TenderDekho Logo
Active GEM

Urban Development Department Uttar Pradesh Decorative Lightning Pole (V2) Tender Etawah UP 2026

Bid Publish Date

09-Sep-2026, 6:56 pm

Bid End Date

19-Sep-2026, 7:00 pm

EMD

₹4,09,170

Value

₹1,36,39,000

Progress

Issue09-Sep-2026, 6:56 pm
AwardPending

Key Highlights

  • Explicit OEM authorization required for products procured via authorised distributors
  • Full EPC scope: supply, installation, testing, commissioning of decorative lighting poles
  • Mandatory in-state service centers or 30-day Centre establishment post award
  • EMD set at ₹409,170 and total estimated value ₹13,639,000

Tender Overview

Theoden: The Urban Development Department, Uttar Pradesh, is inviting bids for the supply, installation, testing and commissioning of Decorative Lightning Poles (V2) in Etawah, Uttar Pradesh (206001). Estimated contract value is ₹13,639,000 with an earnest money deposit of ₹409,170. Bidders must submit a Data Sheet matching product specifications, and OEM authorization if using authorized distributors. The scope includes full project execution from supply to commissioning, with mandatory turnover proof for bidders and OEMs. Service centers in the state are required for carry-in warranty, or establishment within 30 days of award. This tender emphasizes compliance with OEM data, turn-over thresholds, and post-sale service readiness, with zero tolerance for technical mismatch.

Technical Specifications & Requirements

  • Product: Decorative Lightning Pole (V2) (Q3 category) with scope for supply, installation, testing and commissioning.
  • Data requirements: Data Sheet uploaded alongside bid; ensure alignment with product specifications to avoid rejection.
  • Authorisation: Manufacturer Authorization required for OEM or authorised distributors, including full details (name, designation, address, email, phone).
  • Value & scope: Estimated value ₹13,639,000; bid price must cover all costs (supply, installation, testing, commissioning).
  • Service capability: Functional Service Centre in the State of each consignee location for carry-in warranty; if not present, establish within 30 days of award.
  • Turnover: Minimum average annual turnover for bidder and OEM over last 3 years as per bid document; audited balance sheets or CA certificate to be uploaded.
  • BOQ: No items listed; interpret as itemized scope aligned with decorative pole deployment and installation.

Terms, Conditions & Eligibility

  • EMD: ₹409,170; ensure submission with bid as per terms.
  • Financial standing: Bidder must not be in liquidation or similar proceedings and must upload an undertaking.
  • Data Sheet integrity: Any mismatch may lead to bid rejection; attach data sheet with bid.
  • Turnover criteria: Bidder and OEM turnover thresholds specified in the bid document; document with audited statements or CA certificate.
  • Service readiness: Establish or demonstrate existing service centers within the state; payment release contingent on evidence of service capability.
  • Warranty/maintenance: On-site or carry-in warranty terms to be clarified; service center availability required for timely support.

Key Specifications

  • Product/service: Decorative Lightning Pole (V2) - Q3

  • Scope: Supply, Installation, Testing and Commissioning

  • EMD: ₹409,170

  • Estimated contract value: ₹13,639,000

  • Service centres: must exist in-state or be established within 30 days

  • Data Sheet: mandatory with bid; must align with product parameters

  • OEM authorization: required for distributors; include full contact details

Terms & Conditions

  • EMD must be submitted: ₹409,170

  • Turnover criteria: last 3 years; audited or CA certificate

  • Service Centre requirement: state-wide or establishment within 30 days

  • Data Sheet alignment: mandatory, mismatch leads to rejection

  • Authorization: OEM/Manufacturer authorization required for distributors

Important Clauses

Payment Terms

Payment details are contingent on delivery milestones and service capability; ensure alignment with service center proof and post-installation support.

Delivery Schedule

Not explicitly specified; bid must cover supply to installation to commissioning timeline as per contract.

Penalties/Liquidated Damages

LD terms not disclosed; rely on standard government tender penalties for delays and non-conformance.

Bidder Eligibility

  • Not under liquidation or similar proceedings with undertaking

  • Compliance with turnover criteria for bidder and OEM over last 3 financial years

  • Functional Service Centre establishment in UP or demonstrable plan within 30 days

Tender Data

Bid Details

Quantity

150

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

68

OEM Avg. Turnover

545

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Decorative Lightning Pole (V2) (Q3)

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Etawah

Delivery Pincodes

206001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Natthi Lal206001,NAGAR PALIKA PARISHAD ETAWAHEtawahUttar Pradesh206001150120-

Authority Records

URBAN DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9848573.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Nagar Palika Parishad Etawah

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Bidder undertaking on non-liquidation status

2

Data Sheet of offered product(s) uploaded with bid

3

Manufacturer Authorization form/certificate with OEM distributor details

4

Audited Balance Sheets or CA certificate indicating last 3 years’ turnover (bidder and OEM)

5

Evidence of Functional Service Centre in the state or plan to establish within 30 days

6

GST certificate and PAN card

7

Experience certificates and financial statements as requested in terms

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to participate in UP decorative lighting pole tender in Etawah 2026

Bidders must ensure non-liquidation status, submit a Data Sheet matching product specs, and provide Manufacturer Authorization for OEM/distributor. Include turnover documentation for last 3 financial years, submit an EMD of ₹409,170, and demonstrate a functional service centre in UP or establish one within 30 days of award. Follow bid submission guidelines precisely.

What documents are required for the decorative pole bid in Etawah UP

Required documents include: bidder undertaking, Data Sheet, OEM authorization, audited turnover or CA certificate for bidder and OEM, evidence of in-state service centre, GST certificate, PAN, and relevant experience certificates. Ensure all documents are uploaded with the bid to avoid rejection.

What are the technical specifications for Decorative Lighting Pole V2 in UP tender

No explicit technical specs are published here; the bid requires a Data Sheet aligned with product parameters. Ensure the Data Sheet reflects V2 pole capacities, mounting options, durability under UP climate, and compliance with any referenced IS/standards in the Data Sheet.

What is the EMD amount for the UP decorative pole procurement Etawah 2026

The EMD amount is ₹409,170. Submit via the prescribed method in the tender with the data sheet and manufacturer authorization. EMD is a prerequisite to participate and may be retained if the bid is non-compliant or withdrawn late.

What is the delivery and installation requirement for UP pole contract

The scope includes Supply, Installation, Testing and Commissioning. While explicit delivery timelines are not stated, bidders must ensure robust logistics and readiness for on-site installation and commissioning across Etawah within the contract framework, supported by service centers in UP.

How is turnover verified for bidders and OEMs in this UP tender

Turnover must be demonstrated via audited balance sheets or CA certificates covering the last 3 financial years ending 31st March prior to bidding. If the bidder or OEM is under 3 years since incorporation, use turnover for completed years post-incorporation.

What happens if the Data Sheet mismatches the product specification

Mismatches between the Data Sheet and actual product specs can lead to bid rejection. Ensure the Data Sheet is accurately aligned with the offered product, including model, capacity, and warranty terms, and cross-verify with OEM documentation.