Progress
National Small Industries Corporation Limited (nsic) announces a tender for Composite 3D Printer: Fuse Filament Fabrication with Continuous Fibre Filament Fabrication Technolog, Resin Based 3D Printer with Stereo lithography (SLA) Technology, Metal Powder Based 3D Printer with Direct Metal Laser Sintering (DMLS) /Laser Powder Based Fusion (LP, Fuse Filament Fabrication 3D Printer, 3D Scanner, Reverse Engineering Software for Training compatible with Scanner, 3D Design Software, Desktop Computer (Workstation), Online UPS in GAYA, BIHAR. Quantity: 18. Submission Deadline: 26-09-2025 10: 00: 00. Last date to apply is approaching fast!
Quantity
18
Category
Composite 3D Printer: Fuse Filament Fabrication with Continuous Fibre Filament Fabrication Technolog
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
250
Past Performance
60 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Composite 3D Printer: Fuse Filament Fabrication with Continuous Fibre Filament Fabrication Technolog , Resin Based 3D Printer with Stereo lithography (SLA) Technology , Metal Powder Based 3D Printer with Direct Metal Laser Sintering (DMLS) /Laser Powder Based Fusion (LP , Fuse Filament Fabrication 3D Printer , 3D Scanner , Reverse Engineering Software for Training compatible with Scanner , 3D Design Software , Desktop Computer (Workstation) , Online UPS
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
26-Sep-2025, 4:30 am
Opening Date
26-Sep-2025, 5:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer