Bid Publish Date
01-Sep-2026, 7:39 pm
Bid End Date
11-Sep-2026, 8:00 pm
Progress
Organization: Indian Army (Department Of Military Affairs). Procurement covers a range of automotive and mechanical components including BULB 24V 5W, MASTER CYL KIT, DOOR TRIM PANNEL RH, MUD FLAP, WEATHER STRIP, WEATHER STRIPS, RUBBER BOOT, BUZZER, AIR HORN ASSY, HOSE 8X400-HV-IM, and POLY V BELT. The tender lists 11 items in the BOQ with unspecified quantities, but indicates a multi-item supply contract. A 1-year OEM warranty is required, and installation/commissioning support must be available in India. An option clause allows up to 25% quantity variation, with corresponding delivery-time recalculation. The bidder must demonstrate prior defence-related supply experience and submit samples within 4 days of bid publish.
BULB 24V 5W
MASTER CYL KIT
DOOR TRIM PANEL RH
MUD FLAP
WEATHER STRIP / WEATHER STRIPS
RUBBER BOOT
BUZZER
AIR HORN ASSY
HOSE 8X400-HV-IM
POLY V BELT
1-year OEM warranty
25% quantity variation right during contract with proportional delivery extension
OEM turnover criteria based on last 3 financial years with audited or CA-certified evidence
1-year warranty from final acceptance or after installation, with service network in India
Sample submission within 4 days of bid publish; defense experience required
Terms to be as per buyer ATC; includes any advance, milestone, or release on delivery per contract norms.
Delivery period to commence from last date of original delivery order; option-based extensions governed by the 25% quantity clause.
Liquidated damages to be as per standard defence procurement rules; details to be confirmed in bidder's ATC.
Defence procurement experience with similar automotive/electrical components
OEM turnover meeting last 3 years criteria
Authorized OEM/dealer for required items with evidence
Presence of service centers in India near consignee locations
Quantity
134
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
BULB 24V 5W , MASTER CYL KIT , DOOR TRIM PANNEL RH , MUD FLAP , WEATHER STRIP , WEATHER STRIPS , RUBBER BOOT , BUZZER , AIR HORN ASSY , HOSE 8X400-HV-IM , POLY V BELT
Max Delivery Days
20
Delivery Locations
1
Delivery Cities
LEH
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | LEH | LEH | - | - | 40 | 20 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
BULB 24V 5W
BULB 24V 5W
MASTER CYL KIT
MASTER CYL KIT
DOOR TRIM PANNEL RH
DOOR TRIM PANNEL RH
MUD FLAP
MUD FLAP
WEATHER STRIP
WEATHER STRIP
WEATHER STRIPS
WEATHER STRIPS
RUBBER BOOT
RUBBER BOOT
BUZZER
BUZZER
AIR HORN ASSY
AIR HORN ASSY
HOSE 8X400-HV-IM
HOSE 8X400-HV-IM
POLY V BELT
POLY V BELT
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | BULB 24V 5W | BULB 24V 5W | 40 | nos | ananthan@902adwksp | 20 | |
| 2 | MASTER CYL KIT | MASTER CYL KIT | 10 | nos | ananthan@902adwksp | 20 | |
| 3 | DOOR TRIM PANNEL RH | DOOR TRIM PANNEL RH | 11 | nos | ananthan@902adwksp | 20 | |
| 4 | MUD FLAP | MUD FLAP | 32 | nos | ananthan@902adwksp | 20 | |
| 5 | WEATHER STRIP | WEATHER STRIP | 8 | nos | ananthan@902adwksp | 20 | |
| 6 | WEATHER STRIPS | WEATHER STRIPS | 8 | nos | ananthan@902adwksp | 20 | |
| 7 | RUBBER BOOT | RUBBER BOOT | 11 | nos | ananthan@902adwksp | 20 | |
| 8 | BUZZER | BUZZER | 10 | nos | ananthan@902adwksp | 20 | |
| 9 | AIR HORN ASSY | AIR HORN ASSY | 2 | nos | ananthan@902adwksp | 20 | |
| 10 | HOSE 8X400-HV-IM | HOSE 8X400-HV-IM | 1 | nos | ananthan@902adwksp | 20 | |
| 11 | POLY V BELT | POLY V BELT | 1 | nos | ananthan@902adwksp | 20 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA certificate showing OEM turnover for last 3 years
OEM authorization / dealership certificate
Technical bid document
Product samples as per bid requirement within 4 days
Experience certificates showing previous defence organization supply
Warranty certificates from OEM
Installation, commissioning, training and service capability documents
Any other T&C-specific documents requested by ATC
Bidders must demonstrate prior supply to defence organizations, submit samples within 4 days, and provide OEM turnover evidence (audited statements or CA certificate) for the last 3 financial years. Include OEM authorization and service network details in India, with warranty documentation.
Submit GST, PAN, audited turnover or CA certificate for OEM, OEM authorization, technical bid, experience certificates, EMD proof, and installation/maintenance capability documents. Provide product samples within 4 days and warranty certificates from OEM at delivery.
The BOQ includes BULB 24V 5W, MASTER CYL KIT, DOOR TRIM PANEL RH, MUD FLAP, WEATHER STRIP, RUBBER BOOT, BUZZER, AIR HORN ASSY, HOSE 8X400-HV-IM, and POLY V BELT; 11 items total with unspecified quantities.
A 1-year OEM warranty is required from final acceptance or post-installation, with certificates to be supplied at delivery. The seller must ensure fault rectification during the warranty period and provide service support in India.
The buyer may increase quantity up to 25% during contract, with delivery time adjusted by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Original delivery period may be extended but not beyond the extended total.
Provide an audited balance sheet or a CA certificate showing the average turnover for the last three financial years. If the OEM is younger than 3 years, use completed years after incorporation for turnover calculation.
Submit required item samples within 4 days of bid publication to the technical committee for approval. Samples must match exact item specifications and accompany necessary documentation for evaluation.
The seller must establish an installation, commissioning, training, troubleshooting, and maintenance service group in INDIA, with service centers near consignee destinations and documented coverage.