Bid Publish Date
23-Jun-2026, 4:32 pm
Bid End Date
21-Jul-2026, 4:00 pm
EMD
₹1,50,000
Location
Progress
RAMazagon Dock Shipbuilders Limited announces a tender for Gas Metal Arc Welding (GMAW) Machine (V2) (Q2) in MUMBAI, MAHARASHTRA. Quantity: 50. Submission Deadline: 21-07-2026 16: 00: 00. Last date to apply is approaching fast!
Start
25-Aug-2026, 10:00 am
End
26-Aug-2026, 10:00 am
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
50
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Warranty Period
5 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Gas Metal Arc Welding (GMAW) Machine (V2) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
64
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Mumbai
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Mumbai | Mumbai | - | - | 50 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
21-Jul-2026, 10:30 am
Opening Date
21-Jul-2026, 11:00 am
Experience Criteria
Bidder Turnover
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Generic | Technology | Insulated Gate Bipolar Transistor (IGBT) |
| Generic | Welding Mode | Standard MIG |
| Generic | Power Supply (Tolerance +- 10%) | 415 V Three Phase (50/60Hz) |
| Generic | Maximum Welding Current at 60% duty cycle (In Amp) (Tolerance +- 10%) | 400 |
| Generic | Efficiency (In %) | >80<=85, >85<=90 Or higher |
| Generic | Insulation Class | H |
| Generic | Degree of Protection (IP) | IP23 |
| Generic | Torch Cooling Method | Air Cooled |
| Wire Feeding System | Wire Feed Mechanism | Separate Wire Feeder |
| Wire Feeding System | Wire Diameter Supported (In mm) | 0.8, 1.0, 1.2, 1.6 |
| Wire Feeding System | Max. Spool Size Capacity | 15 Kg |
| Wire Feeding System | Wire Feeder | 4 Roll drive |
| Features & Functions | Current Control | Stepless Control |
| Features & Functions | Standard Features | Wire Feed Speed Control |
| Features & Functions | Shielding Gas Selection | NA |
| Features & Functions | Parameter Locking | NA |
| Features & Functions | Memory | NA |
| Features & Functions | Pinch-Off Pulse Control | NA |
| Features & Functions | Creep Function | NA |
| Features & Functions | Pre & Post Gas Flow | NA |
| Accessories | Standard Accessories | MIG Torch (Min. 3 meter), Earth Clamp with cable (Min. 3 meter), Gas regulator (ISI Marked), Flow Meter, Pre Heater |
| Accessories | Optional Accessories | NA |
| Safety | Protection | Single Phasing Protection, Over Temperature, Under Voltage and Over Voltage |
| Warranty | Standard Warranty | 1 Year, 2 Year Or higher |