Bid Publish Date
05-Oct-2026, 5:40 pm
Bid End Date
26-Oct-2026, 6:00 pm
EMD
₹11,10,000
Value
₹5,50,00,000
Location
Progress
National Institute Of Technology (nit) invites bids for Firewall, Logging and Analytics, Storage, Core Switch, Distribution Switch Main, SFP 10G, SFP 25G, QSFP 40G, Distribution Switch H Hostel, Access Switch POE, Wi-Fi 7 Access Point, WLAN Controller, UTP Patch cord 0. 5 Mtr, UTP Patch cord 2 Mtr, IO Face Plate, Patch panel, CAT 6 UTP Cable, Fiber Cable, 25 MM PVC Casing Capping Conduit, Rack 12U, Rack 9 U, LIU 6 Port, LIU 24 Port, Fiber patch cord, UPS, Network Management and Monitoring, 50x50 MM PVC Trunking, Laying Of UTP cable, OFC cable Laying, CAT6 Patch panel Installation, Fiber Splicing, Rack Installation and Dressing, Access Point Installation charges, Network Device installation testing and commissioning, 01 Manpower for Service and Support 3 years, 03 Year support, operation and maintenance in RAIPUR, CHHATTISGARH. Quantity: 35614. Submission Deadline: 26-10-2026 18: 00: 00. Submit your proposal before the deadline.
Quantity
35614
Category
Firewall
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
Bid Splitting Applied
No
Min. Avg. Annual Turnover
275
OEM Avg. Turnover
2200
Past Performance
20 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Firewall , Logging and Analytics , Storage , Core Switch , Distribution Switch Main , SFP 10G , SFP 25G , QSFP 40G , Distribution Switch H Hostel , Access Switch POE , Wi-Fi 7 Access Point , WLAN Controller , UTP Patch cord 0.5 Mtr , UTP Patch cord 2 Mtr , IO Face Plate , Patch panel , CAT 6 UTP Cable , Fiber Cable , 25 MM PVC Casing Capping Conduit , Rack 12U , Rack 9 U , LIU 6 Port , LIU 24 Port , Fiber patch cord , UPS , Network Management and Monitoring , 50x50 MM PVC Trunking , Laying Of UTP cable , OFC cable Laying , CAT6 Patch panel Installation , Fiber Splicing , Rack Installation and Dressing , Access Point Installation charges , Network Device installation testing and commissioning , 01 Manpower for Service and Support 3 years , 03 Year support, operation and maintenance
Advisory Bank
State Bank of India
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Raipur
Delivery Pincodes
492010
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ravindra Kumar Chouhan | 492010,NIT Raipur G.E. Road, Raipur 492010 | Raipur | Chhattisgarh | 492010 | 2 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Firewall
As per specification
Logging and Analytics
As per specification
Storage
As per specification
Core Switch
As per specification
Distribution Switch Main
As per specification
SFP 10G
As per specification
SFP 25G
As per specification
QSFP 40G
As per specification
Distribution Switch H Hostel
As per specification
Access Switch POE
As per specification
Wi-Fi 7 Access Point
As per specification
WLAN Controller
As per specification
SFP 10G
As per specification
QSFP 40G
As per specification
UTP Patch cord 0.5 Mtr
As per specification
UTP Patch cord 2 Mtr
As per specification
IO Face Plate
As per specification
Patch panel
As per specification
CAT 6 UTP Cable
As per specification
Fiber Cable
As per specification
25 MM PVC Casing Capping Conduit
As per specification
Rack 12U
As per specification
Rack 9 U
As per specification
LIU 6 Port
As per specification
LIU 24 Port
As per specification
Fiber patch cord
As per specification
UPS
As per specification
Network Management and Monitoring
As per specification
50x50 MM PVC Trunking
As per specification
Laying Of UTP cable
As per specification
IO Face Plate
As per specification
OFC cable Laying
As per specification
CAT6 Patch panel Installation
As per specification
Fiber Splicing
As per specification
Rack Installation and Dressing
As per specification
Access Point Installation charges
As per specification
Network Device installation testing and commissioning
As per specification
01 Manpower for Service and Support 3 years
As per specification
03 Year support, operation and maintenance
As per specification
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Firewall | As per specification | 2 | nos | consignee.ccc | 60 | |
| 2 | Logging and Analytics | As per specification | 1 | nos | consignee.ccc | 60 | |
| 3 | Storage | As per specification | 1 | nos | consignee.ccc | 60 | |
| 4 | Core Switch | As per specification | 1 | nos | consignee.ccc | 60 | |
| 5 | Distribution Switch Main | As per specification | 3 | nos | consignee.ccc | 60 | |
| 6 | SFP 10G | As per specification | 20 | nos | consignee.ccc | 60 | |
| 7 | SFP 25G | As per specification | 8 | nos | consignee.ccc | 60 | |
| 8 | QSFP 40G | As per specification | 16 | nos | consignee.ccc | 60 | |
| 9 | Distribution Switch H Hostel | As per specification | 2 | nos | consignee.ccc | 60 | |
| 10 | Access Switch POE | As per specification | 15 | nos | consignee.ccc | 60 | |
| 11 | Wi-Fi 7 Access Point | As per specification | 230 | nos | consignee.ccc | 60 | |
| 12 | WLAN Controller | As per specification | 1 | nos | consignee.ccc | 60 | |
| 13 | SFP 10G | As per specification | 48 | nos | consignee.ccc | 60 | |
| 14 | QSFP 40G | As per specification | 4 | nos | consignee.ccc | 60 | |
| 15 | UTP Patch cord 0.5 Mtr | As per specification | 220 | nos | consignee.ccc | 60 | |
| 16 | UTP Patch cord 2 Mtr | As per specification | 220 | nos | consignee.ccc | 60 | |
| 17 | IO Face Plate | As per specification | 220 | nos | consignee.ccc | 60 | |
| 18 | Patch panel | As per specification | 12 | nos | consignee.ccc | 60 | |
| 19 | CAT 6 UTP Cable | As per specification | 12,240 | mtrs | consignee.ccc | 60 | |
| 20 | Fiber Cable | As per specification | 1,750 | mtrs | consignee.ccc | 60 | |
| 21 | 25 MM PVC Casing Capping Conduit | As per specification | 3,000 | mtrs | consignee.ccc | 60 | |
| 22 | Rack 12U | As per specification | 1 | nos | consignee.ccc | 60 | |
| 23 | Rack 9 U | As per specification | 12 | nos | consignee.ccc | 60 | |
| 24 | LIU 6 Port | As per specification | 13 | nos | consignee.ccc | 60 | |
| 25 | LIU 24 Port | As per specification | 1 | nos | consignee.ccc | 60 | |
| 26 | Fiber patch cord | As per specification | 40 | nos | consignee.ccc | 60 | |
| 27 | UPS | As per specification | 2 | nos | consignee.ccc | 60 | |
| 28 | Network Management and Monitoring | As per specification | 1 | nos | consignee.ccc | 60 | |
| 29 | 50x50 MM PVC Trunking | As per specification | 3,000 | mtrs | consignee.ccc | 60 | |
| 30 | Laying Of UTP cable | As per specification | 12,240 | mtrs | consignee.ccc | 60 | |
| 31 | IO Face Plate | As per specification | 200 | nos | consignee.ccc | 60 | |
| 32 | OFC cable Laying | As per specification | 1,750 | mtrs | consignee.ccc | 60 | |
| 33 | CAT6 Patch panel Installation | As per specification | 12 | nos | consignee.ccc | 60 | |
| 34 | Fiber Splicing | As per specification | 102 | nos | consignee.ccc | 60 | |
| 35 | Rack Installation and Dressing | As per specification | 13 | nos | consignee.ccc | 60 | |
| 36 | Access Point Installation charges | As per specification | 210 | nos | consignee.ccc | 60 | |
| 37 | Network Device installation testing and commissioning | As per specification | 1 | lot | consignee.ccc | 60 | |
| 38 | 01 Manpower for Service and Support 3 years | As per specification | 1 | lot | consignee.ccc | 60 | |
| 39 | 03 Year support, operation and maintenance | As per specification | 1 | lot | consignee.ccc | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer