Open Tender for evapouration fabrication work 1,evapouration fabrication work 2,evapouration fabrication work 3,eva in BIJNOR, UTTAR PRADESH

Bid Publish Date

25-Aug-2026, 12:36 pm

Bid End Date

04-Sep-2026, 1:00 pm

EMD

₹9,000

Value

₹9,10,000

Location

BIJNOR , UTTAR PRADESH

Progress

Issue25-Aug-2026, 12:36 pm
AwardPending

Public procurement opportunity for N/a evapouration fabrication work 1, evapouration fabrication work 2, evapouration fabrication work 3, evapouration fabrication work 4, evapouration fabrication work 5, evapouration fabrication work 6, evapouration fabrication work 7, evapouration fabrication work 8, evapouration fabrication work 9, evapouration fabrication work 10, evapouration fabrication work 11, evapouration fabrication work 12, evapouration fabrication work 13, evapouration fabrication work 14, evapouration fabrication work 15, evapouration fabrication work 16, evapouration fabrication work 17, evapouration fabrication work 18, evapouration fabrication work 19, evapouration fabrication work 20, evapouration fabrication work 21, evapouration fabrication work 22, evapouration fabrication work 23, evapouration fabrication work 24, evapouration fabrication work 25, evapouration fabrication work 26, evapouration fabrication work 27, evapouration fabrication work 28, evapouration fabrication work 29, evapouration fabrication work 30, evapouration fabrication work 31, evapouration fabrication work 32, evapouration fabrication work 33, evapouration fabrication work 34, evapouration fabrication work 35, evapouration fabrication work 36, evapouration fabrication work 37, evapouration fabrication work 38, evapouration fabrication work 39, evapouration fabrication work 40, evapouration fabrication work 41, evapouration fabrication work 42, evapouration fabrication work 43, evapouration fabrication work 44, evapouration fabrication work 45, evapouration fabrication work 46, evapouration fabrication work 47, evapouration fabrication work 48, evapouration fabrication work 49, evapouration fabrication work 50, evapouration fabrication work 51, evapouration fabrication work 52, evapouration fabrication work 53, evapouration fabrication work 54, evapouration fabrication work 55, evapouration fabrication work 56, evapouration fabrication work 57, evapouration fabrication work 58, evapouration fabrication work 59, evapouration fabrication work 60, evapouration fabrication work 61 in BIJNOR, UTTAR PRADESH. Quantity: 7645 issued by. Submission Deadline: 04-09-2026 13: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

7645

Category

evapouration fabrication work 1

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

4

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

evapouration fabrication work 1 , evapouration fabrication work 2 , evapouration fabrication work 3 , evapouration fabrication work 4 , evapouration fabrication work 5 , evapouration fabrication work 6 , evapouration fabrication work 7 , evapouration fabrication work 8 , evapouration fabrication work 9 , evapouration fabrication work 10 , evapouration fabrication work 11 , evapouration fabrication work 12 , evapouration fabrication work 13 , evapouration fabrication work 14 , evapouration fabrication work 15 , evapouration fabrication work 16 , evapouration fabrication work 17 , evapouration fabrication work 18 , evapouration fabrication work 19 , evapouration fabrication work 20 , evapouration fabrication work 21 , evapouration fabrication work 22 , evapouration fabrication work 23 , evapouration fabrication work 24 , evapouration fabrication work 25 , evapouration fabrication work 26 , evapouration fabrication work 27 , evapouration fabrication work 28 , evapouration fabrication work 29 , evapouration fabrication work 30 , evapouration fabrication work 31 , evapouration fabrication work 32 , evapouration fabrication work 33 , evapouration fabrication work 34 , evapouration fabrication work 35 , evapouration fabrication work 36 , evapouration fabrication work 37 , evapouration fabrication work 38 , evapouration fabrication work 39 , evapouration fabrication work 40 , evapouration fabrication work 41 , evapouration fabrication work 42 , evapouration fabrication work 43 , evapouration fabrication work 44 , evapouration fabrication work 45 , evapouration fabrication work 46 , evapouration fabrication work 47 , evapouration fabrication work 48 , evapouration fabrication work 49 , evapouration fabrication work 50 , evapouration fabrication work 51 , evapouration fabrication work 52 , evapouration fabrication work 53 , evapouration fabrication work 54 , evapouration fabrication work 55 , evapouration fabrication work 56 , evapouration fabrication work 57 , evapouration fabrication work 58 , evapouration fabrication work 59 , evapouration fabrication work 60 , evapouration fabrication work 61

Advisory Bank

PUNJAB NATIONAL BANK

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Bijnor

Delivery Pincodes

246763

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anurag Singh246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612BijnorUttar Pradesh2467632460-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9794972.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 61 Items Sign in for GEM prices

#1

evapouration fabrication work 1

Evaporation House Dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (8inch)

24 pcdm Delivery: 60 days
#2

evapouration fabrication work 2

Evaporation House Dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (6inch)

55 pcdm Delivery: 60 days
#3

evapouration fabrication work 3

Evaporation House Dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (4inch)

48 pcdm Delivery: 60 days
#4

evapouration fabrication work 4

Evaporation House Dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (2inch)

36 pcdm Delivery: 60 days
#5

evapouration fabrication work 5

Evaporation House Fabricating and installing bends at various locations (8inch)

5 pcdn Delivery: 60 days
#6

evapouration fabrication work 6

Evaporation House Fabricating and installing bends at various locations (6inch)

8 pcdn Delivery: 60 days
#7

evapouration fabrication work 7

Evaporation House Fabricating and installing bends at various locations (4inch)

8 pcdn Delivery: 60 days
#8

evapouration fabrication work 8

Evaporation House Fabricating and installing bends at various locations (3inch)

6 pcdn Delivery: 60 days
#9

evapouration fabrication work 9

Evaporation House Fabricating and installing bends at various locations (2inch)

6 pcdn Delivery: 60 days
#10

evapouration fabrication work 10

Evaporation House Fabricating and installing flanges at various locations (24inch)

2 pcdn Delivery: 60 days
#11

evapouration fabrication work 11

Evaporation House Fabricating and installing flanges at various locations (10inch)

6 pcdn Delivery: 60 days
#12

evapouration fabrication work 12

Evaporation House Fabricating and installing flanges at various locations (8inch)

12 pcdn Delivery: 60 days
#13

evapouration fabrication work 13

Evaporation House Fabricating and installing flanges at various locations (6inch)

28 pcdn Delivery: 60 days
#14

evapouration fabrication work 14

Evaporation House Fabricating and installing flanges at various locations (4inch)

4 pcdn Delivery: 60 days
#15

evapouration fabrication work 15

Evaporation House Fabricating and installing flanges at various locations (2inch)

10 pcdn Delivery: 60 days
#16

evapouration fabrication work 16

Evaporation House Fabricating and installing nipples at various locations (800 mm)

1 pcdn Delivery: 60 days
#17

evapouration fabrication work 17

Evaporation House Fabricating and installing nipples at various locations (10inch)

4 pcdn Delivery: 60 days
#18

evapouration fabrication work 18

Evaporation House Fabricating and installing nipples at various locations (8inch)

8 pcdn Delivery: 60 days
#19

evapouration fabrication work 19

Evaporation House Fabricating and installing nipples at various locations (6inch)

6 pcdn Delivery: 60 days
#20

evapouration fabrication work 20

Evaporation House Fabricating and installing nipples at various locations (4inch)

6 pcdn Delivery: 60 days
#21

evapouration fabrication work 21

Evaporation House Fabricating and installing nipples at various locations (3inch)

6 pcdn Delivery: 60 days
#22

evapouration fabrication work 22

Evaporation House Opening and closing valves at various locations (8inch)

6 pcdn Delivery: 60 days
#23

evapouration fabrication work 23

Evaporation House Opening and closing valves at various locations (6inch)

2 pcdn Delivery: 60 days
#24

evapouration fabrication work 24

Evaporation House Opening and closing valves at various locations (4inch)

2 pcdn Delivery: 60 days
#25

evapouration fabrication work 25

Evaporation House Opening and closing valves at various locations (3inch)

2 pcdn Delivery: 60 days
#26

evapouration fabrication work 26

Evaporation House Opening and closing valves at various locations (2inch)

2 pcdn Delivery: 60 days
#27

evapouration fabrication work 27

Evaporation House Fabricating and installing a tee (4inch)

2 pcdn Delivery: 60 days
#28

evapouration fabrication work 28

Vapor Cell/Quad Body Remove old brass/S.S. tubes, weigh them, place them in the store/specified location, fit and expand the tubes, and carry out a satisfactory hydraulic test at 75 to 100 PSI (Tube size 42 x 45 x 2010 mm).

3,606 per tube Delivery: 60 days
#29

evapouration fabrication work 29

Vapor Cell/Quad Body Fit new brass/S.S. tubes, expand them, and carry out a satisfactory hydraulic test at 75to100 PSI (Tube size 42 x 45 x 2010 mm).

3,606 per tube Delivery: 60 days
#30

evapouration fabrication work 30

Hydraulically test of various bodies and give satisfactory trial at 75 to 100 P.S.I.

2 each Delivery: 60 days
#31

evapouration fabrication work 31

Juice Heater Remove the installed 400 mm diameter valve and fabricate approximately 5 meters of 400 mm diameter pipeline from a 10 mm plate, install it with the valve in the calandria, and carry out a satisfactory trial.

2 each Delivery: 60 days
#32

evapouration fabrication work 32

Juice Weighing (Round Tank) Cut out and remove the damaged shell, dispose of it in the scrap yard, fabricate a new shell from an 8/10 mm thick plate, install it, reconnect all related connections, and carry out a leak-proof trial. (Height 1.35 m, diameter 2.66 m, channel size 200 mm)

1 lumpsum Delivery: 60 days
#33

evapouration fabrication work 33

Raw Juice Pump Cut out and remove the damaged 14inch header, fabricate and install a new header, reconnect all related connections, and carry out a leak-proof trial.

1 each header Delivery: 60 days
#34

evapouration fabrication work 34

Raw Juice Receiving Tank Cut out and remove the damaged shell, dispose of it in the scrap yard, fabricate a new shell from an 8/10 mm thick plate, install it, and carry out a leak-proof trial. Diameter 3.5 m x Height 3.0 m.

1 lumpsum Delivery: 60 days
#35

evapouration fabrication work 35

Vapor Cell 950 sq. m and old Quad Body No. 4 Remove damaged sections of the sidewall and umbrella, fabricate and install new parts, and conduct a trial. Approx. 2 m (Size 2 x 2.0 m).

2 each Delivery: 60 days
#36

evapouration fabrication work 36

New Quad Bodies No. 1 and 2 Remove damaged sections of the sidewall and umbrella, fabricate and install new parts, and conduct a trial. Approx. 2 m (Size 1 x 1.5 m).

2 each Delivery: 60 days
#37

evapouration fabrication work 37

Fabricate an M.S. bed for the syrup pump and motor, complete fitting and alignment, and carry out a satisfactory trial. 25HP

2 per hp Delivery: 60 days
#38

evapouration fabrication work 38

Old Set Vertical Line Juice Heater and Quad Body No. 4 Dismantle the damaged condensate bottle, dispose of it in the scrap yard, fabricate a new one from an 8/10 mm plate, complete all connections, and carry out a satisfactory vacuum trial.

2 each Delivery: 60 days
#39

evapouration fabrication work 39

Dismantle the 800 mm diameter exhaust pipeline below the turbine, including nipple, bend, and flange, and dispose of it in the scrap yard.

3 per ton Delivery: 60 days
#40

evapouration fabrication work 40

Fabricate a new 800 mm diameter exhaust pipeline below the turbine from a 10/12 mm plate, install it in position, and carry out a satisfactory trial.

6 per ton Delivery: 60 days
#41

evapouration fabrication work 41

Dismantle 800 mm diameter exhaust pipeline below the Vapor Cell 950 sq. m , dispose of in scrap yard

2 per ton Delivery: 60 days
#42

evapouration fabrication work 42

Fabricate and install an 800 mm diameter exhaust pipeline below the Vapor Cell 950 sq. m using a 12 mm plate, and carry out a satisfactory trial.

3 per ton Delivery: 60 days
#43

evapouration fabrication work 43

Fabricate and install an 800 mm diameter tee for the exhaust pipeline below the Vapor Cell 950 sq. m using a 12 mm plate, and carry out a satisfactory trial.

1 pcdn Delivery: 60 days
#44

evapouration fabrication work 44

Fabricate and install an 800 mm diameter dummy/flange for the exhaust pipeline from a 12 mm plate and carry out a satisfactory trial.

4 each Delivery: 60 days
#45

evapouration fabrication work 45

Semikestner 1000 sq. m Dismantle the damaged portion of the vapor saucer, dispose of the scrap in the scrap yard, fabricate a replacement from a 12 mm thick plate, reconnect all related connections, and carry out a satisfactory trial. Size Diameter 3.4 m.

1 lumpsum Delivery: 60 days
#46

evapouration fabrication work 46

Old Quad Bodies No. 2 and 3 Dismantle the damaged portion of the 20inch vapor pipe, dispose of the scrap in the scrap yard. Length 16 m.

1 per ton Delivery: 60 days
#47

evapouration fabrication work 47

Old Quad Bodies No. 2 and 3 20inch vapor pipe, fabricate and install a replacement from an 8 mm thick plate, and carry out a satisfactory trial. Length 16 m.

2 per ton Delivery: 60 days
#48

evapouration fabrication work 48

Dismantlling the 32inch size valve of the vapor pipe of the 1000 sq. m. vapor cell.

1 pcdn Delivery: 60 days
#49

evapouration fabrication work 49

Erection 32inch size valve of the vapor pipe of the 1000 sq. m. vapor cell.

1 pcdn Delivery: 60 days
#50

evapouration fabrication work 50

Juice Heater Header Remove all partition plates by cutting, thoroughly clean the tube plate, fabricate and install new circular and straight partition plates from a 10/12 mm plate, prepare the header as before using M.S. strips, fit rubber strips, and carry out a satisfactory trial.

3 each header Delivery: 60 days
#51

evapouration fabrication work 51

Semi Kestner 800 sq. m Cut out and remove the damaged portion of the steam jacket, dispose of it in the scrap yard, fabricate a replacement from an 8 mm plate, install it in position, and carry out a satisfactory trial.

1 lumpsum Delivery: 60 days
#52

evapouration fabrication work 52

New Quad Set Dismantle the 800 mm vapor pipe. Approx. 34 m.

3 per ton Delivery: 60 days
#53

evapouration fabrication work 53

New Quad Set 800 mm vapor pipe, fabricate a replacement from a new 8/10 mm plate, install it in position, and carry out a satisfactory trial. Approx. 34 m.

7 per ton Delivery: 60 days
#54

evapouration fabrication work 54

New Quad No. 2 Dismantle the 600 mm vapor pipeline. Length 10 m.

1 per ton Delivery: 60 days
#55

evapouration fabrication work 55

New Quad No. 2 600 mm vapor pipeline and fabricate and install a replacement from an 8/10 mm thick plate. Length 10 m.

1 per ton Delivery: 60 days
#56

evapouration fabrication work 56

Juice Heater Dismantle the incoming and outgoing boxes, heater shell, and partition plate between the double-beat valve and the heater header, fabricate new components from a 12/10 mm plate as before, install them, and carry out a satisfactory trial.

6 each box Delivery: 60 days
#57

evapouration fabrication work 57

New Quad Body No. 4 Dismantle the damaged external catcher/vapor body section and corroded angle channel, dispose of the scrap in the scrap yard, fabricate a new catcher from a 10 mm thick plate, install it in position, complete all connections, and carry out a satisfactory trial. Diameter 1.6 m, Length 6.2 m.

1 each Delivery: 60 days
#58

evapouration fabrication work 58

ETP House Dismantling damaged pipelines at various locations, disposing of them in the scrap yard, and installing new pipelines (6inch)

20 pcdm Delivery: 60 days
#59

evapouration fabrication work 59

ETP House Fabricating and installing bends at various locations (4inch)

4 pcdn Delivery: 60 days
#60

evapouration fabrication work 60

Aeration Tank Dismantle the installed diffuser, dispose of it in the scrap yard, and replace the damaged portion.

40 each Delivery: 60 days
#61

evapouration fabrication work 61

Sulphate Removal Plant Reaction Chamber Dismantle the damaged 6 mm partition plate, dispose of it in the scrap yard, and fabricate and install a new partition plate from an 8 mm plate.

1 lumpsum Delivery: 60 days

Categories 45

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer