TenderDekho Logo
Active GEM

Uttar Pradesh Power Corporation Limited 33 KV Metering Current Transformer 0.2S Tender Agra UP 2026

Bid Publish Date

23-Jul-2026, 10:41 pm

Bid End Date

07-Aug-2026, 1:00 pm

EMD

₹14,400

Progress

Issue23-Jul-2026, 10:41 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

150

Bid Type

Two Packet Bid

Key Highlights

  • Critical brand/OEM requirements: Not specified
  • Technical standards/certifications: Not specified
  • Unique conditions: 25% quantity flex during and after award; 5-day drawing approval window
  • Eligibility: bidder must not be in liquidation or bankruptcy; turnover criteria per bid document
  • Warranty/AMC: Not specified
  • Penalties/LD: Not specified; LD terms only implied via delivery delays tied to drawing approvals

Categories 6

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL); Product: 33 KV Metering Current Transformer 0.2S accuracy; Estimated Value: not disclosed; EMD: ₹14,400; Location: Agra, Uttar Pradesh 282001; Delivery Scope: supply to ALL STORE CENTERS OF ESD in Agra, Aligarh, Kanpur, Jhansi, Banda; Key Clause: option to increase/decrease quantity up to 25% at contracted rates; Detailed Design Drawings must be approved within 5 days of award; non-approval delays will not incur LD for drawing delays.

Technical Specifications & Requirements

  • Category: 33 KV METERING CURRENT TRANSFORMER 0.2S ACCURACY; Delivery Points: ESD store centers in Agra, Aligarh, Kanpur, Jhansi, Banda; Supply Scope: goods only; delivery/installation at specified addresses; DRAWING APPROVAL: required within 5 days of award with Buyer-provided modification list in 5 days; if Buyer delays approvals, delivery period is fixed without LD for the delay; GST: bidder bears applicable GST with potential reimbursement per actuals or prevailing rates; Turnover: minimum average turnover over the last three years as per bid document; Liability: bidder should not be in liquidation or bankruptcy.

Terms & Eligibility

  • EMD: ₹14,400; Quantity Flexibility: ±25% during contract; Delivery Period: computed based on original period with a minimum of 30 days; extended time allowed; Payment/GST: GST to be calculated by bidder; reimbursement as actuals per rates; Performance/QA: Detailed Design Drawings to be approved prior to fabrication; non-compliance with drawing approvals may affect delivery schedule; Turnover Requirement: documented as per bid document; Location: delivery to multiple UP locations; Status: No BOQ items available; scope is limited to supply of goods only.

Key Specifications

  • 33 KV METERING CURRENT TRANSFORMER 0.2S accuracy

  • Delivery addresses: ALL STORE CENTERS OF ESD AGRA, ALIGARH, KANPUR, JHANSI, BANDA

  • Scope: Supply of Goods only; installation/commissioning as per Terms

  • drawings: Detailed Design Drawings to be approved within 5 days of award

  • GST: applicable GST borne by bidder; reimbursement as per actuals or rates

Terms & Conditions

  • EMD of ₹14,400 required with bid submission

  • Quantity may vary ±25% at contract but at contracted rates

  • Delivery timeline linked to original delivery period with 30-day minimum

  • Approval of Detailed Design Drawings within 5 days; delays affect schedule without LD

  • GST payable by bidder; reimbursement as per actuals or applicable rates

Important Clauses

Payment Terms

GST payable by bidder; reimbursement as per actuals or applicable rates; payment terms not explicitly stated in tender text

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time calculated as (increased quantity ÷ original quantity) × original delivery period, min 30 days

Penalties/Liquidated Damages

Not explicitly specified; delays may be influenced by drawing approval timelines

Bidder Eligibility

  • Not in liquidation, court receivership, or bankruptcy

  • Turnover as per bid document for last 3 years

  • Capability to supply 33 KV metering CTs and complete required documentation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

33 KV METERING CURRENT TRANSFORMER 0.2S ACCURACY

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

48

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Agra

Delivery Pincodes

282007

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Dinesh Kumar282007,Electricity Store Centre, 132 KV Sub Station , Near Shilp Gram, Taj Ganj, AgraAgraUttar Pradesh282007-30-

Authority Records

ENERGY DEPARTMENTUTTAR PRADESH POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9624798.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements or CA certificate for turnover (last 3 years)

4

Experience certificates for similar supply (if any)

5

EMD submission document for ₹14,400

6

Technical bid documents and any OEM authorizations (if applicable)

7

Undertaking of non-liquidation/non-bankruptcy

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the 33 KV metering CT tender in Agra UP 2026?

Bidders must submit GST, PAN, turnover certificates for three years, and EMD of ₹14,400. Provide Detailed Design Drawings within 5 days of award and ensure supply of goods to UP ESD centers in Agra, Aligarh, Kanpur, Jhansi, and Banda. Adhere to quantity variation up to 25% and ensure GST compliance.

What documents are required for UPPCL meter CT procurement 2026?

Submit GST certificate, PAN card, audited financial statements or CA certificate for three-year turnover, experience certificates, OEM authorizations if applicable, EMD deposit of ₹14,400, and technical bid documents. Include undertaking of non-liquidation and ensure bid compliance with drawing approval process.

What are the delivery locations for UP electricity CT supply tender?

Delivery to ALL STORE CENTERS OF ESD in UP cities: Agra, Aligarh, Kanpur, Jhansi, and Banda. Goods-only scope with installation/commissioning as per terms. Delivery period begins after original order and may extend per option clause with minimum 30 days.

What is the option clause for quantity variation in this UP tender?

Purchaser may increase/decrease quantity by up to 25% of bid quantity at contracted rates during placement and in-currency. Additional time for delivery is calculated via a formula, with a minimum of 30 days; original delivery period controls the extension.

What is the significance of Detailed Design Drawings in this UP tender?

Successful bidder must submit Detailed Design Drawings within 5 days of award. Buyer will approve or list modifications within 5 days. Delivery is aligned to approved drawings; delays in approval may fix the delivery period without LD for the delay.

Are there any brand or certification requirements for UPPCL CT tender 2026?

The tender text does not specify brand/OEM or explicit certification codes. Bid submissions should focus on generic CTs meeting 0.2S accuracy and ensure compliance with standard procurement practices, including GST handling and quality traceability through drawings and documentation.

What are the GST considerations for this Agra meter CT bid?

Bidders must bear applicable GST; GST reimbursement will be provided as per actuals or prevailing rates, whichever is lower, up to the quoted GST percentage. This requires accurate GST computation in the bid and supporting tax documents.

When is the delivery timeline and payment terms for UP electricity CT tender?

Delivery starts after approval and last-date order; the extension formula applies with a 30-day minimum. Payment terms are not explicitly stated; GST is reimbursed per actuals or rates. Ensure timely drawings approval to avoid schedule shifts.