERVICES PAN India service support on 24 x 7 basis No
WARRANTY AND SERVICES AMC support available after 3 year warranty No
WARRANTY AND SERVICES Quarterly preventive maintenance No
WARRANTY AND SERVICES Manufacturer shall provide and support for installation, commissioning, spares, technical support all over India No
WARRANTY AND SERVICES Availability of spares in close proximity (Spares should be easily available close to the site) No
CERTIFICATIONS CE Certification and marking No
CERTIFICATIONS Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C,two cycles of (12+12) hours each 2007) No
CERTIFICATIONS Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs No
CERTIFICATIONS Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. No

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer