Bharatiya Nabhikiya Vidyut Nigam Limited (Department of Atomic Energy) invites OEMs or their authorized dealers to supply a 25-tonne load cell with a digital indicator and calibration certificate, plus a 12-month warranty. Quantity: 1 set; location: Kanchipuram, Tamil Nadu 600016. Delivery is 49 days from PO, with pre-dispatch inspection and a post-shipment calibration certificate. The scope is strictly supply of Goods (no services) under GeM terms, including supplier datasheets and QAP approvals. A rigid option clause allows up to 25% quantity variation during the contract, at contracted rates.
EMD equivalent terms as per GeM; ensure submission
Delivery period fixed at 49 days with 25% quantity variation option
Pre-dispatch inspection by purchaser representative with QA acceptance
Payment terms aligned to GeM; no advance specified here; ensure compliance with vendor terms
49-day total delivery; milestones include approval in week 1 and site delivery in week 7
Liquidated damages apply per GeM terms for delayed delivery
OEM of load cells or authorized dealer with valid authorization
Must submit complete datasheets, technical documents, and drawings
Must accompany Test Certificate and Calibration Certificate with bid
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply and safe delivery of a 25-tonne load cell and its digital indicator, along with a calibration
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
49
Delivery Locations
1
Delivery Cities
Chengalpattu
Delivery Pincodes
603102
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Viswanathan K | 603102,BHAVINI PFBR PLANT SITE KALPAKKAM | Chengalpattu | Tamil Nadu | 603102 | 1 | 49 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
OEM authorization letter (for dealers)
Datasheets, technical drawings, and product specifications
Test Certificate and Calibration Certificate
12-month warranty certificate
Previous experience certificates for similar load cell supply
Financial statements or turnover proof
Pre-dispatch inspection report or QA plan
GeM bid security/EMD documentation as applicable
Key insights about TAMIL NADU tender market
Bidders must be OEMs or authorized dealers with documented authorization, submit complete datasheets, technical drawings, and a calibration certificate. Provide Test Certificate, 12-month warranty, and ensure delivery within 49 days. Include GST, PAN, financials, and QA/inspection plans per GeM terms.
Required documents include GST certificate, PAN card, OEM authorization, datasheets and drawings, Test and Calibration Certificates, 12-month warranty, experience certificates, and financial statements. Also provide pre-dispatch inspection plan and QA/QC documentation for acceptance.
Technical scope covers a 25-tonne load cell with digital indicator, calibration certificate, and test certificate. Ensure calibration traceability, datasheets and drawings, and warranty coverage. Pre-dispatch inspection is mandatory, and delivery must occur within 49 days from PO.
The total contract delivery period is fixed at 49 days from PO receipt, with the sequence: datasheet approval in week 1, manufacture/testing in week 5, pre-dispatch in week 6, delivery in week 7.
A 12-month warranty from final acceptance is mandatory. The supplier must provide calibration and test certificates, and the pre-dispatch inspection must be completed by the purchaser's engineer or representative.
Liquidated damages apply as per GeM terms; ensure timely delivery within 49 days. Late delivery triggers LDs calculated per GeM guidelines, affecting overall contract value and future evaluations.