TenderDekho Logo
GEM

Marketing Division Indian Oil Corporation Limited supply & installation tender 2025 in Not Specified Location with 30 Items and 25% Quantity Option

Bid Publish Date

19-Dec-2025, 11:58 am

Bid End Date

29-Dec-2025, 6:00 pm

Value

₹19,96,624

Progress

Issue19-Dec-2025, 11:58 am
Award28-Feb-2026, 1:35 am
Explore all 4 tabs to view complete tender details

Quantity

2244

Category

Supply of 8 channel Field Terminal Unit-24 VDC

Bid Type

Single Packet Bid

Categories 71

Tender Overview

Indian Oil Corporation Limited – Marketing Division invites bids for a broad range of field equipment and cabling, including 8 channel Field Terminal Units, FLP/WP enclosures, FTU power supplies, mounting accessories, FLP hooter, infrared gas detectors, 4-20mA transmitters, sensor mounting accessories, modified software and mimic panels, weatherproof junction boxes, surge protection, and associated cabling and trenching works. Estimated value: ₹1,996,624.00. Location not specified. The scope also covers installation, testing, commissioning, and dismantling of old GMS panels with complete cabling and underground brick duct works. A 25% quantity option during contract is allowed, at contracted rates, with minimum 30 days additional delivery time when exercised. Unique integration of software and hardware components distinguishes this tender.

Technical Specifications & Requirements

  • No explicit technical specs documented in the provided data; itemized categories cover FTU hardware, enclosures, sensors, software, and cabling.
  • Estimated value provides a sense of project scale (₹1,996,624.00).
  • Scope includes installation, testing, commissioning of sensors and FTU equipment, and dismantling of existing GMS panels.
  • Delivery terms hinge on option clause: ±25% quantity changes, with delivery time recalculated as (additional quantity/original quantity) × original period, minimum 30 days.
  • Supplier must align with GCC terms linked in the provided ATC; price bids should reflect bundled services and hardware.
  • No standard numbers, certifications, or product brands are specified in the data; bidders must rely on technical competence and past experience.

Terms, Conditions & Eligibility

  • Option Clause permits ±25% quantity change at contracted rates.
  • Delivery period adjustments align to the formula stated, with minimum 30 days.
  • Bidders must comply with GCC terms referenced in the linked document.
  • Terms emphasize installation, testing, commissioning, and dismantling activities across multiple components and cabling works.
  • EMD and explicit payment terms are not detailed in the provided data; bidders should seek clarifications.
  • Boilerplate clauses suggest adherence to standard government tender processes and post-award amendments.

Key Specifications

  • Product categories include: 8 channel FTU, 24 VDC and 5 VDC FTU power supplies, FTU mounting accessories, FLP hooter, infrared gas detectors, 4-20 mA transmitters, sensor mounting accessories with window junction box, modified GMS software, mimic repeater panel, modified CPU/CIU card, FLP 4-way JB, weatherproof junction box, FLP switches, surge protection for GMS, and heavy-duty cable termination lugs.

  • Cabling works: XLPE insulated PVC-sheathed copper conductors, 3 core x 1.5 sq mm, FRLS

  • Installation, testing and commissioning of sensors, FTU equipment, and related accessories

  • Underground brick duct construction: 650 mm below GL with 225 mm cover, 16 bricks

  • GI cable route markers and perforated GI cable trays (150 mm x 50 mm x 2 mm)

  • GI conduit for cable routing; sealing with jute and bitumen

Terms & Conditions

  • Option Clause permits ±25% quantity changes at bid quantity or during currency.

  • Delivery schedule recalculated using (additional/original) × Original delivery period with minimum 30 days.

  • GCC terms must be followed as per linked document; bidder must comply with standard government contracting rules.

Important Clauses

Payment Terms

Not specified in data; bidders should reference GCC and ATC for payment milestones and any advance/retention details.

Delivery Schedule

Delivery time extends with option quantity changes, using the formula (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days.

Penalties/Liquidated Damages

Not specified in data; refer to GCC link for LD/penalty framework.

Bidder Eligibility

  • Experience in installing and commissioning FTU and related field equipment

  • Financial capacity to handle ~₹2 million project value

  • Ability to comply with GCC terms and OEM authorizations if required

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 8 channel Field Terminal Unit-24 VDC , Supply of Dual Compartment FLP or WP Enclosure , Supply of 24V FTU Power Supply Card , Supply of 5 VDC FTU Power Supply card , Supply of FTU Mounting Accessories , Supply of FLP Hooter 230VAC Baliga Make , Supply of Infrared Gas Detectors , Supply of 4-20mA Transmitter , Supply of Sensor Mounting Accessories with window Junction box for sensors , Supply of Modified GMS Software , Supply of Modified Mimic Repeater Panel with layout , Modified CPU or CIU Card , Supply of FLP JB 4 way , Supply of Weather Proof Junction Box-Power and Signal , Supply of FLP ON or OFF Switch , Supply and installation of Surge Protection Device for GMS , Supply of FLP JB Push Button with Ack Switch , FLP HEAVY DUTY DOUBLE COMPRESSION Cable Termination-FLP. Copper lugs for copper cables and aluminium lugs for aluminium cables shall be used. , CABLING AND ALLIED WORKS - ARMOURED CABLES Supply and laying of XLPE insulated PVC sheathed copper conductor- 3 Core x 1.5 sq. mm. copper FRLS , Installation,Testing and Commissioning of Sensor and mounting accessories , Installation,Testing and Commissioning of New FTU and Accessories,etc., , Installation of FLP JB, Enclosure and Mtg.Accessories for FTU an JB , Installation of FLP Hooter , Erection and Installation of CPU,Mimic and Software , Testing and Commissioning of System , Dismantling of Old GMS panel including FTU ,Cables,etc in all complete aspect. , CABLE BRICK DUCT Providing and constructing underground brick duct 650mm below GL -225 mm -16 Bricks and 0.0195 cum per Mtr , Supplying and installing of GI cable route marker with 100mm x 100mm x5mm thick GI Plate. , Supplying, fabricating and installing following sizes of perforated GI cable trays - 150mm x 50mm x 2mm , Providing and laying class-B 50mm dia GI pipe for cable routing under flooring or EB post leading including sealing both ends with jute and Bitumen

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASINDIAN OIL CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-8728996.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 30 Items Sign in for GEM prices

#1

Supply of 8 channel Field Terminal Unit-24 VDC

Supply of 8 channel Field Terminal Unit-24 VDC

4 ea Delivery: 120 days
#2

Supply of Dual Compartment FLP or WP Enclosure

Supply of Dual Compartment FLP or WP Enclosure

4 ea Delivery: 120 days
#3

Supply of 24V FTU Power Supply Card

Supply of 24V FTU Power Supply Card

4 ea Delivery: 120 days
#4

Supply of 5 VDC FTU Power Supply card

Supply of 5 VDC FTU Power Supply card

4 ea Delivery: 120 days
#5

Supply of FTU Mounting Accessories

Supply of FTU Mounting Accessories

4 ea Delivery: 120 days
#6

Supply of FLP Hooter 230VAC Baliga Make

Supply of FLP Hooter 230VAC Baliga Make

4 ea Delivery: 120 days
#7

Supply of Infrared Gas Detectors

Supply of Infrared Gas Detectors

9 ea Delivery: 120 days
#8

Supply of 4-20mA Transmitter

Supply of 4-20mA Transmitter

3 ea Delivery: 120 days
#9

Supply of Sensor Mounting Accessories with window Junction box for sensors

Supply of Sensor Mounting Accessories with window Junction box for sensors

3 ea Delivery: 120 days
#10

Supply of Modified GMS Software

Supply of Modified GMS Software

1 ea Delivery: 120 days
#11

Supply of Modified Mimic Repeater Panel with layout

Supply of Modified Mimic Repeater Panel with layout

1 ea Delivery: 120 days
#12

Modified CPU or CIU Card

Modified CPU or CIU Card

1 ea Delivery: 120 days
#13

Supply of FLP JB 4 way

Supply of FLP JB 4 way

4 ea Delivery: 120 days
#14

Supply of Weather Proof Junction Box-Power and Signal

Supply of Weather Proof Junction Box-Power and Signal

3 ea Delivery: 120 days
#15

Supply of FLP ON or OFF Switch

Supply of FLP ON or OFF Switch

4 ea Delivery: 120 days
#16

Supply and installation of Surge Protection Device for GMS

Supply and installation of Surge Protection Device for GMS

5 ea Delivery: 120 days
#17

Supply of FLP JB Push Button with Ack Switch

Supply of FLP JB Push Button with Ack Switch

4 ea Delivery: 120 days
#18

FLP HEAVY DUTY DOUBLE COMPRESSION Cable Termination-FLP. Copper lugs for copper cables and aluminium lugs for aluminium cables shall be used.

FLP HEAVY DUTY DOUBLE COMPRESSION Cable Termination-FLP. Copper lugs for copper cables and aluminium lugs for aluminium cables shall be used.

80 ea Delivery: 120 days
#19

CABLING AND ALLIED WORKS - ARMOURED CABLES Supply and laying of XLPE insulated PVC sheathed copper conductor- 3 Core x 1.5 sq. mm. copper FRLS

CABLING AND ALLIED WORKS - ARMOURED CABLES Supply and laying of XLPE insulated PVC sheathed copper conductor- 3 Core x 1.5 sq. mm. copper FRLS

1,500 m Delivery: 120 days
#20

Installation,Testing and Commissioning of Sensor and mounting accessories

Installation,Testing and Commissioning of Sensor and mounting accessories

9 su Delivery: 120 days
#21

Installation,Testing and Commissioning of New FTU and Accessories,etc.,

Installation,Testing and Commissioning of New FTU and Accessories,etc.,

4 su Delivery: 120 days
#22

Installation of FLP JB, Enclosure and Mtg.Accessories for FTU an JB

Installation of FLP JB, Enclosure and Mtg.Accessories for FTU an JB

4 su Delivery: 120 days
#23

Installation of FLP Hooter

Installation of FLP Hooter

4 su Delivery: 120 days
#24

Erection and Installation of CPU,Mimic and Software

Erection and Installation of CPU,Mimic and Software

1 su Delivery: 120 days
#25

Testing and Commissioning of System

Testing and Commissioning of System

1 su Delivery: 120 days
#26

Dismantling of Old GMS panel including FTU ,Cables,etc in all complete aspect.

Dismantling of Old GMS panel including FTU ,Cables,etc in all complete aspect.

1 ls Delivery: 120 days
#27

CABLE BRICK DUCT Providing and constructing underground brick duct 650mm below GL -225 mm -16 Bricks and 0.0195 cum per Mtr

CABLE BRICK DUCT Providing and constructing underground brick duct 650mm below GL -225 mm -16 Bricks and 0.0195 cum per Mtr

500 m Delivery: 120 days
#28

Supplying and installing of GI cable route marker with 100mm x 100mm x5mm thick GI Plate.

Supplying and installing of GI cable route marker with 100mm x 100mm x5mm thick GI Plate.

10 ea Delivery: 120 days
#29

Supplying, fabricating and installing following sizes of perforated GI cable trays - 150mm x 50mm x 2mm

Supplying, fabricating and installing following sizes of perforated GI cable trays - 150mm x 50mm x 2mm

50 m Delivery: 120 days
#30

Providing and laying class-B 50mm dia GI pipe for cable routing under flooring or EB post leading including sealing both ends with jute and Bitumen

Providing and laying class-B 50mm dia GI pipe for cable routing under flooring or EB post leading including sealing both ends with jute and Bitumen

18 m Delivery: 120 days

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar projects

4

Financial statements for last 3 years

5

EMD deposit proof (if applicable)

6

Technical bid documents

7

OEM authorizations (if required)

8

GCC compliance confirmation

9

Project approach and installation/test/commissioning plan

Financial Results

Rank Seller Price Item
L1
PENTAX ENGINEERING PRIVATE LIMITED( MSE Social Category:General )    Under PMA
Item Categories : Supply of 8 channel Field Terminal Unit-24 VDC,Supply of Dual Compartment FLP or WP Enclosure,Suppl

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for IOC Marketing Division tender in not specified location with 30 items

Bidders should submit GST, PAN, experience and financial documents, plus technical bid and OEM authorizations if required. Ensure GCC terms are acknowledged. The estimate is ₹1,996,624, and the option clause allows ±25% quantity changes with the same contracted rates.

What documents are required for IOC procurement involving FTU and sensors

Required documents include GST registration, PAN, 3 years financial statements, experience certificates for similar work, technical bid, OEM authorization (if applicable), EMD proof, and GCC compliance confirmation. Ensure installation and commissioning plan is included.

What are the delivery terms for the IOC GMS integration project

Delivery is governed by the option clause; quantity may change ±25% with delivery time adjusted by (additional/original) × original period, minimum 30 days. Ensure availability of surge protection devices and weatherproof junction boxes per BOM.

How to ensure compliance with GCC for IOC tender 2025

Review the GCC linked in the ATC and attach a signed confirmation of compliance. Include warranty terms, delivery schedules, penalties, and acceptance criteria. Prepare contingencies for scope changes due to option clause.

What is the estimated value and scope of IOC procurement

Estimated value is ₹1,996,624.00. Scope includes FTU units, enclosures, power supplies (24V and 5V), sensors, software, mounting accessories, cabling, trenching, installation, testing, commissioning, and dismantling of old GMS panels.

What is required for installation and testing of FTU and accessories

Submit installation, testing, and commissioning plan for FTU hardware, sensors, and software. Include site readiness, safety approvals, cable routing, and verification of ILD/IS standards where applicable. Include testing schedules and acceptance criteria.

What are the 25% quantity change implications for bidders

Bidders must price for potential 25% quantity increase/decrease at contracted rates. Delivery time extends proportionally based on the formula given, with a minimum 30-day extension, ensuring readiness to scale and reallocate resources.

What certifications or OEM authorizations are expected for this IOC bid

Provide OEM authorization letters if required by the tender. At minimum, demonstrate capability to supply FTU components, software, and sensors; ensure compliance with any IS/ISO standards referenced in the GCC or ATC.