Dual Duty V Pulley W/Taper Lock 450MM PCD, 6GR With Taper Lock Bush 3535 Pilot Bore Pulleys Have t,
Kiocl Limited
DAKSHINA KANNADA, KARNATAKA
Progress
Quantity
2
Category
Coupler unit for M/s L&T make Side Arm Charger, Hauling capacity- 37.5 Ton
Bid Type
Single Packet Bid
Damodar Valley Corporation invites bids for the procurement of drive pulley with vulcanized natural rubber lagging (D-4) and a coupler unit for M/s L&T make with a size 630 mm x FW 1600 mm and a hauling capacity of 37.5 Ton. The tender body lists a blended scope under the Contracts And Materials department, with no explicit start/end dates or estimated value disclosed. A notable term is the option clause allowing quantity fluctuation up to 25%, affecting delivery timelines and requiring the bidder to align with extended delivery calculations. The procurement context centers on heavy-duty mechanical components for mining/processing applications, emphasizing compatibility with equipment from M/s L&T and the specified pulley dimensions. The unique aspect is the explicit option-based quantity adjustment within contracted rates, demanding robust supply planning and flexible scheduling from bidders.
Drive Pulley with vulcanized natural rubber lagging (D-4) – 630 mm diameter, FW 1600 mm
Coupler unit for M/s L&T make
Side Arm Charger integration
Hauling capacity target: 37.5 Ton
Quantity fluctuation: up to 25% allowed under option clause
Delivery window calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
EMD amount not disclosed; bidders should verify security requirements
Option clause enables ±25% quantity change at contract and during currency
Delivery timing linked to original and extended periods with minimum 30 days
ATC document available; bidders must review for compliance
OEM-aligned components; verify compatibility with M/s L&T equipment
Not specified in available data; bidders should refer to standard DVC procurement terms and ATC for payment timing and method
Delivery period is adjustable via option clause; calculation: (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days
Not specified in current data; bidders should rely on standard contract penalties per DVC policy in ATC
Demonstrated experience with heavy mechanical components procurement
Capability to supply OEM-aligned drive pulleys and coupler units
Financial stability evidenced by audited statements
Kiocl Limited
DAKSHINA KANNADA, KARNATAKA
Indian Army
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Indian Army
LUCKNOW, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates
Financial statements
Technical bid documents
OEM authorizations (if applicable)
EMD/Security deposit (as per policy)
Key insights about JHARKHAND tender market
Bidders should review ATC terms, submit standard bidder documents (GST, PAN, experience, financials), and provide OEM authorizations if required. Ensure compliance with the 25% quantity option and minimum 30-day delivery extension rules. Prepare technical details for 630 mm x FW 1600 mm pulley and 37.5 Ton capacity.
Submit GST registration, PAN, audited financial statements, experience certificates, OEM authorization letters, and technical bid documents. Include EMD as per policy if specified in ATC, and any project-specific compliance certificates requested by Damodar Valley Corporation.
Pulley must be 630 mm diameter with FW 1600 mm and include vulcanized natural rubber lagging (D-4). The scope also covers a coupler unit suitable for M/s L&T equipment and a Side Arm Charger with a 37.5 Ton hauling capacity.
Delivery is governed by the option clause; base delivery time starts from the last date of the original delivery order and extended periods apply. If quantity increases, extended time uses (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.
Eligible bidders must prove relevant experience in supplying heavy mechanical components, demonstrate financial stability, provide GST and PAN details, and supply OEM authorizations if required. Ensure ability to meet 25% quantity adjustment and delivery extension terms from ATC.
The purchaser may increase or decrease bid quantity by up to 25% at contract placement and during the contract currency at contracted rates. Additional delivery time follows a formula with a minimum 30-day extension, and delivery terms adjust accordingly.
Suppliers must provide drive pulleys with L&T compatibility and include a coupler unit for M/s L&T make. While explicit standards are not listed, OEM alignment and cross-compatibility with L&T equipment are required as part of the technical scope.
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS