TenderDekho Logo
Active GEM

Tender Notice for Firewall,Logging and Analytics,Storage,Core Switch,Distribution Switch Main,SFP 10G,SFP 25G,QSFP 40 in RAIPUR, CHHATTISGARH

Bid Publish Date

05-Oct-2026, 5:40 pm

Bid End Date

26-Oct-2026, 6:00 pm

EMD

₹11,10,000

Value

₹5,50,00,000

Progress

Issue05-Oct-2026, 5:40 pm
AwardPending

National Institute Of Technology (nit) invites bids for Firewall, Logging and Analytics, Storage, Core Switch, Distribution Switch Main, SFP 10G, SFP 25G, QSFP 40G, Distribution Switch H Hostel, Access Switch POE, Wi-Fi 7 Access Point, WLAN Controller, UTP Patch cord 0. 5 Mtr, UTP Patch cord 2 Mtr, IO Face Plate, Patch panel, CAT 6 UTP Cable, Fiber Cable, 25 MM PVC Casing Capping Conduit, Rack 12U, Rack 9 U, LIU 6 Port, LIU 24 Port, Fiber patch cord, UPS, Network Management and Monitoring, 50x50 MM PVC Trunking, Laying Of UTP cable, OFC cable Laying, CAT6 Patch panel Installation, Fiber Splicing, Rack Installation and Dressing, Access Point Installation charges, Network Device installation testing and commissioning, 01 Manpower for Service and Support 3 years, 03 Year support, operation and maintenance in RAIPUR, CHHATTISGARH. Quantity: 35614. Submission Deadline: 26-10-2026 18: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

35614

Category

Firewall

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

275

OEM Avg. Turnover

2200

Past Performance

20 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Firewall , Logging and Analytics , Storage , Core Switch , Distribution Switch Main , SFP 10G , SFP 25G , QSFP 40G , Distribution Switch H Hostel , Access Switch POE , Wi-Fi 7 Access Point , WLAN Controller , UTP Patch cord 0.5 Mtr , UTP Patch cord 2 Mtr , IO Face Plate , Patch panel , CAT 6 UTP Cable , Fiber Cable , 25 MM PVC Casing Capping Conduit , Rack 12U , Rack 9 U , LIU 6 Port , LIU 24 Port , Fiber patch cord , UPS , Network Management and Monitoring , 50x50 MM PVC Trunking , Laying Of UTP cable , OFC cable Laying , CAT6 Patch panel Installation , Fiber Splicing , Rack Installation and Dressing , Access Point Installation charges , Network Device installation testing and commissioning , 01 Manpower for Service and Support 3 years , 03 Year support, operation and maintenance

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Raipur

Delivery Pincodes

492010

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ravindra Kumar Chouhan492010,NIT Raipur G.E. Road, Raipur 492010RaipurChhattisgarh492010260-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9973080.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 39 Items Sign in for GEM prices

#1

Firewall

As per specification

2 nos Delivery: 60 days
#2

Logging and Analytics

As per specification

1 nos Delivery: 60 days
#3

Storage

As per specification

1 nos Delivery: 60 days
#4

Core Switch

As per specification

1 nos Delivery: 60 days
#5

Distribution Switch Main

As per specification

3 nos Delivery: 60 days
#6

SFP 10G

As per specification

20 nos Delivery: 60 days
#7

SFP 25G

As per specification

8 nos Delivery: 60 days
#8

QSFP 40G

As per specification

16 nos Delivery: 60 days
#9

Distribution Switch H Hostel

As per specification

2 nos Delivery: 60 days
#10

Access Switch POE

As per specification

15 nos Delivery: 60 days
#11

Wi-Fi 7 Access Point

As per specification

230 nos Delivery: 60 days
#12

WLAN Controller

As per specification

1 nos Delivery: 60 days
#13

SFP 10G

As per specification

48 nos Delivery: 60 days
#14

QSFP 40G

As per specification

4 nos Delivery: 60 days
#15

UTP Patch cord 0.5 Mtr

As per specification

220 nos Delivery: 60 days
#16

UTP Patch cord 2 Mtr

As per specification

220 nos Delivery: 60 days
#17

IO Face Plate

As per specification

220 nos Delivery: 60 days
#18

Patch panel

As per specification

12 nos Delivery: 60 days
#19

CAT 6 UTP Cable

As per specification

12,240 mtrs Delivery: 60 days
#20

Fiber Cable

As per specification

1,750 mtrs Delivery: 60 days
#21

25 MM PVC Casing Capping Conduit

As per specification

3,000 mtrs Delivery: 60 days
#22

Rack 12U

As per specification

1 nos Delivery: 60 days
#23

Rack 9 U

As per specification

12 nos Delivery: 60 days
#24

LIU 6 Port

As per specification

13 nos Delivery: 60 days
#25

LIU 24 Port

As per specification

1 nos Delivery: 60 days
#26

Fiber patch cord

As per specification

40 nos Delivery: 60 days
#27

UPS

As per specification

2 nos Delivery: 60 days
#28

Network Management and Monitoring

As per specification

1 nos Delivery: 60 days
#29

50x50 MM PVC Trunking

As per specification

3,000 mtrs Delivery: 60 days
#30

Laying Of UTP cable

As per specification

12,240 mtrs Delivery: 60 days
#31

IO Face Plate

As per specification

200 nos Delivery: 60 days
#32

OFC cable Laying

As per specification

1,750 mtrs Delivery: 60 days
#33

CAT6 Patch panel Installation

As per specification

12 nos Delivery: 60 days
#34

Fiber Splicing

As per specification

102 nos Delivery: 60 days
#35

Rack Installation and Dressing

As per specification

13 nos Delivery: 60 days
#36

Access Point Installation charges

As per specification

210 nos Delivery: 60 days
#37

Network Device installation testing and commissioning

As per specification

1 lot Delivery: 60 days
#38

01 Manpower for Service and Support 3 years

As per specification

1 lot Delivery: 60 days
#39

03 Year support, operation and maintenance

As per specification

1 lot Delivery: 60 days

Categories 37

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement