Progress
Indian Army invites bids for Laptop procurement in Ambala, Haryana. The contract contemplates delivery to multiple on-site locations, with a potential quantity variation of up to 25% of the bid quantity and contract quantities at existing rates. The buyer requires Detailed Design Drawings approval within 5 days of award, followed by modification lists within 7 days. Delivery and installation occur at the specified Army address, with flexibility to adjust schedules if drawings approval is delayed. This opportunity targets suppliers with compliant hardware stacks and robust fabrication readiness, under a structured option regime.
Product: Laptop under defence procurement
Delivery location: 10 Sikh Light Infantry, Ambala, Haryana
Quantity flexibility: up to 25% increase during contract; extended delivery time provisions
Design process: Detailed Design Drawings to be approved within 5 days; modification list within 7 days
GST handling: Bidder bears GST; reimbursement as actuals or quoted rate whichever is lower
Pre-qualification: no liquidation or bankruptcy; 7+ years residual market life for offered products
Bid documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate; vendor code creation
BOQ: No items listed; no explicit BOM data available
Quantity variation up to 25% with corresponding delivery time adjustment
Mandatory Detailed Design Drawings submission within 5 days of award
Delivery and installation at 10 Sikh Light Infantry, Ambala
GST to be borne by bidder; reimbursement as actuals or as per quoted rate
Bidder must provide PAN, GSTIN, cancelled cheque and EFT mandate
No liquidation or bankruptcy; bid undertakings required
GST reimbursement as actuals or as per applicable rate, whichever is lower; no explicit upfront payment data provided
Delivery period tied to original delivery order; option clause may extend duration with minimum 30 days; delay in drawing approval can shift delivery without LD
Not specified in available data; must be confirmed in final T&C
Not under liquidation, court receivership or similar proceedings
Offer products with at least 7 years residual market life
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and vendor code documentation
Quantity
2
Category
Laptop
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
3
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Laptop
Pre-Bid Date
07-09-2026 12:00:00
Pre-Bid Venue
Shakti Hall, 10 SIKH LI
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about HARYANA tender market
Bidders must ensure they meet eligibility criteria (no liquidation, 7+ years product life), submit PAN, GSTIN, cancelled cheque, EFT mandate, and provide OEM authorizations if required. Include Detailed Design Drawings within 5 days of award and respond with modifications within 7 days. Ensure GST handling aligns with actuals or quoted rate.
Required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by the bank. Additional documents such as experience certificates and technical bid may be needed. Ensure authenticity and clear bank account details for EFT setup.
Delivery and installation, if in scope, occur at the specified address in Ambala. The option clause allows up to 25% quantity variation with adjusted delivery time, calculated as per the formula with a minimum 30 days.
Products must have at least 7 years residual market life and should not be declared end-of-life by the OEM before that period. Exact standards (e.g., IS or MIL specs) are not specified in the available data and require confirmation during final bid.
Bidder bears GST; reimbursement will be as actuals or as per applicable rates, whichever is lower, up to the quoted GST percentage. Ensure accurate GST calculations and compliance in the bid submission.
Submit Detailed Design Drawings within 5 days of award; the Buyer will approve or provide a complete modification list within 7 days. If delayed, delivery period may shift without liquidated damages for the delay caused by approval time.
EMD details are not provided in the available data. Bidders should assume standard EMD practices apply and verify exact amount and mode (DD/bank transfer) in the final tender documentation.
If the original period is under 30 days, the extended delivery time equals the original period. For longer original periods, the extension follows the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days.