Bid Publish Date
07-Feb-2026, 7:50 am
Bid End Date
18-Feb-2026, 2:00 pm
Value
₹4,57,913
Location
Progress
Product/Service: Power supply extension works
Scope context: Hydrogen Hub Main Gate and Porta Cabin Area
Location: Hydrogen Hub site (NTPC Green Energy Limited) without city/state details
BOQ: 0 items; no quantitative scope provided
EMD/Estimated value: Not disclosed
Standards/Certifications: Not specified in data; ATC may define requirements
Delivery/Implementation: No explicit timeline; check ATC for schedule
Experience: No explicit years/turnover listed; refer to ATC for eligibility
EMD amount and payment terms not disclosed; verify in ATC
Delivery timeline and milestones to be confirmed via ATC
Documentation requirements to be verified in the ATC document
Not disclosed in data; bidders must consult ATC for payment schedule and milestones.
Not disclosed in data; refer to ATC for installation/extension timeline and site access constraints.
Not specified in provided data; confirm in ATC for LD rates and remedies.
No explicit eligibility criteria provided in data; refer to ATC for technical qualification and financial standing
Experience in electrical extension works for hydrogen infrastructure or similar facilities may be required in ATC
Compliance with NTPC Green Energy Limited internal standards and safety protocols as per ATC
| S.No | Seller | Date | Status |
|---|---|---|---|
| 1 | BHAVANI ENGINEERS AND CONTRACTORS Under PMA | 16-02-2026 20:13:34 | |
| 2 | M/S RBC Enterprises Under PMA | 18-02-2026 09:29:14 | |
| 3 | METWIN INTERNATIONAL PRIVATE LIMITED Under PMA | 16-02-2026 18:28:53 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | BHAVANI ENGINEERS AND CONTRACTORS | ||
| L2 | METWIN INTERNATIONAL PRIVATE LIMITED Under PMA | Item Categories : Custom Bid for Services - Power Supply Extension Works For Hydrogen Hub Main Gate And Porta Cabin A | |
| L3 | M/S RBC Enterprises Under PMA | Item Categories : Custom Bid for Services - Power Supply Extension Works For Hydrogen Hub Main Gate And Porta Cabin A |
Please sign in or create an account to view contract details and download result documents.
Sign in to view the result page.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
3 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - Power Supply Extension Works For Hydrogen Hub Main Gate And Porta Cabin Area
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
[]
Key insights about ANDHRA PRADESH tender market
Bidders should review the ATC uploaded by NTPC Green Energy Limited for the Hydrogen Hub project. Prepare documentation including company details, prior electrical extension experience, and financial statements. Submit within the bid portal as directed by the ATC; ensure compliance with internal NTPC safety standards and site access rules.
While the data snippet does not list exact documents, typical submissions include GST registration, PAN, company profile, experience certificates for power extension works, financial statements, EMD submission, and OEM authorizations if applicable. Verify the ATC for the definitive bidder submission checklist.
The tender data shows no explicit technical specs. Expect the ATC to define scope details such as cable sizing, protection schemes, and interface with main gate systems. Bidders should await ATC guidance and align proposals with standard electrical codes and NTPC safety requirements.
The provided data does not specify a deadline. The ATC should include delivery milestones and site access constraints. Bidders must study ATC to formulate a realistic implementation plan and allocate resources accordingly.
EMD details are not disclosed in the shared data. Bidders should refer to the ATC for the exact amount or percentage, acceptable payment mode, and submission timeline to ensure compliant bid submission.
Review the ATC for safety and site-specific requirements. Ensure personnel qualifications, PPE, and method statements meet NTPC internal standards. Include safety certifications and prior impact assessments in your bid to demonstrate site-readiness.
The scope is described as power supply extension works for the main gate area, likely involving external electrical supply, cabling, and connection to gateway infrastructure. Exact interfaces and cable routes will be clarified in the ATC; bidders should plan accordingly.
Standards are not listed in the data; ATC is expected to specify. Prepare to present IS/IEC electrical standards, safety certifications, and any NTPC-specific internal QA requirements as per ATC guidance.