TenderDekho Logo
Active GEM

Bharat Petroleum Gate & Butterfly Valve Tender Shahjahanpur Uttar Pradesh 2026 IS/GB Standards

Bid Publish Date

29-Sep-2026, 4:14 pm

Bid End Date

20-Oct-2026, 4:00 pm

EMD

₹53,540

Progress

Issue29-Sep-2026, 4:14 pm
AwardPending

Key Highlights

  • • Exact EMD amount: ₹53,540
  • • Valve categories: Gate valves 12", 10" 8" 6"; Butterfly valves 6" 4" 3" 2.5"
  • • Location: Shahjahanpur, Uttar Pradesh
  • • Option clause: ±25% quantity; extended delivery period logic with minimum 30 days

Tender Overview

Organization: Bharat Petroleum Corporation Ltd. Procuring gate valves (12, 10, 8, 6 inches) and butterfly valves (6, 4, 3, 2.5 inches) for supply in SHAHJAHANPUR, UTTAR PRADESH. Estimated value not disclosed; EMD ₹53,540. Tender scope references 8 BOQ items with unspecified quantities. The contract includes an option clause allowing ±25% quantity variation and extended delivery timelines, binding bidders to the stated rates. Unique clause: delivery extension mechanics tied to original/extended periods, minimum 30 days. This procurement requires adherence to ATC terms uploaded by BPCL.

Technical Specifications & Requirements

  • Product category: Gate and butterfly valves (sizes listed above) for BPCL installations in UP.
  • No technical specs provided in tender data; bidders must rely on ATC for compliance.
  • Delivery location: Shahjahanpur, Uttar Pradesh.
  • EMD: ₹53,540.
  • BOQ: 8 items, no quantity details disclosed; expect itemized list in ATC and subsequent purchase order.
  • ATC/Standards: Refer to BPCL uploaded ATC document for any brand/OEM or standards requirements.
  • Experience expectation: Not specified in data; bidders should review ATC for eligibility.

Terms, Conditions & Eligibility

  • Option clause: Purchaser may increase/decrease quantity by up to 25% of bid quantity during contract and currency with contracted rates.
  • Delivery timeline: Calculated per option clause; minimum extension is 30 days; extensions depend on (additional quantity ÷ original quantity).
  • Payment terms: Not specified in the data; ATC should define milestones.
  • Documents: Submit EMD, GST, PAN, technical compliance as per ATC; OEM authorizations may be required.
  • ATC attachment: BPCL-uploaded ATC governs all bid-specific conditions.
  • BOQ ambiguity: 8 items, with N/A quantities; verify in ATC and final PO.

Key Specifications

  • Valve types: Gate and butterfly valves as listed in tender category

  • Sizes: Gate valves – 12", 10", 8", 6"; Butterfly valves – 6", 4", 3", 2.5"

  • EMD: ₹53,540

  • Quantity flexibility: ±25% as per option clause

  • Delivery: Compliance with BPCL ATC terms; delivery schedule defined in PO

  • Standards/brand: To be confirmed in ATC; expected OEM/brand alignment

  • BOQ: 8 items; quantities to be clarified in ATC

Terms & Conditions

  • EMD of ₹53,540 required with bid submission

  • Quantity adjustments allowed up to 25% during contract

  • Delivery period tied to original and extended periods with minimum 30 days

  • ATC documents govern all technical/commercial terms

  • 8 BOQ items; exact quantities disclosed in ATC and PO

Important Clauses

Payment Terms

Payment terms to be detailed in BPCL ATC; bidders must align with BPCL payment milestones

Delivery Schedule

Delivery period calculated per option clause; minimum extension 30 days; extensions per additional quantity

Penalties/Liquidated Damages

Penalties, LD, or performance bonds to be defined in ATC; ensure compliance with delivery commitments

Bidder Eligibility

  • Experience in supplying gate and butterfly valves to energy/industrial sectors

  • Financial stability evidenced by latest financials

  • Valid GST registration and PAN

  • OEM authorization or compliance as required by BPCL ATC

Advertisement

Tender Data

Bid Details

Quantity

41

Category

Gate valve 12 inches

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

OEM Avg. Turnover

5

Past Performance

80 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Gate valve 12 inches , Gate valve 10 inches , Gate valve 8 inches , Gate valve 6 inches , Butterfly valve 6 inches , Butterfly valve 4 inches , Butterfly valve 3 inches , Butterfly valve 2.5 inches

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Shahjahanpur

Delivery Pincodes

242307

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Prankur Yadav242307,Banthra Depot, Near Banthra Railway Station, Village BanthraShahjahanpurUttar Pradesh242307360-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9963456.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 8 Items Sign in for GEM prices

#1

Gate valve 12 inches

Gate valve 12 inches

3 pieces Delivery: 60 days
#2

Gate valve 10 inches

Gate valve 10 inches

4 pieces Delivery: 60 days
#3

Gate valve 8 inches

Gate valve 8 inches

3 pieces Delivery: 60 days
#4

Gate valve 6 inches

Gate valve 6 inches

2 pieces Delivery: 60 days
#5

Butterfly valve 6 inches

Butterfly valve 6 inches

5 pieces Delivery: 60 days
#6

Butterfly valve 4 inches

Butterfly valve 4 inches

8 pieces Delivery: 60 days
#7

Butterfly valve 3 inches

Butterfly valve 3 inches

8 pieces Delivery: 60 days
#8

Butterfly valve 2.5 inches

Butterfly valve 2.5 inches

8 pieces Delivery: 60 days

Categories 14

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar valve supply projects

4

Financial statements for the last 2 fiscal years

5

EMD submission proof (UAT/DD/online payment receipt)

6

Technical bid documentation showing product compliance

7

OEM authorization letters (if required by BPCL ATC)

8

Any specific BPCL ATC forms or compliance certificates

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for BPCL valve tender in Shahjahanpur UP 2026?

Submit EMD ₹53,540 with bid; attach GST, PAN, financials, and experience certs; review BPCL ATC for valve-specific requirements and possible OEM authorizations; ensure compliance with option clause and delivery extensions.

What documents are required for BPCL gate valve procurement in Uttar Pradesh?

Provide GST certificate, PAN, company financials, experience certificates for valve supply, EMD proof, technical bid, and OEM authorization if mandated by BPCL ATC; additional BPCL forms may be required.

What are the valve sizes included in the BPCL tender in UP 2026?

Sizes include gate valves of 12", 10", 8", 6" and butterfly valves of 6", 4", 3", 2.5"; quantities and exact models to be confirmed in the ATC and final PO.

What are the delivery terms for BPCL valve tender in Shahjahanpur?

Delivery timelines are governed by the option clause; additional time is calculated as (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

What standards or certifications are required for BPCL valve supply?

Standards/brand requirements will be defined in the BPCL uploaded ATC; bidders should be ready to demonstrate OEM authorization and conformity to specified standards once ATC is accessed.

How is payment structured for BPCL valve procurement in UP?

Payment terms will be specified in the BPCL ATC; bidders should anticipate milestone-based payments aligned with delivery and acceptance as per ATC, with final settlement per PO terms.

What is the role of the ATC in BPCL tender for valves?

ATC governs all bid-specific conditions including technical specs, eligibility criteria, delivery, payment, and OEM requirements; bidders must thoroughly review and comply to submit a responsive bid.