Progress
National Institute Of Technology (nit) invites bids for PIPE FRICTION LOSS APPARATUS WITH SS TANK, PITOT TUBE APPARATUS ASSEMBLY FOR OPEN CHANNEL FLOW, FREE AND FORCED VORTEX APPARATUS WITH SS TANK, NOTCH APPARATUS WITH SS TANK WITH GAUGE ASSEMBLY, IMPACT OF JET APPARATUS WITH SS TANK, METACENTRIC HEIGHT OF SHIP APPARATUS WITH SS TANK, ORIFICE METER APPARATUS WITH SS TANK, ORIFICE SETUP WITH SS TANK, VENTURIMETER APPARATUS WITH SS TANK, BERNOULLIS THEOREM APPARATUS, PIPE FITTINGS LOSS APPARATUS, MINOR LOSS, WITH SS TANK Elbow, Bend, Sudden Expansion, Sudden Contraction, Valve, VISCOMETER FALLING BALL As per BS 188 with steel balls, PRESSURE MEASUREMENT APPARATUS WITH SS TANK, U Tube Manometer, Inclined U Tube Manometer, Vacuum Gauge, Pressure Gauge, STOKE LAW APPARATUS, PIEZOMETER TUBE, POINTERorHOOK GAUGE MADE OF BRASS HEIGHT 50CM Pointer or Hook gauge made of brass height 50 cm, Water pumps in PATNA, BIHAR. Quantity: 23. Submission Deadline: 28-08-2026 14: 00: 00. Submit your proposal before the deadline.
Quantity
23
Category
VENTURIMETER APPARATUS WITH SS TANK
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
8
OEM Avg. Turnover
64
Past Performance
60 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PIPE FRICTION LOSS APPARATUS WITH SS TANK , PITOT TUBE APPARATUS ASSEMBLY FOR OPEN CHANNEL FLOW , FREE AND FORCED VORTEX APPARATUS WITH SS TANK , NOTCH APPARATUS WITH SS TANK WITH GAUGE ASSEMBLY , IMPACT OF JET APPARATUS WITH SS TANK , METACENTRIC HEIGHT OF SHIP APPARATUS WITH SS TANK , ORIFICE METER APPARATUS WITH SS TANK , ORIFICE SETUP WITH SS TANK , VENTURIMETER APPARATUS WITH SS TANK , BERNOULLIS THEOREM APPARATUS , PIPE FITTINGS LOSS APPARATUS, MINOR LOSS, WITH SS TANK Elbow, Bend, Sudden Expansion, Sudden Contraction, Valve , VISCOMETER FALLING BALL As per BS 188 with steel balls , PRESSURE MEASUREMENT APPARATUS WITH SS TANK, U Tube Manometer, Inclined U Tube Manometer, Vacuum Gauge, Pressure Gauge , STOKE LAW APPARATUS , PIEZOMETER TUBE , POINTERorHOOK GAUGE MADE OF BRASS HEIGHT 50CM Pointer or Hook gauge made of brass height 50 cm , Water pumps
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
62
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Patna
Delivery Pincodes
800005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Prince Kumar | 800005,NIT PATNA, ASHOK RAJPATH, MAHENDRU, PATNA- 800005 | Patna | Bihar | 800005 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
PIPE FRICTION LOSS APPARATUS WITH SS TANK
Specification of PIPE FRICTION LOSS APPARATUS WITH SS TANK
PITOT TUBE APPARATUS ASSEMBLY FOR OPEN CHANNEL FLOW
Specification of PITOT TUBE APPARATUS ASSEMBLY FOR OPEN CHANNEL FLOW
FREE AND FORCED VORTEX APPARATUS WITH SS TANK
Specification of FREE AND FORCED VORTEX APPARATUS WITH SS TANK
NOTCH APPARATUS WITH SS TANK WITH GAUGE ASSEMBLY
Specification of NOTCH APPARATUS WITH SS TANK WITH GAUGE ASSEMBLY
IMPACT OF JET APPARATUS WITH SS TANK
Specification of IMPACT OF JET APPARATUS WITH SS TANK
METACENTRIC HEIGHT OF SHIP APPARATUS WITH SS TANK
Specification of METACENTRIC HEIGHT OF SHIP APPARATUS WITH SS TANK
ORIFICE METER APPARATUS WITH SS TANK
Specification of ORIFICE METER APPARATUS WITH SS TANK
ORIFICE SETUP WITH SS TANK
Specification of ORIFICE SETUP WITH SS TANK
VENTURIMETER APPARATUS WITH SS TANK
Specification of VENTURIMETER APPARATUS WITH SS TANK
BERNOULLIS THEOREM APPARATUS
Specification of BERNOULLIS THEOREM APPARATUS
PIPE FITTINGS LOSS APPARATUS, MINOR LOSS, WITH SS TANK Elbow, Bend, Sudden Expansion, Sudden Contraction, Valve
Specification of PIPE FITTINGS LOSS APPARATUS, MINOR LOSS, WITH SS TANK Elbow, Bend, Sudden Expansion, Sudden Contraction, Valve
VISCOMETER FALLING BALL As per BS 188 with steel balls
Specification of VISCOMETER FALLING BALL As per BS 188 with steel balls
PRESSURE MEASUREMENT APPARATUS WITH SS TANK, U Tube Manometer, Inclined U Tube Manometer, Vacuum Gauge, Pressure Gauge
Specification of PRESSURE MEASUREMENT APPARATUS WITH SS TANK, U Tube Manometer, Inclined U Tube Manometer, Vacuum Gauge, Pressure Gauge
STOKE LAW APPARATUS
Specification of STOKE LAW APPARATUS
PIEZOMETER TUBE
Specification of PIEZOMETER TUBE
POINTERorHOOK GAUGE MADE OF BRASS HEIGHT 50CM Pointer or Hook gauge made of brass height 50 cm
Specification of POINTERorHOOK GAUGE MADE OF BRASS HEIGHT 50CM Pointer or Hook gauge made of brass height 50 cm
Water pumps
Specification of Water pumps
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PIPE FRICTION LOSS APPARATUS WITH SS TANK | Specification of PIPE FRICTION LOSS APPARATUS WITH SS TANK | 1 | pieces | consignee1.eict.ptna | 45 | |
| 2 | PITOT TUBE APPARATUS ASSEMBLY FOR OPEN CHANNEL FLOW | Specification of PITOT TUBE APPARATUS ASSEMBLY FOR OPEN CHANNEL FLOW | 1 | pieces | consignee1.eict.ptna | 45 | |
| 3 | FREE AND FORCED VORTEX APPARATUS WITH SS TANK | Specification of FREE AND FORCED VORTEX APPARATUS WITH SS TANK | 1 | pieces | consignee1.eict.ptna | 45 | |
| 4 | NOTCH APPARATUS WITH SS TANK WITH GAUGE ASSEMBLY | Specification of NOTCH APPARATUS WITH SS TANK WITH GAUGE ASSEMBLY | 1 | pieces | consignee1.eict.ptna | 45 | |
| 5 | IMPACT OF JET APPARATUS WITH SS TANK | Specification of IMPACT OF JET APPARATUS WITH SS TANK | 1 | pieces | consignee1.eict.ptna | 45 | |
| 6 | METACENTRIC HEIGHT OF SHIP APPARATUS WITH SS TANK | Specification of METACENTRIC HEIGHT OF SHIP APPARATUS WITH SS TANK | 1 | pieces | consignee1.eict.ptna | 45 | |
| 7 | ORIFICE METER APPARATUS WITH SS TANK | Specification of ORIFICE METER APPARATUS WITH SS TANK | 1 | pieces | consignee1.eict.ptna | 45 | |
| 8 | ORIFICE SETUP WITH SS TANK | Specification of ORIFICE SETUP WITH SS TANK | 1 | pieces | consignee1.eict.ptna | 45 | |
| 9 | VENTURIMETER APPARATUS WITH SS TANK | Specification of VENTURIMETER APPARATUS WITH SS TANK | 1 | pieces | consignee1.eict.ptna | 45 | |
| 10 | BERNOULLIS THEOREM APPARATUS | Specification of BERNOULLIS THEOREM APPARATUS | 1 | pieces | consignee1.eict.ptna | 45 | |
| 11 | PIPE FITTINGS LOSS APPARATUS, MINOR LOSS, WITH SS TANK Elbow, Bend, Sudden Expansion, Sudden Contraction, Valve | Specification of PIPE FITTINGS LOSS APPARATUS, MINOR LOSS, WITH SS TANK Elbow, Bend, Sudden Expansion, Sudden Contraction, Valve | 1 | pieces | consignee1.eict.ptna | 45 | |
| 12 | VISCOMETER FALLING BALL As per BS 188 with steel balls | Specification of VISCOMETER FALLING BALL As per BS 188 with steel balls | 1 | pieces | consignee1.eict.ptna | 45 | |
| 13 | PRESSURE MEASUREMENT APPARATUS WITH SS TANK, U Tube Manometer, Inclined U Tube Manometer, Vacuum Gauge, Pressure Gauge | Specification of PRESSURE MEASUREMENT APPARATUS WITH SS TANK, U Tube Manometer, Inclined U Tube Manometer, Vacuum Gauge, Pressure Gauge | 1 | pieces | consignee1.eict.ptna | 45 | |
| 14 | STOKE LAW APPARATUS | Specification of STOKE LAW APPARATUS | 1 | pieces | consignee1.eict.ptna | 45 | |
| 15 | PIEZOMETER TUBE | Specification of PIEZOMETER TUBE | 4 | pieces | consignee1.eict.ptna | 45 | |
| 16 | POINTERorHOOK GAUGE MADE OF BRASS HEIGHT 50CM Pointer or Hook gauge made of brass height 50 cm | Specification of POINTERorHOOK GAUGE MADE OF BRASS HEIGHT 50CM Pointer or Hook gauge made of brass height 50 cm | 2 | pieces | consignee1.eict.ptna | 45 | |
| 17 | Water pumps | Specification of Water pumps | 3 | pieces | consignee1.eict.ptna | 45 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer