TenderDekho Logo
GEM

Directorate Of Technical Education Maharashtra GEM Tender 2025 – Goods Supply, Installation, Testing & Commissioning, 25% Quantity Option

Bid Publish Date

06-Nov-2025, 11:54 pm

Bid End Date

22-Nov-2025, 5:00 pm

EMD

₹38,855

Value

₹1,21,31,260

Progress

RA
Issue06-Nov-2025, 11:54 pm
Corrigendum12-Nov-2025
Reverse Auction23-Jan-2026, 6:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

398

Category

Bourdon tube Presure gauge Trainer kit 1

Bid Type

Two Packet Bid

Key Highlights

  • Bidder turnover requirement: minimum average turnover over the last 3 years (as per bid document) for bidders and OEMs
  • OEM turnover criterion applies in bunch bids; highest bid value primary product OEM must meet turnover
  • EMD amount: ₹38,855; payment/documentation via GeM portal with GST invoice
  • Quantity flexibility: up to 25% increase/decrease at award and during currency of contract
  • Delivery timeline mechanics: extended delivery period based on quantity variation with minimum 30 days
  • Scope includes training of operators and statutory clearances if required
  • 162 BOQ items reported; item-level details not disclosed in tender data
  • GST invoicing: mandatory upload of GST invoice and GST portal payment confirmation

Categories 73

Tender Overview

Directorate Of Technical Education, Maharashtra invites a GEM tender for the Supply, Installation, Testing & Commissioning (SITC) of goods along with training of operators and providing any statutory clearances if required. Estimated contract value is ₹12,131,260 with an EMD of ₹38,855. The scope includes GST-compliant invoicing via the GeM portal and a flexible quantity clause allowing up to 25% increase/decrease from the bid quantity at contract award and during the currency of the contract. Location is Maharashtra, India, with turnover criteria for bidders and OEMs detailed in the tender terms. A bulk item list comprises 162 BOQ items, though specific item details are not disclosed. The procurement emphasizes compliance, delivery timelines, and financial due diligence to ensure reliable execution within the public procurement framework.

Technical Specifications & Requirements

  • Scope: Supply, Installation, Testing, Commissioning, and operator training; statutory clearances if required.
  • Quantity flexibility: Up to 25% ordered quantity increase/decrease at contract. Delivery period extended proportionally with minimum 30 days if applicable.
  • EMD: ₹38,855 (GeM payment deposit).
  • Estimated value: ₹12,131,260.
  • Invoicing: Upload GST invoice and GST portal payment screenshot on GeM.
  • Turnover criteria: Minimum average annual turnover for last 3 years as per bid document; includes OEM turnover criteria for bunch bids.
  • BOQ: 162 total items; item-level details not disclosed.
  • Scope of supply governance: Must cover training and statutory clearances (if any).

Terms, Conditions & Eligibility

  • EMD: ₹38,855; submission via GeM with GST invoice requirements.
  • Turnover criteria: Minimum average annual turnover over the last 3 years (as per bid document) for bidders and OEM; CA certificate or audited balance sheets to be uploaded.
  • OEM criterion: OEM’s average turnover over last 3 years (or completed financial years post-constitution) must meet bid document thresholds; for bunch bids, OEM of primary product with highest bid value must meet the criterion.
  • Scope of supply: Includes SITC, operator training, and statutory clearances if required.
  • Delivery terms: Option clause allows quantity variation up to 25% and extended delivery period calculations with minimum 30 days; delivery starts from last date of original delivery order.
  • GST compliance: Invoices must be uploaded with GST details and GST payment confirmation on GeM.
  • Important note: Bidder must comply with option clause and deliver at contracted rates; terms linked to GeM portal requirements apply.

Key Specifications

  • Scope includes SITC of goods with operator training

  • EMD: ₹38,855

  • Estimated contract value: ₹12,131,260

  • Quantity variation: ±25% with minimum 30 days extension

Terms & Conditions

  • EMD submission via GeM and GST invoice upload with payment screenshot

  • Last 3 years turnover requirement for bidder and OEM

  • 25% quantity variation rights and corresponding delivery timeline adjustments

Important Clauses

Payment Terms

EMD payable as per GeM guidelines; GST invoice uploaded with GST payment confirmation

Delivery Schedule

Delivery period aligns with last date of original delivery order; option for extended delivery with minimum 30 days and proportional time calculation

Penalties/Liquidated Damages

Not specified in data; ensure compliance with GeM terms and delivery obligations

Bidder Eligibility

  • Minimum average annual turnover over the last 3 years as per bid document

  • OEM turnover criteria met for the offered primary product OEM

  • Proven experience in SITC of similar goods and operator training

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

HIGHER AND TECHNICAL EDUCATION DEPARTMENTDIRECTORATE OF TECHNICAL EDUCATION
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8546666.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Office Of Dg (ace) Bourdon Tube Gauge Tender Chennai Tamil Nadu 600001 0-250/0-60/0-100/0-600 BAR 2026

Office Of Dg (ace)

CHENNAI, TAMIL NADU

Posted: 17 April 2026
Closed: 7 May 2026
GEM

HEAVY DUTY BOURDON TUBE PRESSURE GAUGE, SIZE: 2 1/2“ (63MM) RANGE: 0 - 400BAR, PROCESS CONNECTI,H

Armoured Vehicles Nigam Limited

Posted: 1 November 2024
Closed: 22 November 2024
GEM

HEAVY DUTY BOURDON TUBE PRESSURE GAUGE, SIZE: 2 1/2” (63MM) , RANGE: 0-400 BAR, PROCESS CONNECTIO

Armoured Vehicles Nigam Limited

MEDAK, TELANGANA

Posted: 13 November 2025
Closed: 11 December 2025
GEM

GAUGE PRES BOURDON TUBE 1 1KG CM2,GAUGE PRES BOURDON TUBE 0 6KG CM2 100MM,GAUGE PRES BOURDON TUBE 0

Rourkela Steel Plant

SUNDERGARH, ODISHA

Posted: 5 February 2025
Closed: 15 February 2025
GEM

DPG601LD BOURDON TUBE

Hindustan Aeronautics Limited (hal)

LUCKNOW, UTTAR PRADESH

Posted: 3 February 2025
Closed: 11 March 2025
GEM

Bill of Quantities (BOQ) 162 Items Sign in for GEM prices

#1

Bourdon tube Presure gauge Trainer kit 1

Bourdon tube Presure gauge Trainer kit 1

1 pieces Delivery: 45 days
#2

Bourdon tube Presure gauge Trainer kit 2

Bourdon tube Presure gauge Trainer kit 2

1 pieces Delivery: 45 days
#3

Bourdon tube Presure gauge Trainer kit 3

Bourdon tube Presure gauge Trainer kit 3

1 pieces Delivery: 45 days
#4

Bourdon tube Presure gauge Trainer kit 4

Bourdon tube Presure gauge Trainer kit 4

1 pieces Delivery: 45 days
#5

Capacitance level measurement 1

Capacitance level measurement 1

1 pieces Delivery: 45 days
#6

Capacitance level measurement 2

Capacitance level measurement 2

1 pieces Delivery: 45 days
#7

Capacitance level measurement 3

Capacitance level measurement 3

1 pieces Delivery: 45 days
#8

Capacitance transducer to measure level water tank1

Capacitance transducer to measure level water tank1

1 pieces Delivery: 45 days
#9

Capacitance transducer to measure level water tank2

Capacitance transducer to measure level water tank2

1 pieces Delivery: 45 days
#10

DC Regulated power supply 1

DC Regulated power supply 1

4 pieces Delivery: 45 days
#11

DC Regulated power supply 2

DC Regulated power supply 2

3 pieces Delivery: 45 days
#12

DC Regulated power supply 3

DC Regulated power supply 3

4 pieces Delivery: 45 days
#13

DC Regulated power supply 4

DC Regulated power supply 4

1 pieces Delivery: 45 days
#14

DC Regulated power supply 5

DC Regulated power supply 5

2 pieces Delivery: 45 days
#15

DC Regulated power supply 6

DC Regulated power supply 6

5 pieces Delivery: 45 days
#16

DC Regulated power supply 7

DC Regulated power supply 7

1 pieces Delivery: 45 days
#17

Digital Earth tester 1

Digital Earth tester 1

1 pieces Delivery: 45 days
#18

Digital Earth tester 2

Digital Earth tester 2

1 pieces Delivery: 45 days
#19

Digital Earth tester 3

Digital Earth tester 3

1 pieces Delivery: 45 days
#20

Digital Earth tester 4

Digital Earth tester 4

2 pieces Delivery: 45 days
#21

Digital Earth tester 5

Digital Earth tester 5

2 pieces Delivery: 45 days
#22

Digital Earth tester 6

Digital Earth tester 6

1 pieces Delivery: 45 days
#23

Digital Earth tester 7

Digital Earth tester 7

1 pieces Delivery: 45 days
#24

Digital Earth tester 8

Digital Earth tester 8

2 pieces Delivery: 45 days
#25

Digital Earth tester 9

Digital Earth tester 9

1 pieces Delivery: 45 days
#26

Digital storage oscilloscope 1

Digital storage oscilloscope 1

2 pieces Delivery: 45 days
#27

Digital storage oscilloscope 2

Digital storage oscilloscope 2

3 pieces Delivery: 45 days
#28

Digital storage oscilloscope 3

Digital storage oscilloscope 3

3 pieces Delivery: 45 days
#29

Digital storage oscilloscope 4

Digital storage oscilloscope 4

2 pieces Delivery: 45 days
#30

Digital storage oscilloscope 5

Digital storage oscilloscope 5

1 pieces Delivery: 45 days
#31

Digital storage oscilloscope 6

Digital storage oscilloscope 6

3 pieces Delivery: 45 days
#32

Digital storage oscilloscope 7

Digital storage oscilloscope 7

4 pieces Delivery: 45 days
#33

Digital storage oscilloscope 8

Digital storage oscilloscope 8

3 pieces Delivery: 45 days
#34

Digital storage oscilloscope 9

Digital storage oscilloscope 9

3 pieces Delivery: 45 days
#35

Digital Stroboscope 1

Digital Stroboscope 1

1 pieces Delivery: 45 days
#36

Digital Stroboscope 2

Digital Stroboscope 2

1 pieces Delivery: 45 days
#37

Digital Stroboscope 3

Digital Stroboscope 3

1 pieces Delivery: 45 days
#38

Dual Trace Oscilloscope 1

Dual Trace Oscilloscope 1

1 pieces Delivery: 45 days
#39

Dual Trace Oscilloscope 2

Dual Trace Oscilloscope 2

1 pieces Delivery: 45 days
#40

Dual Trace Oscilloscope 3

Dual Trace Oscilloscope 3

1 pieces Delivery: 45 days
#41

Dual Trace Oscilloscope 4

Dual Trace Oscilloscope 4

2 pieces Delivery: 45 days
#42

Dual Trace Oscilloscope 5

Dual Trace Oscilloscope 5

1 pieces Delivery: 45 days
#43

Experimental kit for measurement of temperature using Thermocouple 1

Experimental kit for measurement of temperature using Thermocouple 1

1 pieces Delivery: 45 days
#44

Experimental kit for measurement of temperature using Thermocouple 2

Experimental kit for measurement of temperature using Thermocouple 2

1 pieces Delivery: 45 days
#45

Experimental kit for measurement of temperature using Thermocouple 3

Experimental kit for measurement of temperature using Thermocouple 3

1 pieces Delivery: 45 days
#46

Experimental kit for the measurement of displacement using LVDT 1

Experimental kit for the measurement of displacement using LVDT 1

1 pieces Delivery: 45 days
#47

Experimental kit for the measurement of displacement using LVDT 2

Experimental kit for the measurement of displacement using LVDT 2

1 pieces Delivery: 45 days
#48

Experimental kit for the measurement of displacement using LVDT 3

Experimental kit for the measurement of displacement using LVDT 3

1 pieces Delivery: 45 days
#49

Experimental kit for the measurement of displacement using LVDT 4

Experimental kit for the measurement of displacement using LVDT 4

1 pieces Delivery: 45 days
#50

Experimental kit for the measurement of displacement using LVDT 5

Experimental kit for the measurement of displacement using LVDT 5

1 pieces Delivery: 45 days
#51

Experimental kit for the measurement of displacement using LVDT 6

Experimental kit for the measurement of displacement using LVDT 6

1 pieces Delivery: 45 days
#52

Experimental kit for the measurement of displacement using LVDT 7

Experimental kit for the measurement of displacement using LVDT 7

1 pieces Delivery: 45 days
#53

Inductive load bank 1

Inductive load bank 1

2 pieces Delivery: 45 days
#54

Inductive load bank 2

Inductive load bank 2

1 pieces Delivery: 45 days
#55

Kelvin double bridge 1

Kelvin double bridge 1

1 pieces Delivery: 45 days
#56

Kelvin double bridge 2

Kelvin double bridge 2

2 pieces Delivery: 45 days
#57

Kelvin double bridge 3

Kelvin double bridge 3

1 pieces Delivery: 45 days
#58

Kelvin double bridge 4

Kelvin double bridge 4

1 pieces Delivery: 45 days
#59

Kelvin double bridge 5

Kelvin double bridge 5

1 pieces Delivery: 45 days
#60

Kelvin double bridge 6

Kelvin double bridge 6

1 pieces Delivery: 45 days
#61

M.I Type Analog Ammeter 0 1 A 1

M.I Type Analog Ammeter 0 1 A 1

6 pieces Delivery: 45 days
#62

M.I Type Analog Ammeter 0 1 A 4

M.I Type Analog Ammeter 0 1 A 4

5 pieces Delivery: 45 days
#63

M.I Type Analog Ammeter 0 1 A 2

M.I Type Analog Ammeter 0 1 A 2

3 pieces Delivery: 45 days
#64

M.I Type Analog Ammeter 0 1 A 3

M.I Type Analog Ammeter 0 1 A 3

11 pieces Delivery: 45 days
#65

M.I Type Analog Ammeter 10 20 A

M.I Type Analog Ammeter 10 20 A

2 pieces Delivery: 45 days
#66

M.I Type Analog Ammeter 2.5 5 A 1

M.I Type Analog Ammeter 2.5 5 A 1

10 pieces Delivery: 45 days
#67

M.I Type Analog Ammeter 2.5 5 A 2

M.I Type Analog Ammeter 2.5 5 A 2

5 pieces Delivery: 45 days
#68

M.I Type Analog Ammeter 5 10 A 1

M.I Type Analog Ammeter 5 10 A 1

6 pieces Delivery: 45 days
#69

M.I Type Analog Ammeter 5 10 A 2

M.I Type Analog Ammeter 5 10 A 2

10 pieces Delivery: 45 days
#70

M.I Type Analog Ammeter 5 10 A 3

M.I Type Analog Ammeter 5 10 A 3

3 pieces Delivery: 45 days
#71

M.I Type Analog Ammeter 5 10 A 4

M.I Type Analog Ammeter 5 10 A 4

5 pieces Delivery: 45 days
#72

M.I Type Analog Ammeter 5 10 A 5

M.I Type Analog Ammeter 5 10 A 5

10 pieces Delivery: 45 days
#73

Megger Hand driven 1

Megger Hand driven 1

2 pieces Delivery: 45 days
#74

Megger Hand driven 2

Megger Hand driven 2

1 pieces Delivery: 45 days
#75

Megger Hand driven 3

Megger Hand driven 3

1 pieces Delivery: 45 days
#76

Megger Hand driven 4

Megger Hand driven 4

1 pieces Delivery: 45 days
#77

Megger Hand driven 5

Megger Hand driven 5

1 pieces Delivery: 45 days
#78

MI type Analog Voltmeter 125 250 500V

MI type Analog Voltmeter 125 250 500V

4 pieces Delivery: 45 days
#79

MI type Analog Voltmeter 300 600V 1

MI type Analog Voltmeter 300 600V 1

10 pieces Delivery: 45 days
#80

MI type Analog Voltmeter 300 600V 2

MI type Analog Voltmeter 300 600V 2

3 pieces Delivery: 45 days
#81

MI type Analog Voltmeter 300 600V 3

MI type Analog Voltmeter 300 600V 3

11 pieces Delivery: 45 days
#82

MI type Analog Voltmeter 300 600V 4

MI type Analog Voltmeter 300 600V 4

5 pieces Delivery: 45 days
#83

MI type Analog Voltmeter 300 600V 5

MI type Analog Voltmeter 300 600V 5

10 pieces Delivery: 45 days
#84

MI type Analog Voltmeter 75 150 300V 1

MI type Analog Voltmeter 75 150 300V 1

7 pieces Delivery: 45 days
#85

MI type Analog Voltmeter 75 150 300V 2

MI type Analog Voltmeter 75 150 300V 2

11 pieces Delivery: 45 days
#86

MI type Analog Voltmeter 75 150 300V 3

MI type Analog Voltmeter 75 150 300V 3

5 pieces Delivery: 45 days
#87

Network Theorem trainer kit 1

Network Theorem trainer kit 1

2 pieces Delivery: 45 days
#88

Network Theorem trainer kit 2

Network Theorem trainer kit 2

4 pieces Delivery: 45 days
#89

Network Theorem trainer kit 3

Network Theorem trainer kit 3

2 pieces Delivery: 45 days
#90

Orifice meter measurement setup 1

Orifice meter measurement setup 1

1 pieces Delivery: 45 days
#91

Orifice meter measurement setup 2

Orifice meter measurement setup 2

1 pieces Delivery: 45 days
#92

Orifice meter measurement setup 3

Orifice meter measurement setup 3

1 pieces Delivery: 45 days
#93

Phase Sequence indicator 1

Phase Sequence indicator 1

2 pieces Delivery: 45 days
#94

Phase Sequence indicator 2

Phase Sequence indicator 2

1 pieces Delivery: 45 days
#95

Rheostat 0 100 Ohm,2.5A

Rheostat 0 100 Ohm,2.5A

6 pieces Delivery: 45 days
#96

Rheostat 0 100 Ohm,5A 1

Rheostat 0 100 Ohm,5A 1

4 pieces Delivery: 45 days
#97

Rheostat 0 100 Ohm,5A 2

Rheostat 0 100 Ohm,5A 2

6 pieces Delivery: 45 days
#98

Rheostat 0 250 Ohm, 2.5 A 1

Rheostat 0 250 Ohm, 2.5 A 1

6 pieces Delivery: 45 days
#99

Rheostat 0 250 Ohm, 2.5 A 2

Rheostat 0 250 Ohm, 2.5 A 2

3 pieces Delivery: 45 days
#100

Rheostat 0 250 Ohm,1A

Rheostat 0 250 Ohm,1A

6 pieces Delivery: 45 days
#101

Rheostat 0 50 Ohm,5A

Rheostat 0 50 Ohm,5A

2 pieces Delivery: 45 days
#102

Rheostat 0 500 Ohm, 2.5 A

Rheostat 0 500 Ohm, 2.5 A

2 pieces Delivery: 45 days
#103

Rotameter flow measurement setup 1

Rotameter flow measurement setup 1

1 pieces Delivery: 45 days
#104

Rotameter flow measurement setup 2

Rotameter flow measurement setup 2

1 pieces Delivery: 45 days
#105

Rotameter flow measurement setup 3

Rotameter flow measurement setup 3

1 pieces Delivery: 45 days
#106

RTD temperature measurement setup 1

RTD temperature measurement setup 1

1 pieces Delivery: 45 days
#107

RTD temperature measurement setup 2

RTD temperature measurement setup 2

1 pieces Delivery: 45 days
#108

Strain gauge trainer kit 1

Strain gauge trainer kit 1

1 pieces Delivery: 45 days
#109

Strain gauge trainer kit 2

Strain gauge trainer kit 2

1 pieces Delivery: 45 days
#110

Strain gauge trainer kit 3

Strain gauge trainer kit 3

1 pieces Delivery: 45 days
#111

Strain gauge trainer kit 4

Strain gauge trainer kit 4

1 pieces Delivery: 45 days
#112

Strain gauge trainer kit 5

Strain gauge trainer kit 5

1 pieces Delivery: 45 days
#113

Strain gauge trainer kit 6

Strain gauge trainer kit 6

1 pieces Delivery: 45 days
#114

Three phase Load Rheostat 1

Three phase Load Rheostat 1

1 pieces Delivery: 45 days
#115

Three phase Load Rheostat 2

Three phase Load Rheostat 2

1 pieces Delivery: 45 days
#116

Three phase Load Rheostat 3

Three phase Load Rheostat 3

1 pieces Delivery: 45 days
#117

Three phase Load Rheostat 4

Three phase Load Rheostat 4

1 pieces Delivery: 45 days
#118

Three phase Load Rheostat 5

Three phase Load Rheostat 5

1 pieces Delivery: 45 days
#119

Three phase Power Factor Meter 1

Three phase Power Factor Meter 1

1 pieces Delivery: 45 days
#120

Three phase Power Factor Meter 2

Three phase Power Factor Meter 2

2 pieces Delivery: 45 days
#121

Three phase Power Factor Meter 3

Three phase Power Factor Meter 3

2 pieces Delivery: 45 days
#122

Three phase Power Factor Meter 4

Three phase Power Factor Meter 4

1 pieces Delivery: 45 days
#123

Three phase Power Factor Meter 5

Three phase Power Factor Meter 5

1 pieces Delivery: 45 days
#124

Three phase Synchronous Motor coupled with DC shunt generator setup 1

Three phase Synchronous Motor coupled with DC shunt generator setup 1

1 pieces Delivery: 45 days
#125

Three phase Synchronous Motor coupled with DC shunt generator setup 2

Three phase Synchronous Motor coupled with DC shunt generator setup 2

1 pieces Delivery: 45 days
#126

Three phase Synchronous Motor coupled with DC shunt generator setup 3

Three phase Synchronous Motor coupled with DC shunt generator setup 3

1 pieces Delivery: 45 days
#127

Three phase Synchronous Motor coupled with DC shunt generator setup 4

Three phase Synchronous Motor coupled with DC shunt generator setup 4

1 pieces Delivery: 45 days
#128

THREE PHASE VERIABLE RESISTIVE LOAD 1

THREE PHASE VERIABLE RESISTIVE LOAD 1

2 pieces Delivery: 45 days
#129

THREE PHASE VERIABLE RESISTIVE LOAD 2

THREE PHASE VERIABLE RESISTIVE LOAD 2

1 pieces Delivery: 45 days
#130

THREE PHASE VERIABLE RESISTIVE LOAD 3

THREE PHASE VERIABLE RESISTIVE LOAD 3

2 pieces Delivery: 45 days
#131

Transmission line protection simulation kit 1

Transmission line protection simulation kit 1

1 pieces Delivery: 45 days
#132

Transmission line protection simulation kit 2

Transmission line protection simulation kit 2

1 pieces Delivery: 45 days
#133

Transmission line protection simulation kit 3

Transmission line protection simulation kit 3

1 pieces Delivery: 45 days
#134

Transmission line protection simulation kit 4

Transmission line protection simulation kit 4

1 pieces Delivery: 45 days
#135

Transmission line simulator 1

Transmission line simulator 1

1 pieces Delivery: 45 days
#136

Transmission line simulator 2

Transmission line simulator 2

1 pieces Delivery: 45 days
#137

Transmission line simulator 3

Transmission line simulator 3

1 pieces Delivery: 45 days
#138

Undrground cable fault locator 1

Undrground cable fault locator 1

1 pieces Delivery: 45 days
#139

Undrground cable fault locator 2

Undrground cable fault locator 2

1 pieces Delivery: 45 days
#140

Undrground cable fault locator 3

Undrground cable fault locator 3

1 pieces Delivery: 45 days
#141

Venturi flow measurement setup 1

Venturi flow measurement setup 1

1 pieces Delivery: 45 days
#142

Venturi flow measurement setup 2

Venturi flow measurement setup 2

1 pieces Delivery: 45 days
#143

Venturi flow measurement setup 3

Venturi flow measurement setup 3

1 pieces Delivery: 45 days
#144

Wattmeter 0.5 1A, 150 300V Low Power factor

Wattmeter 0.5 1A, 150 300V Low Power factor

6 pieces Delivery: 45 days
#145

Wattmeter 10 20 A ,150 300 600V Unity Power factor 1

Wattmeter 10 20 A ,150 300 600V Unity Power factor 1

4 pieces Delivery: 45 days
#146

Wattmeter 10 20 A ,150 300 600V Unity Power factor 2

Wattmeter 10 20 A ,150 300 600V Unity Power factor 2

4 pieces Delivery: 45 days
#147

Wattmeter 10 20 A ,150 300 600V Unity Power factor 3

Wattmeter 10 20 A ,150 300 600V Unity Power factor 3

2 pieces Delivery: 45 days
#148

Wattmeter 10 20 A ,150 300 600V Unity Power factor 4

Wattmeter 10 20 A ,150 300 600V Unity Power factor 4

3 pieces Delivery: 45 days
#149

Wattmeter 10 20 A ,150 300 600V Unity Power factor 5

Wattmeter 10 20 A ,150 300 600V Unity Power factor 5

2 pieces Delivery: 45 days
#150

Wattmeter 10 20 A ,150 300 600V Unity Power factor 6

Wattmeter 10 20 A ,150 300 600V Unity Power factor 6

2 pieces Delivery: 45 days
#151

Wattmeter 2.5 5A , 150 300V Unity Power factor 1

Wattmeter 2.5 5A , 150 300V Unity Power factor 1

7 pieces Delivery: 45 days
#152

Wattmeter 2.5 5A , 150 300V Unity Power factor 2

Wattmeter 2.5 5A , 150 300V Unity Power factor 2

3 pieces Delivery: 45 days
#153

Wattmeter 2.5 5A , 150 300V Unity Power factor 3

Wattmeter 2.5 5A , 150 300V Unity Power factor 3

4 pieces Delivery: 45 days
#154

Wattmeter 2.5 5A , 150 300V Unity Power factor 4

Wattmeter 2.5 5A , 150 300V Unity Power factor 4

2 pieces Delivery: 45 days
#155

Wattmeter 5 10 A ,150 300 600V Unity Power factor 1

Wattmeter 5 10 A ,150 300 600V Unity Power factor 1

2 pieces Delivery: 45 days
#156

Wattmeter 5 10 A ,150 300 600V Unity Power factor 2

Wattmeter 5 10 A ,150 300 600V Unity Power factor 2

8 pieces Delivery: 45 days
#157

Wattmeter 5 10 A ,150 300 600V Unity Power factor 3

Wattmeter 5 10 A ,150 300 600V Unity Power factor 3

5 pieces Delivery: 45 days
#158

Wattmeter 5 10 A ,150 300 600V Unity Power factor 4

Wattmeter 5 10 A ,150 300 600V Unity Power factor 4

3 pieces Delivery: 45 days
#159

Wheatstone bridge 1

Wheatstone bridge 1

1 pieces Delivery: 45 days
#160

Wheatstone bridge 2

Wheatstone bridge 2

2 pieces Delivery: 45 days
#161

Wheatstone bridge 3

Wheatstone bridge 3

1 pieces Delivery: 45 days
#162

Wheatstone bridge 4

Wheatstone bridge 4

1 pieces Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA/Cost Accountant certification showing turnover for last 3 years

4

Certificate of incorporation / constitution (for bidder and OEM if applicable)

5

OEM authorization letter (if bidding on behalf of OEM)

6

Experience certificates of similar SITC projects

7

Technical bid documents and compliance statements

8

EMD payment proof (GeM portal receipt)

Corrigendum Updates

1 Update
#1

Update

12-Nov-2025

Reverse Auction Schedule

Completed

Start

23-Jan-2026, 6:00 pm

End

28-Jan-2026, 10:00 am

Duration: 112 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on the SITC goods tender in Maharashtra for 2025?

Bidders must meet turnover criteria for both bidder and OEM, submit an EMD of ₹38,855, and provide GST-compliant invoices via the GeM portal. Include experience certificates for similar SITC projects, OEM authorizations if applicable, and audited financials for the last 3 years. Follow the GeM submission workflow.

What documents are required for the Maharashtra GeM SITC bid?

Required documents include GST registration, PAN, turnover certificates or audited Balance Sheets for last 3 years, OEM authorization if bidding for an OEM, experience certificates for SITC projects, technical bid, and EMD proof. Also upload the GST invoice and GST payment screenshot on GeM.

What are the key technical requirements for SITC tender in Maharashtra?

Scope requires Supply, Installation, Testing and Commissioning of goods, operator training, and statutory clearances if any. The contract allows ±25% quantity variation with delivery time recalculation, and delivery starts after the original delivery order date with a minimum 30-day extension window.

What is the EMD for the Maharashtra GEM tender and how to pay?

EMD is ₹38,855. Payment and submission are handled through the GeM portal; ensure GST invoice is uploaded along with payment confirmation screenshots to validate tender eligibility.

When does the quantity variation right apply in this Maharashtra tender?

The purchaser may increase or decrease the bid quantity up to 25% at contract placement and during the currency of the contract at contracted rates; delivery schedule adjusts based on the extended quantity and time calculations.

What is the estimated contract value for the Maharashtra SITC tender?

The estimated value is ₹12,131,260. Bidders should prepare commercial proposals that cover all costs including SITC, operator training, and any required statutory clearances as part of the bid price.

What are the OEM turnover criteria for this Maharashtra bid?

OEMs must meet the minimum average annual turnover over the last 3 years as specified in the bid document; for bunch bids, the OEM of the highest bid value principal product must satisfy this turnover criterion with eligible financial documentation.

What are the GST invoicing requirements for GeM bidding in Maharashtra?

Bidders must upload GST-compliant invoices and the GST portal payment confirmation alongside the GeM bid submission; this ensures proper tax compliance and timely payment processing for the awarded contract.

Similar Tenders

5 found
Urgent

Top Cover Gasket,Bottom Cover Gasket,Light Glass Gasket Inner,Light Glass Gasket Outer,Shell Neck T

Indian Coast Guard

📍 MUMBAI, MAHARASHTRA

Est: ₹5.0 L
⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

M2/BOF-5094494 BRACKET PIPE UNION FRONT (BREECH RING),M2/IAN-248SA PIPE CHANGE OVER VALVE,M2/IAN-23

Indian Army

📍 JABALPUR, MADHYA PRADESH

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

ADVANCE MOTOR FAULT TESTING TRAINER KIT,ADVANCE INDUSTRIAL MOTOR STARTER TRAINER KIT

Indian Navy

📍 MUMBAI, MAHARASHTRA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Nhpc Limited Pressure Gauge & Related Components Tender Kullu Himachal Pradesh 2026 IS/ISO Compliant

Nhpc Limited

📍 KULLU, HIMACHAL PRADESH

EMD: ₹20,000
Est: ₹9.7 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

NK000010 BRAKE PAD,2154 4290 0131 ASSY PIPE TO AIR GAUGE 1,X 1916010 RADIATOR PIPE,3903745 HOSE PLA

Indian Army

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Chat with us