Bid Publish Date
08-Oct-2026, 1:03 pm
Bid End Date
19-Oct-2026, 2:00 pm
Location
Progress
Organization: Indian Army, Department of Military Affairs, seeking procurement and installation of aluminium partition with material and labour charges, along with floor carpet, Split AC 2 Ton 3 Star, ceiling fan, and light connections with extension power board including power cable in Lucknow, Uttar Pradesh 226001. BoQ shows 5 items, but no item-wise quantities or values are disclosed in the data. The tender includes a 25% flexible quantity option and extended delivery time calculations, with delivery commencing after the original delivery order date. A distinctive requirement is the submission of a physical sample of the item before opening of the technical bid. This tender is governed by Army ATC terms and allows bidders to scale orders within the stated option window.
Product: Aluminium partition with material and labour charges
Electrical scope: Floor carpet, Split AC 2 Ton 3 Star, Ceiling fan, Light connections with extension power board including power cable
Delivery: Within original delivery period with possible 25% quantity variation
Sample: Physical item sample submission prior to technical bid opening
Standards/Certifications: Not specified in provided data; bidders should verify during bid process
20-25% quantity adjustment window during contract execution
Mandatory physical sample submission prior to technical bid opening
Vendor code creation requires PAN, GST, cancelled cheque, EFT mandate
Not specified in the provided data; bidders must review bid terms for payment milestones and methods.
Delivery period to commence from the last date of original delivery order; extended time calculated by (additional quantity/original quantity) × original delivery period, minimum 30 days.
Not specified in the provided data; confirm LD terms during bid evaluation.
Must provide PAN, GST, bank EFT mandate and cancelled cheque
Must submit physical sample prior to technical bid opening
Possess capability to execute aluminium partition works plus electrical fittings per scope
Quantity
574
Category
ALUMINIUM PARTITION WITH MATERIAL AND LABOUR CHARGES
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ALUMINIUM PARTITION WITH MATERIAL AND LABOUR CHARGES , FLOOR CARPET , SPLIT AC 2 TON 3 STAR , CEILING FAN , LIGHT CONNECTION WITH EXTENSION POWER BOARD INCLUDING POWER CABLE
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Lucknow
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Lucknow | Lucknow | - | - | 380 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
ALUMINIUM PARTITION WITH MATERIAL AND LABOUR CHARGES
ALUMINIUM PARTITION WITH MATERIAL AND LABOUR CHARGES
FLOOR CARPET
FLOOR CARPET
SPLIT AC 2 TON 3 STAR
SPLIT AC 2 TON 3 STAR
CEILING FAN
CEILING FAN
LIGHT CONNECTION WITH EXTENSION POWER BOARD INCLUDING POWER CABLE
LIGHT CONNECTION WITH EXTENSION POWER BOARD INCLUDING POWER CABLE
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ALUMINIUM PARTITION WITH MATERIAL AND LABOUR CHARGES | ALUMINIUM PARTITION WITH MATERIAL AND LABOUR CHARGES | 380 | sqft | gill_92 | 15 | |
| 2 | FLOOR CARPET | FLOOR CARPET | 190 | sqft | gill_92 | 15 | |
| 3 | SPLIT AC 2 TON 3 STAR | SPLIT AC 2 TON 3 STAR | 1 | nos | gill_92 | 15 | |
| 4 | CEILING FAN | CEILING FAN | 2 | nos | gill_92 | 15 | |
| 5 | LIGHT CONNECTION WITH EXTENSION POWER BOARD INCLUDING POWER CABLE | LIGHT CONNECTION WITH EXTENSION POWER BOARD INCLUDING POWER CABLE | 1 | job | gill_92 | 15 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Physical sample of item to be submitted before technical bid opening
Key insights about UTTAR PRADESH tender market
Bidders should prepare PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation; submit a physical sample before technical bid opening; anticipate 25% quantity variation and compute delivery timelines accordingly; verify EMD requirements and payment terms in the bid document.
Submit PAN card, GST certificate, cancelled cheque, EFT mandate, and the physical item sample; ensure the sample is presented before the technical bid opening. Additional vendor code documents may include financial statements and identity proofs per ATC terms.
Delivery starts after the last date of the original delivery order; quantity may be increased up to 25% during the contract with extended delivery time calculated as (additional/original) × original period, minimum 30 days.
The tender specifies a Split AC of 2 Ton 3 Star rating as part of the electrical scope along with aluminium partition work; ensure unit compatibility with room dimensions and power supply specifications per site.
A physical sample of the item must be submitted prior to opening the technical bid; ensure the sample matches described scope: aluminium partition components, floor carpet installation, and integrated electrical fittings.
Scope includes aluminium partition with materials and labour, floor carpeting, a 2 Ton 3 Star split AC, ceiling fans, and light connections with an extension power board and power cable; all integrated under one procurement contract.
Payment terms are not explicitly stated in the provided data; bidders should check the official bid terms for milestones, advance payments, and settlement timelines at contract award and delivery completion.
Quantity variation up to 25% can extend delivery; new timeline = (additional quantity/original quantity) × original delivery period, with a minimum extension of 30 days, potentially affecting site readiness and scheduling.