Knuckle Brg,Seal Front Oil,Wiper Blade,Absorber Assy Front Shock,Major Repair Kit Air Compressor,Oi
Indian Army
DEHRADUN, UTTARAKHAND
Progress
Quantity
24
Category
Bush Brass Kin Pin
Bid Type
Two Packet Bid
The procurement is issued by the Indian Army (Department Of Military Affairs) for a set of mechanical and hydraulic spares, including Bush Brass Kin Pin, Kit Starter Motor, Wiper assemblies, Air hoses, Oil seals, Brake fluids, Clutch release bearings, Wiper motors (24V), Crank position sensors, and related components. The BOQ comprises 17 items, with no explicit unit quantities disclosed. An ISO 9001 certification requirement applies to bidders or OEMs. An option clause permits up to 25% quantity variation at contract award and during contract currency at contracted rates. The RFP emphasizes advance sample approvals before bulk manufacturing and a potential delivery schedule adjustment if samples are delayed. The location and end-user context are not specified in the excerpt.
Key requirements include:
Product/service names: Bush Brass Kin Pin, Kit Starter Motor, Drying and Disrtli Unit HI PR Voss, Assy Wiper Arm, Hose Assy Air, Air Filter, Wiper Motor 24V, Crank Position Sensor, Oil Seal Single Lip, Assy Taper Roller Bearing, Wheel Cylinder 22.22D RR
Quantity: 17 items in BOQ; exact quantities not disclosed
Standards: ISO 9001 certification required for bidder or OEM
Delivery: Depends on sample approval; extension possible via option clause
Quality/Testing: Advance sample approved before bulk manufacturing; deviations may lead to fresh samples or termination
Advance sample approval within 5 days of contract award; 2 samples required
Option clause permits up to 25% quantity variation at contracted rates
ISO 9001 certification mandatory for bidder or OEM
Not explicitly disclosed; contract allows variation with option clause and standard procurement terms
Delivery period may extend if sample approval is delayed; extension computed as (increased quantity / original quantity) × original delivery period, minimum 30 days
Liquidated damages tie to timely delivery; delays due to buyer sample approval do not incur LD during extended period
Must hold ISO 9001 certification (bidder or OEM)
Must submit PAN, GSTIN, cancelled cheque, and EFT mandate
Must comply with advance sample approval process and contract terms
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
ALLAHABAD, UTTAR PRADESH
Indian Army
Indian Army
EAST SIKKIM, SIKKIM
Indian Army
NORTH 24 PARGANAS, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Bush Brass Kin Pin | Bush Brass Kin Pin | 4 | nos | hemant6002 | 20 |
| 2 | Kit Starter Motor | Kit Starter Motor | 1 | nos | hemant6002 | 20 |
| 3 | Drying and Disrti Unit HI PR Voss | Drying and Disrti Unit HI PR Voss | 1 | nos | hemant6002 | 20 |
| 4 | Assy Wiper Arm | Assy Wiper Arm | 4 | nos | hemant6002 | 20 |
| 5 | Hose Assy Air | Hose Assy Air | 1 | nos | hemant6002 | 20 |
| 6 | Air Filter Element BS 3-4-6 | Air Filter Element BS 3-4-6 | 1 | nos | hemant6002 | 20 |
| 7 | Assy Slave Cylinder BS 3-4-6 | Assy Slave Cylinder BS 3-4-6 | 1 | nos | hemant6002 | 20 |
| 8 | Wiper Lever repair Kit | Wiper Lever repair Kit | 1 | nos | hemant6002 | 20 |
| 9 | Assy Blade Wiper | Assy Blade Wiper | 1 | nos | hemant6002 | 20 |
| 10 | Assy Blade Wiper | Assy Blade Wiper | 2 | nos | hemant6002 | 20 |
| 11 | Brake Fluid Container | Brake Fluid Container | 1 | nos | hemant6002 | 20 |
| 12 | Clutch Release Bearing | Clutch Release Bearing | 1 | nos | hemant6002 | 20 |
| 13 | Wiper Motor 24V | Wiper Motor 24V | 1 | nos | hemant6002 | 20 |
| 14 | Crank Pos Sensor | Crank Pos Sensor | 1 | nos | hemant6002 | 20 |
| 15 | Oil Seal Single Lip | Oil Seal Single Lip | 1 | nos | hemant6002 | 20 |
| 16 | Assy Taper Roller Brg | Assy Taper Roller Brg | 1 | nos | hemant6002 | 20 |
| 17 | Wheel Cyl 22.22D RR | Wheel Cyl 22.22D RR | 1 | nos | hemant6002 | 20 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
ISO 9001 certification documents (for bidder or OEM)
Advance sample submission and approval documentation
Any OEM authorizations or technical compliance certificates referenced in T&C
Key insights about PUNJAB tender market
Bidders must meet ISO 9001 certification, submit PAN, GSTIN, cancelled cheque, and EFT mandate. Provide 2 advance samples within 5 days of award, and comply with the contract's 25% quantity option. Ensure supply aligns with approved samples and contract framework.
Submit PAN card copy, GSTIN, cancelled cheque, and EFT mandate certified by bank. Also include ISO 9001 certification if bidder or OEM. Prepare OEM authorizations and any technical compliance certificates referenced in T&C for vendor code creation.
Delivery depends on advance sample approval; if approved late, the delivery period is reset without LD for the delay. The option clause allows up to 25% quantity variation at contracted rates during/after contract with adjustments based on original delivery period.
Contract winner must furnish 2 advance samples within 5 days of award. Buyer approves or lists required modifications within 5 days. Bulk supply must follow approved sample; deviations may trigger fresh samples or contract termination.
The purchaser may increase/decrease quantity up to 25% at contract award and during the contract at contracted rates. Additional time is calculated as (increased quantity / original quantity) × original delivery period, with a minimum of 30 days.
ISO 9001 certification is mandatory for bidder or OEM. Ensure all offered components meet this standard and attach relevant certificates. Compliance with the contract framework and sample approval process is essential for bulk supply eligibility.
BOQ lists 17 items including Bush Brass Kin Pin, Kit Starter Motor, Wiper Arm assemblies, Air hoses, Air filters, Wiper motors (24V), Crank position sensors, Oil seals, Taper roller bearings, and Wheel Cylinders. Exact quantities are not disclosed in the excerpt.
Delivery timelines hinge on sample approval. If approval is delayed by the buyer, the delivery period is adjusted without LD for the delay. Once approved, bulk manufacturing proceeds per the contract framework and approved specifications.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS