Work of SETC of 6 Nos of 200 KVA DTC along with associated 11KV 300 sqmm UG cable and LT line to connect to the existing LT network to solve low voltage problem at various places in Siolim ,Sub Division III, Agarwada, Division.XVII, Mapusa.
N/A
NORTH GOA, GOA