Central Railway Self-Contained Drinking Water Cooler Tender IS 1475 V3 2025 Rajasthan/India
Central Railway
THANE, MAHARASHTRA
Menu
Bid Publish Date
16-Dec-2025, 5:50 pm
Bid End Date
29-Dec-2025, 6:00 pm
Progress
Quantity
5
Bid Type
Two Packet Bid
The Commissionerate Of Technical Education under the Gujarat Education Department invites bids for Self-Contained Drinking Water Coolers (V3) compliant with IS 1475 (Q2). The procurement scope is defined at the organization level, with the award contingent on price competitiveness, delivery capacity, and compliance with specified terms. The tender allows quantity fluctuation up to 25% of the bid quantity at contract award and during the contract period, at contracted rates. A key differentiator is the option-based delivery schedule tied to the original delivery period, with a minimum extension of 30 days. The project emphasizes post-award service support and warranty obligations, including center availability and penalty provisions. This opportunity targets suppliers capable of nationwide support, with emphasis on IS 1475 compliance and reliable service infrastructure.
Product: self-contained drinking water cooler (V3)
Standard: IS 1475 (Q2) compliant
Delivery: baseline delivery period tied to original order; extended period governed by option clause
Service: dedicated toll-free support; functional service centre in each consignee state; 30 days to establish
Warranty: service/rectification within 3 days; 0.5% weekly penalty; 10% contract value cap on penalties
Quantity variation up to 25% of bid/contract quantity
IS 1475 (Q2) compliance for all units
3-day warranty service window with weekly penalties
Purchaser may increase/decrease quantity by up to 25% at contracted rates during and after original procurement; delivery extension formula applies with minimum 30 days
Bidder/OEM must have functional service centres in every consignee state's location; if absent, establish within 30 days of award; payment contingent on evidence of centre
Rectification within 3 days; 0.5% unit price penalty per week of delay; cumulative cap 10% of total contract value; non-compliant service may trigger alternate sourcing
Experience in supplying IS 1475 compliant water coolers or comparable lifesaving equipment
Evidence of turnover and financial stability suitable for government procurement
Capability to establish or demonstrate nationwide service centres within 30 days of award
Central Railway
THANE, MAHARASHTRA
Madhya Pradesh State Agricultural Marketing Board (mpsamb) - Mandi Board
UJJAIN, MADHYA PRADESH
University Library Veer Narmad South Gujarat University
SURAT, GUJARAT
Lic - Life Insurance Corporation Of India
UDAIPUR, RAJASTHAN
Eastern Railway
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar IS 1475 drinking water cooler supply
Financial statements or turnover proof as required by terms
EMD documents (as specified by ATC or bid terms)
Technical bid documents demonstrating IS 1475 (Q2) compliance
OEM authorizations or approvals (if applicable)
Bidders must meet eligibility criteria, submit GST and PAN, provide IS 1475 (Q2) compliant product details, and include OEM authorizations and service capability proofs. Ensure 25% quantity variation readiness and evidence of state-wide service centers; provide EMD as specified and comply with ATC terms.
Required documents include GST certificate, PAN, experience certificates for IS 1475 products, financial statements, EMD proof, technical bid documents, and OEM authorizations. Additional state-specific service centre proofs may be needed, along with warranty support plans.
Key spec: Self-contained water coolers (V3) conforming to IS 1475 (Q2). No further numeric specs provided in data; focus on compliance, durable construction, and reliability; ensure warranty and service commitments meet the 3-day rectification requirement.
Delivery follows the last date of the original delivery order; option clause allows quantity variation up to 25% during contract and currency, with extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Penalties apply at 0.5% of unit price per week of delay, up to a cumulative cap of 10% of total contract value; after cap, the buyer may procure from alternate sources and recover costs from the PBG.
Yes. Bidders must have functional service centres in each consignee state; if not existing, establish within 30 days of award; payment will be released only after documentary evidence of functional centre submission.
Submit product literature, conformity certificates, and supplier declarations showing IS 1475 (Q2) compliance; include warranty terms, service commitments, and any OEM authorizations proving adherence to the standard.
The purchaser may increase or decrease quantity by up to 25% of bid quantity at the time of contract placement and during contract currency; extended delivery period applies with the calculated time formula and minimum 30 days.
Rural Development Department
📍 SAMASTIPUR, BIHAR
N/a
N/a
📍 AZAMGARH, UTTAR PRADESH
National Institute Of Technology (nit)
📍 JAIPUR, RAJASTHAN
N/a
📍 VADODARA, GUJARAT
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Choose from flexible plans to access tender documents instantly
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS