TenderDekho Logo
GEM

Gondia District Panchayats On Grid Solar Inverter Tender Maharashtra 2025 - ISI/IS 550 Compliant Equipment Supply

Bid Publish Date

12-Nov-2025, 4:38 pm

Bid End Date

22-Nov-2025, 5:00 pm

Progress

Issue12-Nov-2025, 4:38 pm
Technical22-11-2025 16:26:14
Financial
Award11-Dec-2025, 2:24 am
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Key Highlights

  • Critical requirement: Turnkey SITC (Supply, Installation, Testing, Commissioning) of On Grid Solar Inverter
  • Right to accept or reject bids wholly or partly at Purchaser’s discretion without compensation
  • 25% quantity variation provision at bid and during contract currency with specified delivery logic
  • Dedicated toll-free service support line required (3/7 availability) for post-sale support
  • Past performance deemed decisive; poor performance history may disqualify bidders
  • Certificates and documents must be uploaded as per Bid Document and ATC
  • No BOQ items listed; focus is on complete SITC delivery and compliance with certificates
  • Penalties for frivolous complaints or canvassing; potential debarment up to 2 years

Categories 14

Tender Overview

The procurement is issued by the Gondia District Panchayats under the Department Of Panchayati Raj for an On Grid Solar Inverter solution located in Gondia, Maharashtra 441601. The scope encompasses supply, installation, testing, and commissioning of the solar inverter system, with implied installation and service responsibilities. The tender includes a flexible quantity clause allowing up to 25% variation in order quantity and an adjustable delivery timeline based on the extended period, with a minimum extension of 30 days. The ATC terms require bidders to adhere to all uploaded certificates and provide dedicated service support contact numbers. A right-of-acceptance clause reserves sole discretion for awarding the contract. Unique emphasis on compliance, post-award support, and a robust evaluation against past performance is evident. This tender targets suppliers capable of turnkey solar inverter deployment in the district’s public infrastructure context. Key differentiator lies in the combination of supply, installation, testing, commissioning, and ongoing service commitments under a single contract.

Technical Specifications & Requirements

  • Scope of Supply: Supply, Installation, Testing and Commissioning (SITC) of solar inverter equipment
  • Service & Support: Dedicated/toll-free service support number required (3 / 7 availability)
  • ATC Clauses: Right to accept/reject bids at sole discretion; penalties for frivolous complaints and rigging are possible
  • Certification: Upload of required certificates/documents as per Bid document/ATC; non-compliance may lead to rejection
  • Delivery Basis: Delivery period linked to last date of original delivery order; extended time calculations apply with a minimum 30 days
  • Right of Acceptance: Purchaser may accept whole/part quantities with no compensation claims
  • Quality/Past Performance: Past performance deemed critical in evaluation; non-satisfactory history may lead to rejection
  • Brand/OEM: Any branding requirements or OEM authorizations are implied through certificates and terms
  • OEM/Manufacturer Documentation: Ensure all technical compliance documents accompany the bid
  • Geographic Context: Tender is localized to Gondia district infrastructure needs

Terms, Conditions & Eligibility

  • EMD/Financials: Not explicitly specified in the data; bidders should verify bid document for specific deposit details
  • Delivery Timeline: Delivery period tied to last date of original delivery order; extension calculations apply with minimum 30 days
  • Payment Terms: Not explicitly stated; terms to be confirmed in the contract and bid documents
  • Experience: Past performance referenced as critical; ensure demonstration of prior SITC solar inverter projects
  • Documents: Upload all certificates/documents sought in Bid document/ATC; non-compliance risks rejection
  • Scope Clause: Bid price must cover SITC; ensure cost includes all components as per Scope of Supply
  • Disqualification Triggers: Frivolous complaints or canvassing can lead to debarment up to 2 years
  • Warranty/Support: Service support expectations implied; verify post-auction warranty terms in final contract

Key Specifications

  • Product/service names: On Grid Solar Inverter system with SITC scope

  • Quantities: Not specified in data; quantity variation up to 25% permitted

  • EMD/Value: Not specified in provided data; verify in bid document

  • Experience: Past performance demanded; relevant solar SITC projects preferred

  • Quality/Standards: ISI/ISO conformity not explicitly listed; confirm in final bid documents

  • Delivery: Linked to last date of original delivery order; extended time formula applies

Terms & Conditions

  • Delivery quantity may increase up to 25% during contract with minimum 30-day extension

  • SITC scope included; certificates must be uploaded; service support must have toll-free line

  • Right of acceptance/rejection at sole discretion; past performance evaluated

Important Clauses

Payment Terms

Not explicitly stated in tender data; verify in final contract terms

Delivery Schedule

Delivery period begins from last date of original delivery order; extension calculations apply with minimum 30 days

Penalties/Liquidated Damages

Not explicitly detailed; ATC references potential penalties for frivolous complaints or misconduct

Bidder Eligibility

  • Experience in SITC solar inverter installations or related turnkey solar projects

  • Financial capacity demonstrated by recent statements

  • Compliance with bid document certificates and OEM authorizations

Documents 3

GeM-Bidding-8554456.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

On Grid Solar Inverter

Gondia District Panchayats

GONDIA, MAHARASHTRA

Posted: 4 April 2025
Closed: 14 April 2025
GEM

On Grid Solar Inverter

N/a

BHANDARA, MAHARASHTRA

Posted: 10 February 2025
Closed: 20 February 2025
GEM

On Grid Solar Inverter

Gondia District Panchayats

GONDIA, MAHARASHTRA

Posted: 15 February 2025
Closed: 25 February 2025
GEM

On Grid Solar Inverter

Nashik District Panchayats

NASHIK, MAHARASHTRA

Posted: 13 June 2025
Closed: 2 July 2025
GEM

On Grid Solar Inverter

N/a

GONDIA, MAHARASHTRA

Posted: 11 December 2024
Closed: 21 December 2024
GEM

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for SITC solar inverter projects

4

Financial statements (last 2-3 years) demonstrating stability

5

EMD documents as per bid document (amount/percentage to be confirmed)

6

Technical bid documents and conformity certificates

7

OEM authorization/authorizations for solar inverter equipment

8

Certification documents uploaded as per ATC and Corrigendum (if any)

Technical Results

S.No Seller Item Date Status
1D R ENTERPRISES   Under PMAMake : NA Model : 3KW SINGLE PHASE22-11-2025 16:26:14Qualified
2KALPADRUMA   Under PMAMake : LOOM SOLAR Model : On Grid Solar Inverter20-11-2025 13:12:29Disqualified
3LAKISHA ENTERPRISES   Under PMAMake : NA Model : 3KW SINGLE PHASE22-11-2025 16:19:10Qualified
4LOOM SOLAR PRIVATE LIMITED   Under PMAMake : LOOM SOLAR Model : On Grid Solar Inverter20-11-2025 17:26:24Disqualified
5NIRVAHANA VENTURES LLP   Under PMAMake : NA Model : 5 KW SINGLE PHASE22-11-2025 15:54:02Disqualified
6SHREE COMPUTER & ENTERPRISES   Under PMAMake : NA Model : 3KW SINGLE PHASE22-11-2025 16:29:02Qualified

Financial Results

Rank Seller Price Item
L1LAKISHA ENTERPRISES   Under PMA₹36,000Item Categories : On Grid Solar Inverter
L2D R ENTERPRISES   Under PMA₹36,400Item Categories : On Grid Solar Inverter
L3SHREE COMPUTER & ENTERPRISES   Under PMA₹36,600Item Categories : On Grid Solar Inverter

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on the Gondia solar inverter tender in Maharashtra 2025?

Bidders should submit SITC bids for the On Grid Solar Inverter with full installation and commissioning. Ensure all required certificates are uploaded, include OEM authorizations, provide past solar SITC experience, and supply dedicated service contact details. Verify delivery extension rules (25% quantity variation) and submission of EMD as per bid document.

What documents are required for the Gondia inverter tender submission?

Submit GST certificate, PAN card, 2-3 years of financial statements, past SITC project certificates, OEM authorization letters, technical bid documents, and all certificates requested in ATC. Ensure certificates are uploaded along with bid to avoid rejection.

What are the delivery terms for the Gondia solar SITC tender?

Delivery begins from the last date of the original delivery order. If the option clause increases quantity, the extended delivery time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; the purchaser may extend further within the original period.

What is the required service support for bidders in Gondia tender?

Bidders must provide a dedicated toll-free service support line (3/7 availability). This ensures 24/7 assistance for SITC solar inverter deployments and post-installation support as part of contract compliance.

What past performance criteria affect eligibility for Gondia tender?

Past performance is critical; bidders with unsatisfactory prior solar SITC outcomes may be rejected. Provide verifiable project references showing successful supply, installation, testing, and commissioning of solar inverter systems.

Are there any penalties for bid irregularities in Gondia tender?

Yes. The buyer may debar bidders for frivolous or malicious complaints for up to 2 years. Ensure all claims are factual, with robust documentation, and avoid canvassing or influence attempts during bidding.

What is the scope of supply for the Gondia inverter tender’s SITC?

Scope includes Supply, Installation, Testing and Commissioning of On Grid Solar Inverter equipment. The price should cover all components and services; verify inclusion of installation hardware, cables, mounting structures, and commissioning tests per project requirements.

What standards or certifications are likely needed for this tender?

The tender requires uploaded certificates per ATC; while ISI/ISO specifics aren’t listed, bidders should prepare conformity certificates, OEM authorizations, and any ISI/IS standards documentation requested in the final bid package.