Tender Overview

National Aluminium Company Limited (NALCO), Bhubaneswar, invites bids for Supply Installation Testing and Commissioning of Goods at Angul, Odisha (759037). The scope includes delivery, installation, testing, and commissioning with an option to adjust quantity up to 25%. The contract contemplates a phased payment plan with 85% on receipt/acceptance and 15% post-installation. The tender accommodates standard packing to prevent transit damage, and requires fitment and interchangeability certificates, plus a 12-month warranty on spares or 18 months from receipt/acceptance. This procurement emphasizes installation readiness within one month of material receipt and completion within two months after acceptance, under specific ATC clauses that govern timelines and quality assurances. The BOQ lists five items, though exact quantities are not disclosed, signaling a broad equipment/spares package.

Technical Specifications & Requirements

  • Scope: Supply, installation, testing and commissioning of goods
  • Delivery/Installation window: Front end site access within 01 month of receipt; complete installation within 02 months after acceptance
  • Warranty: Standard warranty on all spares for 12 months from installation or 18 months from receipt/acceptance, whichever is earlier
  • Payment terms: 85% on receipt and acceptance; 15% after installation, commissioning and testing
  • ATC clauses: Packing to avoid transit damage; fitment and 1:1 interchangeability certificates; standard warranty certificate required
  • Option clause: Up to 25% quantity variation during contract or currency at contracted rates
  • Standards/Certs: Certificates must be uploaded as specified in bid document; non-submission may lead to rejection
  • Frontier work: Installation and commissioning work front to be provided by supplier within the defined windows

Terms, Conditions & Eligibility

  • EMD/Security: Not specified here; bidders must review ATC for exact requirements
  • Delivery timeline: Delivery period aligned with option clause; extended time computation applies with minimum 30 days
  • Payments: 85% on receipt/acceptance; 15% after completion of testing
  • Documentation: FITMENT, interchangeability certificates, standard warranty certificate, packing compliance
  • Warranty/AMC: 12 months warranty on spares from installation; 18 months from receipt/acceptance
  • ATC compliance: Upload all required certificates; non-submission risks rejection
  • Scope of supply: Entire bid price to include all costs for supply, installation, testing, and commissioning
  • BOQ: 5 items with no explicit quantities; supplier must align with contractual scope and site requirements

Key Specifications

  • Product/Service: Supply, Installation, Testing and Commissioning of Goods

  • Quantity: 5 BOQ items (quantities not disclosed)

  • Delivery: 01 month to access site; 02 months from acceptance for installation

  • EMD/Value: Not specified in data; refer to ATC

  • Standards/Certs: Required certificates uploaded; interchangability and fitment certificates

  • Warranty: 12 months on spares from installation; 18 months from receipt/acceptance

Terms & Conditions

  • Option to increase/decrease quantity up to 25% at contracted rates

  • 85% payment on receipt and acceptance; 15% after installation and testing

  • Installation front within 01 month; complete installation within 02 months after acceptance

  • 12-month spare warranty or 18-month receipt/acceptance warranty

  • Packing to prevent transit damage; mandatory fitment/interchangeability certificates

  • Submit all required certificates; non-submission may lead to rejection

Important Clauses

Payment Terms

85% on receipt and acceptance; 15% after installation, commissioning and testing

Delivery Schedule

Delivery period may extend per option clause; minimum extra time 30 days

Penalties/Liquidated Damages

Not explicitly stated here; ATC requires timely installation with defined windows

Bidder Eligibility

  • Experience in supply, installation, testing and commissioning of similar equipment

  • Financial stability demonstrated by audited statements

  • Ability to provide OEM authorizations and compliance certificates

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

31201638120 , 31201638130 , 31201638140 , 31201638150 , 31201638160

Authority Records

MINISTRY OF MINESNATIONAL ALUMINIUM COMPANY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8494439.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

31201638120

GUIDE ROLLER FOR CRUSHER HOUSE LIFT

28 ea Delivery: 120 days
#2

31201638130

COUNTER ROLLER FOR CRUSHER HOUSE LIFT

8 ea Delivery: 120 days
#3

31201638140

PINION MODULE 5 FOR CRUSHER HOUSE LIFT

4 ea Delivery: 120 days
#4

31201638150

CABLE TROLLEY GUIDE ROLLER FOR CH LIFT

8 ea Delivery: 120 days
#5

31201638160

CAGE COLLAPSABLE DOOR LHS FOR CH LIFT

1 ea Delivery: 120 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply, installation, testing and commissioning

4

Financial statements (profit & loss, balance sheet)

5

EMD/Security deposit documents as per ATC

6

Technical bid documents and compliance certificates

7

OEM authorizations or proof of manufacturer partnership

8

Fitment and 1:1 interchangeability certificates

9

Warranty certificate for spares

10

Any other certificates demanded in ATC

Corrigendum Updates

1 Update
#1

Update

10-Nov-2025

Extended Deadline

17-Nov-2025, 10:00 am

Opening Date

17-Nov-2025, 10:30 am

Financial Results

Rank Seller Price Item
L1
MEKASTER ENGINEERING SERVICES PRIVATE LIMITED   Under PMA
Item Categories : 31201638120,31201638130,31201638140,31201638150,31201638160

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid for Nalco supply installation tender in Angul Odisha 2025?

Bidders must submit GST, PAN, experience certificates, financials, and EMD per ATC. Provide OEM authorizations and technical compliance certificates. The scope covers supply, installation, testing and commissioning with 85% payment on receipt/acceptance and 15% after testing. Ensure fitment/interchangeability certificates and packing compliance are included.

What documents are required for Nalco Angul tender 2025 procurement?

Required documents include GST certificate, PAN, experience certificates for similar projects, audited financial statements, EMD documents, technical bid, OEM authorization, fitment and interchangeability certificates, and standard warranty certificates. Upload all as per terms to avoid rejection.

What are the delivery and installation timelines in Nalco ATC?

Delivery access is to be provided within 01 month of receipt, with installation completed within 02 months after acceptance. Payment remains 85% on receipt/acceptance, 15% after installation and testing. Ensure timely site readiness and compliance with packing and warranty requirements.

What warranty is required for spares under Nalco procurement?

The standard warranty for spares is 12 months from installation or 18 months from receipt and acceptance, whichever occurs earlier. The supplier must provide a warranty certificate covering all supplied spares and ensure service availability during the warranty period.

What are the option clause and quantity variation rules in Nalco tender?

The purchaser may increase or decrease quantity up to 25% of bid quantity at contract award and during currency. Additional time is calculated as (Increase ÷ Original) × Original delivery period with a minimum 30 days, and extended up to the original period during option exercise.

Which certificates are mandatory for Nalco Angul tender submission?

Mandatory certificates include fitment and 1:1 interchangeability certificates, standard warranty certificates, and other certificates listed in the bid document/ATC. Missing certificates may lead to rejection, so ensure all required compliance documents are uploaded.

What is the payment schedule for Nalco supply contract in Angul?

Payment terms specify 85% of total value on receipt of material at Nalco site and upon acceptance by the MA/S Nalco engineer; the remaining 15% is released after installation, commissioning, and testing are completed.

How to ensure compliance with packing and installation requirements in Nalco bid?

Submit standard packing certificates showing transit damage protection, ensure installation front is prepared within 01 month and complete installation within 02 months after acceptance. Provide 12-month spare warranty and 18-month receipt/acceptance warranty certificates to meet ATC demands.