Progress
Bank Of Baroda invites bids for an Off-Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) at PURNIA, BIHAR – 854102. The procurement involves installation of an autonomous solar PV system, with potential quantity variations up to 25% during both initial and currency periods. Bidders must demonstrate adequate turnover and OEM capability, with emphasis on after-sales support via Indian service centers. The contract contemplates flexible delivery timelines aligned to order dates and extended periods, ensuring readiness for incremental demand shifts. This opportunity targets suppliers with established solar EPC or equipment manufacturing in the Indian market, and a documented capacity to scale while maintaining contractual rates.
Product: Off-grid solar PV power plant equipment
Quantity: Not specified in BOQ; project scope implies scalable deployments
EMD: Not disclosed in data; confirm during bid submission
Standards: IS/IEC safety and performance norms typical for solar PV installations
Service: Local service centers in the state of each consignee location
OEM: For imported products, Indian registered office for after-sales support
Turnover: Three-year average turnover criteria for bidder and OEM
Option Clause allows ±25% quantity variation during contract and currency periods
Three-year turnover requirement with CA/Audited documents; new entities use post-constitution years
OEM turnover criterion applies in bunch bids; highest bid category must meet OEM turnover
Imported products require India-based OEM or Authorized Seller with registered office
Mandatory presence of functional service centers in consignee states
Not explicitly detailed; bidders should verify standard government terms and negotiate with the buyer
Delivery period begins from the last date of original delivery order; option-enabled extensions may apply per clause
Not specified; implied risk of standard LDs for late delivery and non-conformance to specs
Three-year average turnover meeting the bid document requirement
OEM turnover criteria met for the primary product category
Functional service centers in states of all consignee locations
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
12
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3)
Advisory Bank
Bank Of Baroda
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Purnia
Delivery Pincodes
854301
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rakhi Paul | 854301,Bank of Baroda Regional Office 3rd floor Shakuntala Daignostic & Imaging, Rambagh Road, Line Bazar, Purnea | Purnia | Bihar | 854301 | 4 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration
PAN card
Audited financial statements for the last three years or CA certificate indicating turnover
OEM authorization or authorized seller certificate for imported products
Technical bid documents demonstrating installation capability and capability to provide after-sales support
Proof of functional service centers in the states of consignee locations
Experience certificates for similar off-grid solar PV projects
Any other documents specified in the terms and conditions (to be confirmed with bid submission)
Key insights about BIHAR tender market
To bid, ensure you meet the three-year turnover criteria, provide audited financials or CA certificates, and submit OEM authorization for imported products. Include details of your service centers in Bihar and Punjab-like consignee states, and confirm option clause implications for quantity variations.
Required documents include GST, PAN, three-year turnover evidence, OEM authorization for imported items, proof of service centers in consignee states, and experience certificates for similar installations. Submit technical bid documents and any additional terms specified by the buyer.
Bidders should align with standard IS/IEC safety and performance norms typical for off-grid solar PV installations and ensure IS/IEC compliance for electrical safety and system performance, with OEM warranties and service commitments in India.
Delivery windows begin after the last date of the original delivery order; option-driven extensions may apply, calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days and extension possible to the original delivery period.
For bunch bids, the OEM of the primary product category with the highest bid value must meet the OEM turnover criteria as per the bid document, verified via audited statements or CA certificates.
Imported products require an India-registered OEM or Authorized Seller with a registered office to provide after-sales service; bidders must submit the relevant certificate and demonstrate service center coverage in target states.