Bid Publish Date
28-Jul-2026, 4:46 pm
Bid End Date
20-Aug-2026, 7:00 pm
EMD
₹10,340
Location
Progress
Bhakra Beas Management Board invites bids for Removal of existing EOT, Motor for Lifting, Hoist drive motor, Motor for Runway, Copper cable, Master Controller, Switch, Control Panel, compatible to EOT, Hook block, Rope, Trolley, Steel Rope, Wheel for longitudinal in KANGRA, HIMACHAL PRADESH. Quantity: 169. Submission Deadline: 20-08-2026 19: 00: 00. Submit your proposal before the deadline.
Quantity
169
Category
Removal of existing EOT
Bid Type
Single Packet Bid
Bid Validity
80 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
25
OEM Avg. Turnover
10
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Removal of existing EOT , Motor for Lifting , Hoist drive motor , Motor for Runway , Copper cable , Master Controller , Switch , Control Panel , compatible to EOT , Hook block , Rope , Trolley , Steel Rope , Wheel for longitudinal
Advisory Bank
State Bank of India
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Kangra
Delivery Pincodes
176501
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajeshwar Singh | 176501,Store Sub-Division, BBMB, Sansarpur Terrace, Kangra, Himachal Pradesh Pin: 176501 | Kangra | Himachal Pradesh | 176501 | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Removal of existing EOT
Removal of existing EOT Crane complete without dismantling existing M S supporting structure and providing and fixing New EOT Crane capacity 3 MT including erection commissioning and testing on existing M S structure by renovation if any to the satisfaction of Engineer incharge
Motor for Lifting
Motor for Lifting 3 phase 415 volt 10 HP Induction Motor
Hoist drive motor
Motor for Hoist drive motor 3 phase 415- volt 5 HP Induction Motor
Motor for Runway
Motor for Runway 3 phase 415 volt 3 HP Induction Motor
Copper cable
Copper cable as per IS standard 3 5 core copper flexible cable 10 sq mm
Master Controller
Master Controller Forward and backward reverse and forward and Up and Down Electrical pendent push button system
Switch
Limit Switch As per field requirement
Control Panel
Electric Control Panel with starter for EOT Crane
compatible to EOT
Hoist compatible to EOT
Hook block
Hook block for 3 Ton Capacity
Rope
Steel Rope 16 mm
Trolley
Trolley for Steel Rope Rope Drum
Steel Rope
Trolley for Steel Rope Rope Drum
Wheel for longitudinal
Wheel for longitudinal and Transverse moment
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Removal of existing EOT | Removal of existing EOT Crane complete without dismantling existing M S supporting structure and providing and fixing New EOT Crane capacity 3 MT including erection commissioning and testing on existing M S structure by renovation if any to the satisfaction of Engineer incharge | 1 | number | sdostorebdt | 30 | |
| 2 | Motor for Lifting | Motor for Lifting 3 phase 415 volt 10 HP Induction Motor | 1 | number | sdostorebdt | 30 | |
| 3 | Hoist drive motor | Motor for Hoist drive motor 3 phase 415- volt 5 HP Induction Motor | 1 | number | sdostorebdt | 30 | |
| 4 | Motor for Runway | Motor for Runway 3 phase 415 volt 3 HP Induction Motor | 1 | number | sdostorebdt | 30 | |
| 5 | Copper cable | Copper cable as per IS standard 3 5 core copper flexible cable 10 sq mm | 100 | meter | sdostorebdt | 30 | |
| 6 | Master Controller | Master Controller Forward and backward reverse and forward and Up and Down Electrical pendent push button system | 1 | number | sdostorebdt | 30 | |
| 7 | Switch | Limit Switch As per field requirement | 4 | number | sdostorebdt | 30 | |
| 8 | Control Panel | Electric Control Panel with starter for EOT Crane | 1 | number | sdostorebdt | 30 | |
| 9 | compatible to EOT | Hoist compatible to EOT | 1 | set | sdostorebdt | 30 | |
| 10 | Hook block | Hook block for 3 Ton Capacity | 1 | number | sdostorebdt | 30 | |
| 11 | Rope | Steel Rope 16 mm | 40 | meter | sdostorebdt | 30 | |
| 12 | Trolley | Trolley for Steel Rope Rope Drum | 1 | number | sdostorebdt | 30 | |
| 13 | Steel Rope | Trolley for Steel Rope Rope Drum | 8 | number | sdostorebdt | 30 | |
| 14 | Wheel for longitudinal | Wheel for longitudinal and Transverse moment | 8 | number | sdostorebdt | 30 |
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer