TenderDekho Logo
Closed GEM

Bids are Invited For ED6061D-46014B02000,ED6061D-46014C04000,ED6061D-487238,ED6061D-487246,ED6061D-488192,ED6061D-488193 in UTTARA KANNADA, KARNATAKA

Bid Publish Date

10-Apr-2025, 5:22 pm

Bid End Date

10-Jun-2025, 2:00 pm

Generate Docs

Progress

Issue10-Apr-2025, 5:22 pm
Technical06-Feb-2025, 8:56 am
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

1516

Category

ED6061D-46014B02000

Bid Type

Two Packet Bid

Categories 32

A tender has been published for Indian Navy ED6061D-46014B02000, ED6061D-46014C04000, ED6061D-487238, ED6061D-487246, ED6061D-488192, ED6061D-488193 in UTTARA KANNADA, KARNATAKA. Quantity: 1516 by. Submission Deadline: 10-06-2025 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN NAVY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7558197.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 157 Items Sign in for GEM prices

#1

ED6061D-46014B02000

O-RING 5330BB 20X2.65-20A8

41 pieces Delivery: 180 days
#2

ED6061D-46014C04000

O-RING 5330BB 40X3,55-20A8

7 pieces Delivery: 180 days
#3

ED6061D-487238

LANTERN SEAL

5 pieces Delivery: 180 days
#4

ED6061D-487246

LOCK WASHER

3 pieces Delivery: 180 days
#5

ED6061D-488192

FLAT SEAL

1 pieces Delivery: 180 days
#6

ED6061D-488193

FLAT SEAL

1 pieces Delivery: 180 days
#7

ED6061D-524-513

LEV.PROCESS.MODULE

1 pieces Delivery: 180 days
#8

ED6061D-524-514

PROCESSING MODULE

3 pieces Delivery: 180 days
#9

ED6061D-5310JJ-DN10

LOCK WASHER DN10

38 pieces Delivery: 180 days
#10

ED6061D-5310JJ-DN24

LOCK WASHER DN24

23 pieces Delivery: 180 days
#11

ED6061D-5310MDRONDNL14AC

STEEL SAFETY WASHER DE14

160 pieces Delivery: 180 days
#12

ED6061D-E25112B140M70QLAT

SCREW HM14X70X34

12 pieces Delivery: 180 days
#13

ED6061D-E27487-80-100UET

COTTER PIN 8X100

2 pieces Delivery: 180 days
#14

ED6061D-E27489E100-100AXT

SPRING PIN E10X100

3 pieces Delivery: 180 days
#15

ED6061D-EJ353-0-3

SEAL UI 480-528X22

1 pieces Delivery: 180 days
#16

ED6061D-GSM124-001A540

LIP SEAL DIA.540

3 pieces Delivery: 180 days
#17

ED6061D-GSM141-003F4DN6-2

STAINLESS STEEL LOCK TAB WASHER DN6

20 pieces Delivery: 180 days
#18

ED6061D-GSM141-03-F4-INDN4

STAINLESS STEEL LOCK TAB WASHER DN4

8 pieces Delivery: 180 days
#19

ED6061D-WB699G60808ADNL

O-RING

7 pieces Delivery: 180 days
#20

ED6061D-WD699G55766ADNA

O-RING 557,66X6.99

2 pieces Delivery: 180 days
#21

ED6061D-E25755A80-32CAS

THREADED CYLINDRICAL PIN

3 pieces Delivery: 180 days
#22

ED6061D-E27614C12-24ZTTPA

STAINLESS STEEL LOCK TAB WASHER DN12

15 pieces Delivery: 180 days
#23

ED6061D-E27614C14-28ZTTPA

STAINLESS STEEL LOCK TAB WASHER DN14

30 pieces Delivery: 180 days
#24

ED6061D-E27614C16-32CAT

STAINLESS STEEL LOCK TAB WASHER DN16

11 pieces Delivery: 180 days
#25

ED6061D-ENISO2009-M6X25-A4L-80

SCREW F-90 M6X25X22 SS A4 B197

18 pieces Delivery: 180 days
#26

ED6061D-ISO2009-M4X12-A4L-80

SCREW FS-90 M4X12 SS A4-80

3 pieces Delivery: 180 days
#27

ED6061D-MAT658-0066

POSITION SENSOR

5 pieces Delivery: 180 days
#28

ED6061D-SNLIM10

STAINLESS STEEL LOCK WASHER DE10

24 pieces Delivery: 180 days
#29

ED6061D-STF33-02 R004EDN18INOX

ND 18 PLAIN WASHER, STAINLESS STEEL

6 pieces Delivery: 180 days
#30

ED6061D-STF330702 034EDE10-20

RUCH SEAL PLAN ND6 OD10,2 MADE OF RUBBER

12 pieces Delivery: 180 days
#31

ED6061D-WB270G01690ADNL

O-RING 16,9X2,7

15 pieces Delivery: 180 days
#32

ED6061D-WB360G03730ADNL

O-RING 37,3X3,6

3 pieces Delivery: 180 days
#33

ED6061D-WB699G13589ADNL

O-RING135,89X6,99

8 pieces Delivery: 180 days
#34

ED6061D-ENISO4032-M12-8-A2C

NUT H M 12 CL8-8

76 pieces Delivery: 180 days
#35

ED6061D-85227-B

PORE-TYPE FILTER

10 pieces Delivery: 180 days
#36

ED6061D-M513-0152-F8

SEAL

10 pieces Delivery: 180 days
#37

ED6061D-STF-33-07-02-019E-8X1

O-RING 8,90X1,90 20A8-GN

1 pieces Delivery: 180 days
#38

ED6061D-STF33-07-02-019E-10

O-RING 10,50X2,70 20A8-GN

48 pieces Delivery: 180 days
#39

ED6061D-STF33-07-02-019E-16

O-RING 16,90X2,70 20A8-GN

18 pieces Delivery: 180 days
#40

ED6061D-STF33-07-02-019E-7

O-RING 7,20X1,90 20A8-GN

6 pieces Delivery: 180 days
#41

ED6061D-E27411A120QKVT

NUT H M 12 Z6CND17-04-01

24 pieces Delivery: 180 days
#42

ED6061D-99-XX-10

COIL

1 pieces Delivery: 180 days
#43

ED6061D-BASI00031

AUXILIARY SHELL

1 pieces Delivery: 180 days
#44

ED6061D-BNOR00081

OKBD 50 SLEEVE

1 pieces Delivery: 180 days
#45

ED6061D-GAXB00176

SPLIT LIP SEAL

3 pieces Delivery: 180 days
#46

ED6061D-HBAB00007

DUPLEX PT100 SENSOR

2 pieces Delivery: 180 days
#47

ED6061D-23201AM0060T

EXTERNAL RETAINING RING 6X0.7 E22163

2 pieces Delivery: 180 days
#48

ED6061D-46014E24300

O-RING 243X7 20A8

2 pieces Delivery: 180 days
#49

ED6061D-A03037-10-4020P025

PREFORMED GASKET

2 pieces Delivery: 180 days
#50

ED6061D-E25513B40URA

ALUMINIUM BRONZE WASHER M 4 U

2 pieces Delivery: 180 days
#51

ED6061D-E25762A30-24EESL

RIBBED PIN G5 3X24 STEEL

4 pieces Delivery: 180 days
#52

ED6061D-S55403-1800-109

DOUNLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#53

ED6061D-T47501EAA01120ADNL

O-RING 20A8 11.2X1.8

3 pieces Delivery: 180 days
#54

ED6061D-T47501EDD08250ADNL

O-RING 82.5X5.3 20A8

3 pieces Delivery: 180 days
#55

ED6061D-WB700G12002ACNL

O-RING 20A7 120.02X7

2 pieces Delivery: 180 days
#56

ED6061D-WB700G18352ACNL

O-RING 20A7 183.52X7

2 pieces Delivery: 180 days
#57

ED6061D-GP6901050-T51

PISTON GUIDING RING

2 pieces Delivery: 180 days
#58

ED6061D-GP7301350-T51

PISTON GUIDING RING

2 pieces Delivery: 180 days
#59

ED6061D-GP7301700-T51

PISTON GUIDING RING

2 pieces Delivery: 180 days
#60

ED6061D-GP7301900-T51

PISTON GUIDING RING

2 pieces Delivery: 180 days
#61

ED6061D-GP7302200-T51

PISTON GUIDING RING

2 pieces Delivery: 180 days
#62

ED6061D-GR690700-T51

GUIDING RING

2 pieces Delivery: 180 days
#63

ED6061D-GR7301500-T51

GUIDING RING

2 pieces Delivery: 180 days
#64

ED6061D-GR7301800-T51

GUIDING RING

2 pieces Delivery: 180 days
#65

ED6061D-GR7302100-T51

GUIDING RING

4 pieces Delivery: 180 days
#66

ED6061D-PDM401060-T24

DOUBLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#67

ED6061D-PDM401360-T24

DOUBLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#68

ED6061D-PDM402220-T24

DOUBLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#69

ED6061D-RE16MS2

SEAL RE16MS2 JUPITER

2 pieces Delivery: 180 days
#70

ED6061D-S55403-0700-109

DOUBLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#71

ED6061D-S55403-1200-109

DOUBLE DELTA TURCITE RING

13 pieces Delivery: 180 days
#72

ED6061D-S55403-1500-109

DOUNLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#73

ED6061D-S55403-2100-109

DOUBLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#74

ED6061D-S55404-1650-109

DOUBLE DELTA TURCITE RING

2 pieces Delivery: 180 days
#75

ED6061D-T47501EAA00515ADNL

O-RIN 20A8 5.15X1.8

2 pieces Delivery: 180 days
#76

ED6061D-T47501EDD04620ADNL

O-RING 20A8 46.2X5.3

3 pieces Delivery: 180 days
#77

ED6061D-T47501EDD05800ADNL

O-RING 20A8 58X5.3

2 pieces Delivery: 180 days
#78

ED6061D-T47501EEE25800ADNL

O-RING 258X7 20A8

2 pieces Delivery: 180 days
#79

ED6061D-WB180G09300ADNL

O-RING 93X1.8 20A8

3 pieces Delivery: 180 days
#80

ED6061D-WB533G07239ACNL

O-RING 72.39X5.33 20A7

2 pieces Delivery: 180 days
#81

ED6061D-WB533G09464ACNL

O-RING 20A7 94.64X 5.33

2 pieces Delivery: 180 days
#82

ED6061D-WB699G12319ACNL

O-RING 20A7 123.19X 6.99

2 pieces Delivery: 180 days
#83

ED6061D-WB699G14859ACNL

O-RING 148,59X6,99 20A7

2 pieces Delivery: 180 days
#84

ED6061D-WB699G15177ACNL

O-RING 20A7 151.77X 6.99

2 pieces Delivery: 180 days
#85

ED6061D-WB699G17717ACNL

O-RING 20A7 177.17X6.99

2 pieces Delivery: 180 days
#86

ED6061D-WB699G20257ACNL

O-RING 20A7 202.57X6.99

2 pieces Delivery: 180 days
#87

ED6061D-WB700G21527ACNL

O-RING 20A7 215.27X7

2 pieces Delivery: 180 days
#88

ED6061D-ENISO4017-M10X35-A4L-80

SCREW H M10X35X35 A4L-80

24 pieces Delivery: 180 days
#89

ED6061D-ENISO4017-M16X50-A4L-80

SCREW H M16X50X50 A4-70 B197

30 pieces Delivery: 180 days
#90

ED6061D-MAT164-0315F2

CAPACITY SCREW SS 13,72

2 pieces Delivery: 180 days
#91

ED6061D-MAT164-0315F4

CAPACITY SCREW RUCH DE 21.34

9 pieces Delivery: 180 days
#92

ED6061D-E25112B160M140KVA

SCREW H M16X140X44 Z5CND17-04-01

32 pieces Delivery: 180 days
#93

ED6061D-KP63PB95

LIP SEAL KP63 PB95

1 pieces Delivery: 180 days
#94

ED6061D-M488-0160

DAMPER

1 pieces Delivery: 180 days
#95

ED6061D-MAT488-0041-A-F6-A

KNIFE

1 pieces Delivery: 180 days
#96

ED6061D-MAT488-0041-A-F9-A

SHEAR PIN

2 pieces Delivery: 180 days
#97

ED6061D-STF33-07-02-019-29-3X3-6

O-RING 29.3X3.6-20A8

4 pieces Delivery: 180 days
#98

ED6061D-STF33-07-02-019-4X1-8

O-RING 4X1.8 20A8

3 pieces Delivery: 180 days
#99

ED6061D-46014D17750

O-RING 177.5X5.3 20A8 A-N

12 pieces Delivery: 180 days
#100

ED6061D-GR6900900-C380

GUIDE RING 90-95-9,7 (C380)

36 pieces Delivery: 180 days
#101

ED6061D-RSK300900-T40E

TURCON STEPSEAL SEAL K 90-105.1-6.3 + O-RING 94.6X5.33

32 pieces Delivery: 180 days
#102

ED6061D-33-07-02-019-56-00X3-55

O-RING 56.00X3.55-20A8

1 pieces Delivery: 180 days
#103

ED6061D-477546

SCREW H M10X30 8.8

32 pieces Delivery: 180 days
#104

ED6061D-E22111-600LBZTPS

LOCKNUT M60X2

2 pieces Delivery: 180 days
#105

ED6061D-E25125B120Q50QVAZU

SCREW CHC M12X50X50 CL8-8

12 pieces Delivery: 180 days
#106

ED6061D-ENISO4017-M6X25-A4L-80

SCREW M6X25X25 SS A4 B197

17 pieces Delivery: 180 days
#107

ED6061D-ENISO4017-M8X20-A4L-80

SCREW H M8X20X20 STAINLESS STEEL A4L-80

12 pieces Delivery: 180 days
#108

ED6061D-ENISO4017-M8X25-A4L-80

SCREW H M8X25X25 8.8 A4L-80

93 pieces Delivery: 180 days
#109

ED6061D-484982

SPACER WASHER

12 pieces Delivery: 180 days
#110

ED6061D-484984

WASHER

4 pieces Delivery: 180 days
#111

ED6061D-484985

WASHER

4 pieces Delivery: 180 days
#112

ED6061D-484986

CASTELLATED NUT

4 pieces Delivery: 180 days
#113

ED6061D-E22307A170HYT

LOCK WASHER 17 Z2CND17-13

4 pieces Delivery: 180 days
#114

ED6061D-21710

SEAL NA300 50X40X10

8 pieces Delivery: 180 days
#115

ED6061D-484987

BELLOWS MATING FLANGE

4 pieces Delivery: 180 days
#116

ED6061D-484990

SEATING WASHER

4 pieces Delivery: 180 days
#117

ED6061D-484993

CASTELLATED NUT

4 pieces Delivery: 180 days
#118

ED6061D-484995

CASTELLATED NUT

4 pieces Delivery: 180 days
#119

ED6061D-519938

DRAIN SCREW

8 pieces Delivery: 180 days
#120

ED6061D-E22306A170QZHT

CASTELLATED NUT M17X1 A4-70

4 pieces Delivery: 180 days
#121

ED6061D-E25128A40Q10ZJA

SCREW CL M4X10X10 SS A4-70

16 pieces Delivery: 180 days
#122

ED6061D-ENISO4032-M10-A4L-80

NUT H M10 STAINLESS STEEL A4L-80

16 pieces Delivery: 180 days
#123

ED6061D-9008311183

SCREW H M 8X25X25 8.8 B198

16 pieces Delivery: 180 days
#124

ED6061D-GSM141-003F4DN8-2

STAINLESS STEEL LOCK TAB WASHER DN8

24 pieces Delivery: 180 days
#125

ED6061D-ISO7089-6-A4L-80

WASHER M6A4L-80

1 pieces Delivery: 180 days
#126

ED6061D-MAT164-0315F1

CAPACITY SCREW FOR SS PIPE DE 10.2

3 pieces Delivery: 180 days
#127

ED6061D-487372

ADJUSTING SHIM 487372

2 pieces Delivery: 180 days
#128

ED6061D-487373

ADJUSTING SHIM 487373

2 pieces Delivery: 180 days
#129

ED6061D-487374

ADJUSTING SHIM 487374

2 pieces Delivery: 180 days
#130

ED6061D-ISO4032-M10-8

NUT H M10 STEEL CL 8.8

26 pieces Delivery: 180 days
#131

ED6061D-486988

PISTON ROD

1 pieces Delivery: 180 days
#132

ED6061D-486991

SLOTTED SET SCREW

2 pieces Delivery: 180 days
#133

ED6061D-486999

CYLINDER END-FITTING BRAKE

2 pieces Delivery: 180 days
#134

ED6061D-487006

SLIDE HOLDING SCREW

12 pieces Delivery: 180 days
#135

ED6061D-487007

NUT

12 pieces Delivery: 180 days
#136

ED6061D-487008

SLIDE HOLDING SCREW

14 pieces Delivery: 180 days
#137

ED6061D-487009

GROOVED WASHER DIAM.17X30

28 pieces Delivery: 180 days
#138

ED6061D-487045

BUMPER

1 pieces Delivery: 180 days
#139

ED6061D-7X19DIAM3INOXAISI316

STAINLESS STEEL CABLE 7X19 D-3

10 pieces Delivery: 180 days
#140

ED6061D-88085

BUSH RUCH DE13,72

4 pieces Delivery: 180 days
#141

ED6061D-CDCNPL47892

BUSH RUCH DE10,2

4 pieces Delivery: 180 days
#142

ED6061D-CDCNPL47908

BUSH TIGHTNESS RUCH

10 pieces Delivery: 180 days
#143

ED6061D-E27453-160QCCT

BLIND NUT M16 Z6CNT18 10

14 pieces Delivery: 180 days
#144

ED6061D-ISO1234-2X18-CU

COTTER COPPER PIN 2X18

1 pieces Delivery: 180 days
#145

ED6061D-E25112B160M110KVA

SCREW HM16 110-38 STAINLESS STEEL

16 pieces Delivery: 180 days
#146

ED6061D-E25114B80Q20MUA

SCREW HM8-20-20

2 pieces Delivery: 180 days
#147

ED6061D-E25125B80Q40ZJAPA

SCREW CHC M 8X40 SS A4 B197

3 pieces Delivery: 180 days
#148

ED6061D-E25401A240QQLAT

NUT H M 24 12 PH B199

12 pieces Delivery: 180 days
#149

ED6061D-23352AC040LE

LOCK TAB WASHER

6 pieces Delivery: 180 days
#150

ED6061D-E25114B40Q10QVACM

SCREW H M4X10X10

6 pieces Delivery: 180 days
#151

ED6061D-ISO4032-M5-A4L-80

NUT HM 5 SS A4L-80

1 pieces Delivery: 180 days
#152

ED6061D-ISO8734-12X40-C1

CYLINDRICAL PIN 12X40-C1

1 pieces Delivery: 180 days
#153

ED6061D-ISO8734-8X30-C1

CYLINDRICAL PIN 8X30-C1

2 pieces Delivery: 180 days
#154

ED6061D-SEI-103

THREADED WIRE CLAMP D3-4

6 pieces Delivery: 180 days
#155

ED6061D-E25407B100QQVACM

NUT HM 10 CL8

8 pieces Delivery: 180 days
#156

ED6061D-ENISO10642-M10X60X32-8

SCREW FHC90 M10X60X32 CL8-8

8 pieces Delivery: 180 days
#157

ED6061D-STF33-02V002EVHM12X50X50

STEEL SCREW H M12X50X50 8.8

4 pieces Delivery: 180 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

3 Updates
#1

Update

06-Jun-2025

Extended Deadline

10-Jun-2025, 2:00 pm

Opening Date

10-Jun-2025, 2:30 pm

#2

Update

26-May-2025

Extended Deadline

02-Jun-2025, 9:00 am

Opening Date

02-Jun-2025, 9:30 am

#3

Update

03-May-2025

Extended Deadline

21-May-2025, 11:00 am

Opening Date

21-May-2025, 11:30 am

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-02-06-2025 08:56:41

Frequently Asked Questions

Key insights about KARNATAKA tender market

What are the qualification requirements for participating in this tender?

The qualification requirements for tender participation include being a registered entity capable of meeting military-grade standards for manufacturing. Bidders must possess all relevant licenses and certifications, and demonstrate prior experience in delivering defense components similar to the Attack Periscope and Main Thrust Block. Furthermore, compliance with applicable regulations is mandatory.

What technical specifications must be adhered to for this tender?

Participants must comply with stringent technical specifications that reflect military standards. This includes manufactured components capable of enduring extreme conditions and functioning optimally within military frameworks. Bidders must ensure that all products align with both national and international quality standards, and provide thorough documentation to represent their adherence.

What is the process for submitting bids?

Bids should be submitted electronically, following the guidelines set forth in the tender documentation. Submissions must be formatted according to the accepted document formats specified by the issuing authority. It is crucial for bidders to adhere to submission deadlines to ensure their proposals are evaluated.

Are there provisions for MSEs and startups in this tender?

Yes, this tender includes special provisions for Micro, Small, and Medium Enterprises (MSEs) as well as startups. These provisions are designed to enhance participation by offering support and incentives, in line with the government's broader initiatives to stimulate innovation and growth within these sectors.

How are bid evaluations conducted?

Bid evaluations are carried out through a structured process that assesses both technical and financial aspects of the submitted proposals. Each bid is scored based on predetermined criteria focusing on the overall value proposition, technical compliance, and financial robustness. Notifications regarding the evaluation results will be communicated to all bidders after the assessment.