CT63-200-00790,CT63-200-00784,CT63-200-00781,CT63-200-00312,CT63-200-00797,CT63-200-00366,CT63-200-
Mishra Dhatu Nigam Limited (midhani)
HYDERABAD, TELANGANA
Progress
Quantity
12
Category
PC62-700-00817
Bid Type
Two Packet Bid
Public procurement opportunity for Mishra Dhatu Nigam Limited (midhani) PC62-700-00817, PC62-700-00818, PC62-700-00846, PC62-700-00819, PC62-700-00847, PC62-700-00848 in HYDERABAD, TELANGANA. Quantity: 12 issued by. Submission Deadline: 12-03-2026 11: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Mishra Dhatu Nigam Limited (midhani)
HYDERABAD, TELANGANA
Mishra Dhatu Nigam Limited (midhani)
HYDERABAD, TELANGANA
Mishra Dhatu Nigam Limited (midhani)
HYDERABAD, TELANGANA
Mishra Dhatu Nigam Limited (midhani)
HYDERABAD, TELANGANA
Mishra Dhatu Nigam Limited (midhani)
HYDERABAD, TELANGANA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | PC62-700-00817 | Swaging dies for R4-2 as per drawing M11P017-10-09-B3 (PM939) diameter of barrel Db 11mm2 | 2 | pair | [email protected] | 70 |
| 2 | PC62-700-00818 | Swaging dies for R4-2 as per drawing M11P017-10-09-B3 (PM939) diameter of barrel Db 10.4 mm | 2 | pair | [email protected] | 70 |
| 3 | PC62-700-00846 | Swaging dies for R4-2 as per drawing M11P017-10-09-B3 (PM939) diameter of barrel Db 9 mm | 2 | pair | [email protected] | 70 |
| 4 | PC62-700-00819 | Swaging dies for R4-2 as per drawing M11P017-10-09-B3 (PM939) diameter of barrel Db 7.8 mm | 2 | pair | [email protected] | 70 |
| 5 | PC62-700-00847 | Swaging dies for R4-2 as per drawing M11P017-10-09-B3 (PM939) diameter of barrel Db 6.8 mm | 2 | pair | [email protected] | 70 |
| 6 | PC62-700-00848 | Swaging dies for R4-2 as per drawing M11P017-10-09-B3 (PM939) diameter of barrel Db 6.0 mm | 2 | pair | [email protected] | 70 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS