Speedometer cable,Light black out,Latch Assy RH,Door lock rear gate,Bulb 24v,Dual brake valve,Brake
Indian Army
Ajmer, RAJASTHAN
Progress
Quantity
3
Category
Regular control electronic engine
Bid Type
Two Packet Bid
Organization: Indian Army (Department of Military Affairs) operating in Kamrup, Assam 781001. Procures three categories under one tender: Regular control electronic engine, Speedometer cable, and Lock Assembly Gate LH. No BOQ quantity provided and no explicit estimated value published. Tender terms include an option to adjust quantity up to 25% during contract and extended periods. A key differentiator is the requirement for advance sample approval prior to bulk production, with a strict five-day window. The framework supports supply aligned to approved samples at contract rates, reducing risk of non-conforming batches.
Product categories: Regular control electronic engine components, Speedometer cables, Lock Assembly Gate LH
Quantities: Not disclosed in BOQ; subject to 25% option clause
EMD/Estimated value: Not specified in provided excerpt
Delivery: Schedule governed by original delivery period with option-based adjustments (minimum 30 days)
Quality/Testing: Advance sample approval required prior to bulk manufacturing
Option Clause: quantity may vary ±25% at contract placement and during currency
Advance sample: 5-day submission from award; must meet contract specs or be modified
Delivery: extended delivery time calculated using (increase/original) × original period with minimum 30 days
Purchaser may increase/decrease quantity up to 25% at contract placement and during currency; delivery period recalculated with minimum 30 days
Successful bidder must submit 1 advance sample within 5 days; buyer to approve or request modifications within 5 days; bulk supply must follow approved sample
All samples required for testing are supplied by the contractor free of cost; pre-approval costs borne by seller if early bulk production occurs
Ability to meet advance sample submission timeline (5 days from award)
Capability to adjust quantities up to 25% of bid quantity
Willingness to provide OEM authorizations and technical compliance documents
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Ajmer, RAJASTHAN
Indian Army
DARJEELING, WEST BENGAL
Indian Army
DIMAPUR, NAGALAND
Indian Army
BIKANER, RAJASTHAN
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar procurement (if any)
Financial statements demonstrating financial capability
EMD/Security deposit documentation (if applicable in the full tender terms)
Technical bid documents showing compliance with requested samples process
OEM authorization letters (if required for branded items)
Key insights about ASSAM tender market
Bidders must submit technical and commercial bids, ensure OEM authorizations if branded items are included, and comply with the advance sample requirement: one sample within 5 days of award. Prepare to address quantity adjustments up to 25% and confirm delivery timelines aligned with original and possible extensions. Ensure GST, PAN, and financial documents are ready.
Required documents include GST certificate, PAN card, experience certificates for similar work, financial statements, and any OEM authorizations. Also prepare technical bid documents showing compliance with the advance sample process and any requested certifications or standards.
Delivery terms hinge on the original delivery period with potential extension. If quantities increase, the added time equals (additional quantity/original quantity) × original period, minimum 30 days. Delays in sample approval from the buyer can extend the delivery period without LD penalties.
The purchaser may increase or decrease awarded quantity by up to 25% at contract placement and during the currency. The delivery timeline is recalculated accordingly, with a minimum 30-day extension, enabling flexible production planning but requiring readiness to scale production.
Submit 1 advance sample within 5 days of award. The buyer will approve or specify modifications within 5 days. If approved, you must supply bulk quantities per the approved sample; delays in approval may reset the delivery period, and non-conforming samples could lead to contract termination.
The tender excerpt does not specify standards. Bidder should confirm whether ISI, ISO, or OEM-specific certifications are required during bid clarification and gather any certification evidence for the supplied components.
Payment terms are not detailed in the excerpt; bidders should seek clarification during bid submission and ensure readiness to negotiate milestones tied to delivery, sample approval, and acceptance of bulk quantities after quality checks.
If the buyer delays approval, the delivery period may be refixed without liquidated damages for the period of delay. Ensure clear records of submission dates and buyer responses to minimize disputes over timelines.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS