Bid Publish Date
03-Oct-2026, 1:54 pm
Bid End Date
13-Oct-2026, 2:00 pm
Progress
The procurement is issued by the Ordnance Equipment Factory, Kanpur (a unit of Troop Comforts Limited), under the Department of Defence Production. The item is POLYTHENE FILM OF SIZE -0.04 MM THICK X 120 CMS WIDE FOR PACKING, with an estimated quantity of 8716 Meters. Bidders must be Indian MSE manufacturers, provide UAM details, and be registered for the tendered item with OEFC or sister Ordnance factories. 100% allocation to the L-1 bidder, delivery FOR OEF Kanpur within 30 days. This requires strict conformity to the buyer-specified specifications uploaded on the GeM portal and no deviations. This tender emphasizes Make in India and strategic distribution guidelines.
Product/service: Polythene film for packing
Thickness: 0.04 mm
Width: 120 cm
Quantity: 8716 meters
Delivery: 30 days from order date
Delivery location: OEF Kanpur (FOR)
Registration/eligibility: Indian MSE with UAM; OEFC/sister factory registration
Compliance: strict conformance to TE drawings and PO specifications
EMD: not explicitly stated; ensure MSE benefits through UAM/document proof
Delivery: 30 days, FOR OEF Kanpur; 100% quantity to L-1
Price: firm and fixed as per GeM portal; no variation post bid
Delivery should be completed within 30 days from order and 100% quantity delivered to OEF Kanpur on FOR basis.
Bidders must be Indian MSE with valid UAM number and registered for Polythene Film/Bag with OEFC or sister factories.
Technical Bid to be submitted without price; price to be quoted firm on GeM portal; signed TE specifications uploaded.
Indian MSE manufacturer with valid UAM number
Registered for polythene film/bag with OEFC or sister Ordnance factories
Competent to supply polythene film meeting TE drawings and GeM specifications
Quantity
8716
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Warranty Period
45 days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
POLYTHENE FILM OF SIZE -0.04 MM THICK X 120 CMS WIDE FOR PACKING
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
KANPUR CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | KANPUR CITY | KANPUR CITY | - | - | 8716 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for polythene film/bag supply
Financial statements (last 2-3 years)
EMD/Security deposit document (as applicable per tender terms)
Technical bid documents with no price disclosure
OEM authorization (if applicable)
UAM number proof for MSE status
Registration proof for tendered item with OEFC or sister factories
Bidders must be Indian MSE with UAM, register for polythene film with OEFC or sister factories, submit technical bid without price, and quote firm prices on GeM portal. Ensure 30-day delivery FOR OEF Kanpur and 8716 meters quantity. Include OEM authorizations and TE-compliant drawings.
Submit GST, PAN, last 2-3 years financials, experience certificates for film supply, UAM proof for MSE status, OEM authorization (if applicable), and EMD documentation. Include tech bid with TE drawings signed by bidder.
The film must be 0.04 mm thick and 120 cm wide. Total quantity 8716 meters. Delivery within 30 days to OEF Kanpur on an FOR basis; conform to TE drawings uploaded on GeM.
Delivery must be completed within 30 days from order date, with 100% quantity delivered to OEF Kanpur. Follow TCLPM-2024 distribution guidelines if applicable and ensure L-1 allocation rules.
Prices must be firm as per GeM portal. Payment terms align with GEM standard; details will be specified in official PO, typically after delivery receipt and acceptance at OEF Kanpur.
Bidders must be Indian MSE with valid UAM and registered for Polythene Film/Bag with OEFC or a sister Ordnance factory; non-registered firms may have their offers ignored at opening.
Download buyer specifications uploaded to GeM, sign them, and upload signed copies in seller specification fields. Any variation may lead to rejection; strict conformity to PO drawings and TE is mandatory.